← Back
One family attached or semi-detached
1194 OLYMPIA BLVD
STATEN ISLAND · New Dorp-Midland Beach · BIN 5175568
💬 Discuss this project
2022Year Built
2Stories
A5Building Class
R3-1Zoning
1,800 sfGross Floor Area
1Units
One family attached or semi-detached · 2,000 sf lot · 0.9 FAR built · Flood zone AE
Locations of Work
Architecture
Floor 37p · 1 filing · 20 docs
Floor 27p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1196 OLYMPIA BLVD2607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C&P DESIGN CONSULTANTS212/05/2022
JAMES V MORRI511/17/2022
ROGERS CALVANICO GROUP PLLC105/17/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAMES V MORRI, RA503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MADONIA DEVELOPMENT CORPGeneral Contractor407/08/2026
DUO PLUMBING & HTG CORP.Plumbing207/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738412/05/2022
JAMES V MORRI, RA1042211/17/2022
Building Lifecycle
All (48)Filed (8)Permit Issued (6)Signed Off (4)Inspection (12)Objection (4)Special Inspection (14)
05/22/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/20/2022
Signed off — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00699309-S1
12/14/2022
Signed off — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00699309-S2
12/08/2022
Signed off — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00699309-S3
12/07/2022
Objection resolved — Addressed
12/06/2022
Objection raised — Scope
12/06/2022
Special inspection requirement — Mechanical Systems
anthony santoro
12/06/2022
Special inspection requirement — Final
anthony santoro
12/06/2022
Special inspection requirement — Maintenance information
anthony santoro
12/06/2022
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
12/06/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
12/06/2022
Special inspection requirement — Ventilation and air distribution system
anthony santoro
12/06/2022
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
12/05/2022
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00699309-P3
12/03/2022
Special inspection requirement — Mechanical Systems
anthony santoro
12/03/2022
Special inspection requirement — Final
anthony santoro
12/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
12/03/2022
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
12/03/2022
Special inspection requirement — Maintenance information
anthony santoro
12/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
12/03/2022
Special inspection requirement — Ventilation and air distribution system
anthony santoro
12/02/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/30/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/28/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/23/2022
Signed off — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00699309-S4
11/22/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/18/2022
Permit issued — Curb Cut
S00699309-S4-CC
11/18/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/17/2022
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00699309-P2
11/14/2022
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00699309-S4
11/14/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/11/2022
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
11/10/2022
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00699309-P1
11/03/2022
Permit issued — Mechanical Systems
S00699309-S2-MS
10/29/2022
Permit issued — Plumbing
S00699309-S1-PL
09/21/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/15/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/08/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/01/2022
Permit issued — Plumbing
S34784273-S3-PL
07/16/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/12/2022
Permit issued — Plumbing
S00699309-S3-PL
07/05/2022
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00699309-S3
06/28/2022
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00699309-S2
06/17/2022
Permit issued — General Construction
S00699309-I1-GC-CX
05/17/2022
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00699309-S1
05/02/2022
Objection raised — Scope
05/02/2022
Objection resolved — Addressed
04/05/2022
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00699309-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMADONIA DEVELOPMENT CORP11/18/2022
DOB NOWMechanical SystemsSigned-offMADONIA DEVELOPMENT CORP11/03/2022
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.10/29/2022
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC08/01/2022
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.07/12/2022
DOB NOWGeneral ConstructionPermit IssuedMADONIA DEVELOPMENT CORP06/17/2022
1 project · most recent 12/05/2022
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/05/2022Signed-offMADONIA DEVELOPMENT CORPAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Rheem RHEEM RCF4821STAMCA / DAIKIN DX13SA0481AF 58,000 BTU · Condensing Unit ×2
Heating
Rheem R802TA100521MSA 64,000 BTU · Condensing Unit ×2
Ventilation
Broan B130E65RT 115 CFM · Erv ×2
Ducts & Piping
N/A N/A 1 BTU ×2
1 project · most recent 12/05/2022
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
12/05/2022Signed-offDUO PLUMBING & HTG CORP.Gas, Plumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 08/30/2022
General Wiring
FiledStatusContractorScope
08/30/2022CompleteCATELLO ELEC'L CONT., INCGeneral Wiring
1 project · most recent 12/05/2022
Concrete Wood
FiledStatusContractorScope
12/05/2022Signed-offMADONIA DEVELOPMENT CORPConcrete, Wood
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
05/22/2024Fail-Final General Construction Non-Directive 14FailView ↗
12/02/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/30/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/22/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
11/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/14/2022Pass-Final CND-Occupancy InspectionPassView ↗
11/11/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
09/21/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/15/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
12/06/2022Mechanical Systemsanthony santorospecial
12/06/2022Finalanthony santoroprogress
12/06/2022Maintenance informationanthony santoroenergy_progress
12/06/2022HVAC-R and service water heating equipmentanthony santoroenergy_progress
12/06/2022HVAC-R and service water piping design and insulationanthony santoroenergy_progress
12/06/2022Ventilation and air distribution systemanthony santoroenergy_progress
12/06/2022HVAC-R and service water heating system controlsanthony santoroenergy_progress
12/03/2022Mechanical Systemsanthony santorospecial
12/03/2022Finalanthony santoroprogress
12/03/2022HVAC-R and service water piping design and insulationanthony santoroenergy_progress
12/03/2022HVAC-R and service water heating system controlsanthony santoroenergy_progress
12/03/2022Maintenance informationanthony santoroenergy_progress
12/03/2022HVAC-R and service water heating equipmentanthony santoroenergy_progress
12/03/2022Ventilation and air distribution systemanthony santoroenergy_progress
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026S00699309-S3Request digital key ↗
08/24/2026S00699309-S2Request digital key ↗
08/24/2026S00699309-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
08/16/2022540216372Open ↗
03/31/2022540216372Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
03/31/2022540216372Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00699309-I1Open ↗
08/13/2026S00699309-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00699309-I1Open ↗
08/13/2026S00699309-P2Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
08/16/2022540216372Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00699309-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026S00699309-P2Open ↗
08/24/2026S00699309-P1Open ↗
08/24/2026S00699309-S3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026S00699309-S2Open ↗
08/28/2026S00699309-S2Open ↗
08/27/2026S00699309-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026S00699309-S2Open ↗
08/27/2026S00699309-P3Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/31/2022540216372Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/31/2022540216372Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00699309-P2Open ↗
08/13/2026S00699309-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026S00699309-I1Open ↗
08/13/2026S00699309-P2Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00699309-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00699309-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00699309-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00699309-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT2
08/13/2026S00699309-P2Open ↗
08/13/2026S00699309-I1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
03/31/2022540216372Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/31/2022540216372Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00699309-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00699309-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
08/16/2022540216372Open ↗
03/31/2022540216372Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
03/31/2022540216372Open ↗
▸Other Documents16
▸DOB NOWProperty Ownership Certification6
08/24/2026S00699309-S3Open ↗
08/24/2026S00699309-S2Open ↗
08/24/2026S00699309-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)3
08/13/2026S00699309-S2Open ↗
08/13/2026S00699309-I1Open ↗
08/13/2026S00699309-S1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00699309-I1Open ↗
08/13/2026S00699309-P2Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S00699309-P2Open ↗
08/13/2026S00699309-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
03/31/2022540216372Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00699309-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00699309-I1Open ↗