One story retail building
1196 HYLAN BOULEVARD
STATEN ISLAND · BIN 5047510
💬 Discuss this project
1959Year Built
1Stories
K1Building Class
R3-2Zoning
2,175 sfGross Floor Area
1Units
One story retail building · Owner of record: PLAZA DINAPOLI LLC · 5,147 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
Structural
Floor 11p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE106/13/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALBA INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THINK DESIGN ARCHITECTURA683106/13/2024
Building Lifecycle
All (5)Filed (1)Permit Issued (1)Signed Off (1)Inspection (1)Special Inspection (1)
11/12/2024
Signed off — Alteration
Application is filed for the new installation of a 6-0 A.D.A accessible concrete ramps at OSP of an existing 1-story commercial building. All work is located at OSP, no change to use, egress or occupancy. All work as per plans submitted herewith.
S01063577-I1
11/08/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/17/2024
Permit issued — General Construction
S01063577-I1-GC
06/13/2024
Filed — Alteration
Application is filed for the new installation of a 6-0 A.D.A accessible concrete ramps at OSP of an existing 1-story commercial building. All work is located at OSP, no change to use, egress or occupancy. All work as per plans submitted herewith.
S01063577-I1
06/07/2024
Special inspection requirement — Concrete - Cast-In-Place
Frank Martarella III
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offALBA10/17/2024
BISOTISSUEDTHE POSH ORGANIZATION INC. T/A04/23/2003
BISPLISSUEDDOMENICK NATALE PLBG & HTG CO.04/23/2003
BISOTISSUEDCOIN IT KLEEN ROUTE CO. INC.02/25/1993
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/08/2024Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
06/07/2024Concrete - Cast-In-PlaceFrank Martarella IIIspecial
▾Documents — 3 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026S01063577-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01063577-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026S01063577-I1Open ↗