← Back
Primarily 2 family with 1 store or office
1193 LIBERTY AVENUE
BROOKLYN · East New York-City Line · BIN 3094086
💬 Discuss this project
1920Year Built
3Stories
S2Building Class
R5Zoning
3,300 sfGross Floor Area
3Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 1193 LIBERTY AVENUE · 2,018 sf lot · 1.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionCivil
Permit Issued — active, not yet Signed-off
Floor 1Under Construction16p · 2 filings · 20 docs
CellarUnder Construction11p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EMDAD CONSTRUCTION2009/13/2026
1193 LIBERTY AV203/22/2026
1193 LIBERTY AVE JOSEPH G203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALNOUR CONSULTING1003/16/2026
A&A CONSULTING ENGINEERS PC402/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EMDAD CONSTRUCTION403/21/2026
CM3 DESIGN STUDIO603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMDAD CONSTRUCTION INCGeneral Contractor704/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
MAUCERI SIGN SYSTEMSScaffold106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALNOUR CONSULTING ENGINEE6071003/16/2026
A&A CONSULTING ENG. PC3252108/22/2023
Building Lifecycle
All (101)Filed (14)Permit Issued (5)Violation (7)Inspection (5)Objection (40)Special Inspection (30)
04/21/2026
Permit issued — Sign
B01038564-S6-SG
03/16/2026
Filed — Alteration
PROPOSED INSTALLATION OF ONE (1) NON-ADVERTISING ACCESSORY BUSINESS SIGN AND ONE (1) NON-ILLUMINATED FABRIC AWNING FOR AN EXISTING GROUND-FLOOR RESTAURANT (USE GROUP 6) AS PER PLAN. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B01038564-P4
03/16/2026
Objection resolved — Addressed
03/16/2026
Special inspection requirement — Final
Nouredine Benabdelhak
03/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nouredine Benabdelhak
03/09/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
02/26/2026
Objection raised — Zoning
02/26/2026
Objection raised — Cost
02/26/2026
Objection raised — Admin
02/26/2026
Objection raised — Other
02/26/2026
Objection raised — Other
02/26/2026
Objection raised — Other
02/17/2026
Filed — Alteration
PROPOSED INSTALLATION OF ONE (1) NON-ADVERTISING ACCESSORY BUSINESS SIGN AND ONE (1) NON-ILLUMINATED FABRIC AWNING FOR AN EXISTING GROUND-FLOOR RESTAURANT (USE GROUP 6) AS PER PLAN. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B01038564-S6
10/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2025
Filed — Alteration
PROPOSED INSTALLATION OF ONE (1) NON-ADVERTISING ACCESSORY BUSINESS SIGN AND ONE (1) NON-ILLUMINATED FABRIC AWNING FOR AN EXISTING GROUND-FLOOR RESTAURANT (USE GROUP 6) AS PER PLAN. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B01038564-P3
09/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Nouredine Benabdelhak
09/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nouredine Benabdelhak
09/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Nouredine Benabdelhak
09/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
Nouredine Benabdelhak
09/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
Nouredine Benabdelhak
07/21/2025
Permit issued — General Construction
B00922480-I1-GC
03/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/28/2025
Filed — Alteration
PROPOSED INSTALLATION OF ONE (1) NON-ADVERTISING ACCESSORY BUSINESS SIGN AND ONE (1) NON-ILLUMINATED FABRIC AWNING FOR AN EXISTING GROUND-FLOOR RESTAURANT (USE GROUP 6) AS PER PLAN. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B01038564-P2
02/12/2025
Permit issued — Plumbing
B01038564-S2-PL
02/11/2025
Permit issued — Foundation
B01069268-I1-FO
02/06/2025
Permit issued — General Construction
B01038564-I1-GC
01/27/2025
Filed — Alteration
Underpininng of exiting wall to lower existing footing to 4-feet below ground lelvel to prevent damage to existing foundation due to thaw and freeze forces
B01069268-P1
01/27/2025
Special inspection requirement — Underpinning
Nouredine Benabdelhak
01/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nouredine Benabdelhak
01/27/2025
Special inspection requirement — Concrete - Cast-In-Place
Nouredine Benabdelhak
01/27/2025
Special inspection requirement — Footing and Foundation
Nouredine Benabdelhak
01/27/2025
Special inspection requirement — Final
Nouredine Benabdelhak
01/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
Nouredine Benabdelhak
01/24/2025
Special inspection requirement — Concrete - Cast-In-Place
Nouredine Benabdelhak
01/24/2025
Special inspection requirement — Footing and Foundation
Nouredine Benabdelhak
01/24/2025
Special inspection requirement — Final
Nouredine Benabdelhak
01/24/2025
Special inspection requirement — Underpinning
Nouredine Benabdelhak
01/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nouredine Benabdelhak
01/09/2025
Filed — Alteration
PROPOSED INSTALLATION OF ONE (1) NON-ADVERTISING ACCESSORY BUSINESS SIGN AND ONE (1) NON-ILLUMINATED FABRIC AWNING FOR AN EXISTING GROUND-FLOOR RESTAURANT (USE GROUP 6) AS PER PLAN. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B01038564-P1
01/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nouredine Benabdelhak
01/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Nouredine Benabdelhak
01/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Nouredine Benabdelhak
