← Back
Two family converted from one family
1199 SHEEPSHEAD BAY ROAD
BROOKLYN · BIN 3202903
💬 Discuss this project
1930Year Built
2.5Stories
B3Building Class
R4Zoning
2,140 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Two family converted from one family · 5,225 sf lot · 0.41 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Roof9p · 1 filing · 12 docs
Floor 212p · 2 filings · 15 docs
Floor 112p · 2 filings · 15 docs
Cellar14p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JASCO607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/10/2022$1.5M—— → —$689/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MIB CONSULTING403/14/2023
ASR ENGINEERING PC112/20/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORELL BUILDERS INCGeneral Contractor603/21/2026
JASCO, INCGeneral Contractor407/08/2026
MKSSKR CONSULTING SERVICEGeneral Contractor107/08/2026
AL PLUMBING & CONT. INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MARKANICS CORP4600303/14/2023
Building Lifecycle
All (49)Filed (5)Permit Issued (6)Signed Off (1)Violation (2)Inspection (5)Objection (2)Special Inspection (28)
09/08/2026
Violation issued (ECB, open)
Construction
06/02/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/21/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/10/2025
Permit issued — Plumbing
B00696565-I1-PL
04/13/2024
Signed off — Alteration
B00801013-I1
01/18/2024
Permit issued — Sidewalk Shed
B00801013-I1-SH
03/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malcolm Barkan
03/15/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malcolm Barkan
03/15/2023
Special inspection requirement — Fire-Resistance Rated Construction
Malcolm Barkan
03/15/2023
Special inspection requirement — Energy Code Compliance Inspections
Malcolm Barkan
03/15/2023
Special inspection requirement — Fenestration air leakage
Malcolm Barkan
03/15/2023
Special inspection requirement — Insulation placement and R values
Malcolm Barkan
03/15/2023
Special inspection requirement — Maintenance information
Malcolm Barkan
03/15/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Malcolm Barkan
03/15/2023
Special inspection requirement — Permanent certificate
Malcolm Barkan
03/15/2023
Special inspection requirement — Interior lighting power
Malcolm Barkan
03/15/2023
Special inspection requirement — Ventilation and air distribution system
Malcolm Barkan
03/15/2023
Special inspection requirement — Air barrier - visual inspection
Malcolm Barkan
03/15/2023
Special inspection requirement — Metering
Malcolm Barkan
03/15/2023
Special inspection requirement — Fenestration areas
Malcolm Barkan
03/14/2023
Filed — Alteration
PROPOSED TO PROVIDE PARTITION PLANS FOR EXISTING 2 FAMILY 2.5 STORY HOUSE AS PER PLANS. PLUMBING PLANS FILED ON JOB# B00696565 NO CHANGE IN USE EGRESS OR OCCUPANCY FOR THIS APPLICATION . fence plans filed on job # B00769004
B00771590-P1
03/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malcolm Barkan
03/14/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malcolm Barkan
03/14/2023
Special inspection requirement — Energy Code Compliance Inspections
Malcolm Barkan
03/14/2023
Special inspection requirement — Fire-Resistance Rated Construction
Malcolm Barkan
03/14/2023
Special inspection requirement — Ventilation and air distribution system
Malcolm Barkan
03/14/2023
Special inspection requirement — Interior lighting power
Malcolm Barkan
03/14/2023
Special inspection requirement — Air barrier - visual inspection
Malcolm Barkan
03/14/2023
Special inspection requirement — Maintenance information
Malcolm Barkan
03/14/2023
Special inspection requirement — Metering
Malcolm Barkan
03/14/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Malcolm Barkan
03/14/2023
Special inspection requirement — Permanent certificate
Malcolm Barkan
03/14/2023
Special inspection requirement — Insulation placement and R values
Malcolm Barkan
03/14/2023
Special inspection requirement — Fenestration areas
Malcolm Barkan
03/14/2023
Special inspection requirement — Fenestration air leakage
Malcolm Barkan
12/20/2022
Filed — Alteration
B00801013-I1
12/20/2022
Permit issued — Sidewalk Shed