01/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Nouredine Benabdelhak
01/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
Nouredine Benabdelhak
11/08/2024
Filed — Alteration
PROPOSED INSTALLATION OF ONE (1) NON-ADVERTISING ACCESSORY BUSINESS SIGN AND ONE (1) NON-ILLUMINATED FABRIC AWNING FOR AN EXISTING GROUND-FLOOR RESTAURANT (USE GROUP 6) AS PER PLAN. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B01038564-S4
06/26/2024
Filed — Alteration
PROPOSED INSTALLATION OF ONE (1) NON-ADVERTISING ACCESSORY BUSINESS SIGN AND ONE (1) NON-ILLUMINATED FABRIC AWNING FOR AN EXISTING GROUND-FLOOR RESTAURANT (USE GROUP 6) AS PER PLAN. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B01038564-S2
06/20/2024
Filed — Alteration
Underpininng of exiting wall to lower existing footing to 4-feet below ground lelvel to prevent damage to existing foundation due to thaw and freeze forces
B01069268-I1
06/05/2024
Filed — Alteration
PROPOSED INSTALLATION OF ONE (1) NON-ADVERTISING ACCESSORY BUSINESS SIGN AND ONE (1) NON-ILLUMINATED FABRIC AWNING FOR AN EXISTING GROUND-FLOOR RESTAURANT (USE GROUP 6) AS PER PLAN. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B01038564-I1
03/18/2024
Objection resolved — Addressed
03/06/2024
Objection resolved — Addressed
03/04/2024
Objection raised — Zoning
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedMAUCERI SIGN CO., INC04/21/2026
DOB NOWGeneral ConstructionPermit IssuedEMDAD CONSTRUCTION INC07/21/2025
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.02/12/2025
DOB NOWFoundationPermit IssuedEMDAD CONSTRUCTION INC02/11/2025
DOB NOWGeneral ConstructionPermit IssuedEMDAD CONSTRUCTION INC02/06/2025
1 project · most recent 03/16/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/16/2026Permit IssuedEMDAD CONSTRUCTION INCVentilation Systems
Ventilation
Dayton Model # 56JN9 3,403 CFM · Kitchen Exhaust ×2
MODEL # 56JN94 3,403 CFM · Exhaust Fan ×2
1 project · most recent 02/12/2024
FiledStatusContractorScope
02/12/2024——8 heads
3 projects · most recent 03/16/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/16/2026Permit IssuedAMERICAN STANDARD P&H CORGas, Water/Sanitary
02/12/2024———
12/07/2023——Gas
3 projects · most recent 02/08/2025
General Wiring
FiledStatusContractorScope
02/08/2025CompleteEXPERT ELECTRIC.CONT NY IGeneral Wiring
01/02/2025CancelledEXPERT ELECTRIC.CONT NY IGeneral Wiring
02/16/2024Permit IssuedFIBERTEK DATA & ELEC CORPGeneral Wiring
1 project · most recent 01/27/2025
FiledStatusContractorScope
01/27/2025Permit IssuedEMDAD CONSTRUCTION INC2 scope_items
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/15/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
03/16/2026FinalNouredine Benabdelhakprogress
03/16/2026Tenant Protection Plan Compliance—special
03/16/2026Fire-Resistant Penetrations and JointsNouredine Benabdelhakspecial
09/09/2025HVAC-R and service water piping design and insulationNouredine Benabdelhakenergy_progress
09/09/2025Fire-Resistant Penetrations and JointsNouredine Benabdelhakspecial
09/09/2025Tenant Protection Plan Compliance—special
09/09/2025Energy Code Compliance InspectionsNouredine Benabdelhakprogress
09/09/2025HVAC-R and service water heating equipmentNouredine Benabdelhakenergy_progress
09/09/2025HVAC-R and service water heating system controlsNouredine Benabdelhakenergy_progress
01/27/2025UnderpinningNouredine Benabdelhakspecial
01/27/2025Structural Stability – Alterations of existing buildingsNouredine Benabdelhakspecial
01/27/2025Concrete - Cast-In-PlaceNouredine Benabdelhakspecial
01/27/2025Footing and FoundationNouredine Benabdelhakprogress
01/27/2025FinalNouredine Benabdelhakprogress
01/27/2025Tenant Protection Plan Compliance—special
01/27/2025Tenant Protection Plan ComplianceNouredine Benabdelhakspecial
01/24/2025Concrete - Cast-In-PlaceNouredine Benabdelhakspecial
01/24/2025Footing and FoundationNouredine Benabdelhakprogress
01/24/2025FinalNouredine Benabdelhakprogress
01/24/2025UnderpinningNouredine Benabdelhakspecial
01/24/2025Structural Stability – Alterations of existing buildingsNouredine Benabdelhakspecial
01/08/2025Tenant Protection Plan Compliance—special
01/08/2025Fire-Resistant Penetrations and JointsNouredine Benabdelhakspecial
01/08/2025Energy Code Compliance InspectionsNouredine Benabdelhakprogress
01/08/2025HVAC-R and service water heating equipmentNouredine Benabdelhakenergy_progress
Latest 25 of 38.
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/26/2026B00922480-I1Request digital key ↗
08/26/2026B00939845-I1Request digital key ↗
08/26/2026B00961948-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications48
▸DOB NOWProgress Inspector Seal & Signature21
09/01/2026B01038564-P4Open ↗
09/01/2026B01038564-P3Open ↗
09/01/2026B01038564-P3Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/26/2026B00922480-I1Open ↗
08/26/2026B00961948-I1Open ↗
08/23/2026B01038564-P5Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026B01038564-P4Open ↗
09/01/2026B01038564-P3Open ↗
08/27/2026B01069268-I1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/26/2026B00922480-I1Open ↗
08/23/2026B01038564-P5Open ↗
08/23/2026B01069268-I1Open ↗
Showing 3 of 14 on file for this type