B00801013-I1-SH
12/14/2022
Permit issued — Construction Fence
B00769004-I1-FN
09/19/2022
Filed — Alteration
B00696565-I1
09/13/2022
Permit issued — General Construction
B00771590-I1-GC
09/01/2022
Filed — Alteration
PROPOSED TO PROVIDE PARTITION PLANS FOR EXISTING 2 FAMILY 2.5 STORY HOUSE AS PER PLANS. PLUMBING PLANS FILED ON JOB# B00696565 NO CHANGE IN USE EGRESS OR OCCUPANCY FOR THIS APPLICATION . fence plans filed on job # B00769004
B00771590-I1
07/12/2022
Permit issued — Construction Fence
B00769004-I1-FN
07/08/2022
Objection resolved — Addressed
07/07/2022
Objection raised — Scope
07/05/2022
Filed — Alteration
PROPOSE TO PROVIDE A CONSTRUCTION FENCE WITH PROPERTY LINE FOR EXISTING 2.5 STORY 2 FAMILY HOUSE. GC PARTITION PLANS FILED ON JOB# B00771590
B00769004-I1
07/04/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAL PLUMBING & CONT. INC02/10/2025
DOB NOWSidewalk ShedSigned-offJASCO, INC01/18/2024
DOB NOWSidewalk ShedSigned-offJASCO, INC12/20/2022
DOB NOWConstruction FencePermit IssuedMORELL BUILDERS INC12/14/2022
DOB NOWGeneral ConstructionPermit IssuedMORELL BUILDERS INC09/13/2022
DOB NOWConstruction FencePermit IssuedMKSSKR CONSULTING SERVICE07/12/2022
BISOTISSUEDLEON CONSTRUCTION07/27/2006
BISOTISSUEDLEON CONSTRUCTION05/06/2002
BISPLISSUEDMICHAEL B ALFONSO12/20/2001
3 projects · most recent 03/19/2024
General Wiring Lighting
FiledStatusContractorScope
03/19/2024Permit IssuedNAS ELECTRIC CORPGeneral Wiring, Lighting
12/25/2022Permit IssuedRICHARD NEU—
07/05/2022Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 07/05/2022
Fence
FiledStatusContractorScope
07/05/2022Permit IssuedMORELL BUILDERS INCFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/21/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
03/15/2023Fire-Resistant Penetrations and JointsMalcolm Barkanspecial
03/15/2023Structural Stability – Alterations of existing buildingsMalcolm Barkanspecial
03/15/2023Fire-Resistance Rated ConstructionMalcolm Barkanprogress
03/15/2023Energy Code Compliance InspectionsMalcolm Barkanprogress
03/15/2023Fenestration air leakageMalcolm Barkanenergy_progress
03/15/2023Insulation placement and R valuesMalcolm Barkanenergy_progress
03/15/2023Maintenance informationMalcolm Barkanenergy_progress
03/15/2023Fenestration and door U-factor and product ratingsMalcolm Barkanenergy_progress
03/15/2023Permanent certificateMalcolm Barkanenergy_progress
03/15/2023Interior lighting powerMalcolm Barkanenergy_progress
03/15/2023Ventilation and air distribution systemMalcolm Barkanenergy_progress
03/15/2023Air barrier - visual inspectionMalcolm Barkanenergy_progress
03/15/2023MeteringMalcolm Barkanenergy_progress
03/15/2023Fenestration areasMalcolm Barkanenergy_progress
03/14/2023Fire-Resistant Penetrations and JointsMalcolm Barkanspecial
03/14/2023Structural Stability – Alterations of existing buildingsMalcolm Barkanspecial
03/14/2023Energy Code Compliance InspectionsMalcolm Barkanprogress
03/14/2023Fire-Resistance Rated ConstructionMalcolm Barkanprogress
03/14/2023Ventilation and air distribution systemMalcolm Barkanenergy_progress
03/14/2023Interior lighting powerMalcolm Barkanenergy_progress
03/14/2023Air barrier - visual inspectionMalcolm Barkanenergy_progress
03/14/2023Maintenance informationMalcolm Barkanenergy_progress
03/14/2023MeteringMalcolm Barkanenergy_progress
03/14/2023Fenestration and door U-factor and product ratingsMalcolm Barkanenergy_progress
03/14/2023Permanent certificateMalcolm Barkanenergy_progress
Latest 25 of 28.
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/29/2026B00769004-I1Request digital key ↗
08/28/2026B00696565-I1Request digital key ↗
08/28/2026B00801013-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026B00696565-I1Open ↗
08/28/2026B00801013-I1Open ↗
08/27/2026B00771590-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026B00771590-I1Open ↗
08/29/2026B00771590-I1Open ↗
08/25/2026B00771590-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026B00771590-I1Open ↗
08/25/2026B00771590-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/28/2026B00696565-I1Open ↗
08/27/2026B00771590-I1Open ↗
08/27/2026B00771590-P1Open ↗