← Back
Elevator apt, fireproof without stores
The Bennett Condominium
12-16 30 AVENUE · BIN 4623970
💬 Discuss this project
2023Year Built
—Stories
D3Building Class
R6AZoning
17,820 sfGross Floor Area
16Units
0 Open Violations
Elevator apt, fireproof without stores · Owner of record: BLD ASTORIA LLC · 7,400 sf lot · 2.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof2p · 4 filings · 20 docs
Bulkhead3p · 2 filings · 17 docs
Floor 54p · 4 filings · 20 docs
Floor 43p · 4 filings · 20 docs
Floor 35p · 4 filings · 20 docs
Floor 24p · 4 filings · 20 docs
Floor 13p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TSOUMPAS 1216 GROUP2407/08/2026
TSOUMPAS 203 HOLDINGS1307/08/2026
OWNERS REP707/08/2026
THREE STAR CONSTRUCTION GROUP503/22/2026
BLD ASTORIA LLC1103/22/2026
K-SQUARE DEVELOPERS1003/22/2026
K-SQUARE DEVELOPMENT INC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/01/2021$3.2M—TSOUMPAS 1216 GROUP LLC → BLD ASTORIA LLC— not available
05/30/2019$3.8M—Private party → TSOUMPAS 1216 GROUP, LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AM PROFESSIONALS803/21/2026
D S CREATIVE INOVATIONS403/21/2026
AE DESIGN SOLUTION803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
K-SQUARE DEVELOPERS INCGeneral Contractor907/08/2026
THREE STAR CONSTRUCTION GGeneral Contractor303/21/2026
VSP MECHANICAL INCPlumbing307/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor207/08/2026
GRANDEUR CONSULTING GROUPGeneral Contractor206/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EMPIRE DESIGN CORP5474112/28/2023
CENTURY TESTING & CONSULT4081909/12/2023
Building Lifecycle
All (108)Filed (18)Permit Issued (16)Signed Off (8)Violation (12)Inspection (4)Objection (32)Special Inspection (18)
07/13/2026
Signed off — Alteration
Curb cut application as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB#420667237
Q00361073-I1
07/09/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/03/2026
Permit issued — Curb Cut
Q00361073-I1-CC
10/09/2025
Signed off — Alteration
MS application filed in conjunction with NB#420667237. No change to use, egress, or occupancy.
Q00349971-I1
09/26/2025
Permit issued — Mechanical Systems
Q00349971-I1-MS
08/18/2025
Signed off — Alteration
Sprinkler work as per plans filed in conjunction with NB# 420667237. No change to use, egress, or occupancy.
Q00376972-I1
03/10/2025
Signed off — Alteration
filing for structure work in conjunction with nb#420667237
Q00673264-I1
02/18/2025
Signed off — Alteration
Provide new plumbing system (Domestic water system, storm water system, sanitary water system) for entire building in according with 2014building code, 2014 building code and 2016 NYC energy conservation code. Plumbing work only.
Q00347116-I1
12/19/2024
Objection resolved — Addressed
12/18/2024
Objection raised — Other
12/10/2024
Filed — Alteration
MS application filed in conjunction with NB#420667237. No change to use, egress, or occupancy.
Q00349971-P2
12/05/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00894892-I1
12/05/2024
Signed off — Alteration
Q00760917-I1
11/07/2024
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 12-16 30TH AVENUE, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q00978208-I1
08/05/2024
Violation issued (ECB, closed)
Construction
07/29/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/02/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00894892-P3
06/21/2024
Permit issued — Sidewalk Shed
Q00894892-I1-SH
05/27/2024
Violation issued (ECB, closed)
Construction
05/20/2024
Special inspection requirement — Mechanical Systems
05/20/2024
Special inspection requirement — Maintenance information
05/20/2024
Special inspection requirement — HVAC and service water heating system controls
05/20/2024
Special inspection requirement — HVAC insulation and sealing
05/20/2024
Special inspection requirement — Shutoff dampers
05/20/2024
Special inspection requirement — HVAC and service water heating equipment
05/20/2024
Special inspection requirement — Final
05/20/2024
Special inspection requirement — Energy Code Compliance Inspections
04/30/2024
Permit issued — Construction Fence
Q00760917-I1-FN
03/11/2024
Violation issued (ECB, closed)
Unknown
03/11/2024
Violation issued (ECB, closed)
Construction
12/29/2023
Permit issued — Supported Scaffold
Q00978208-I1-SF
12/28/2023
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 12-16 30TH AVENUE, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q00978208-I1
12/18/2023
Special inspection requirement — Post-installed Anchors
Md Rashid
12/07/2023
Permit issued — Plumbing
Q00347116-I1-PL
10/13/2023
Special inspection requirement — Concrete - Cast-In-Place
ALDO BRAVO
10/13/2023
Special inspection requirement — Structural Cold-Formed Steel
ALDO BRAVO
10/13/2023
Special inspection requirement — Final
FRANZ SEBORGA
10/05/2023
Violation issued (ECB, closed)
Construction
10/05/2023
Violation issued (ECB, closed)
Construction
09/12/2023
Filed — Alteration
filing for structure work in conjunction with nb#420667237
Q00673264-P2
08/18/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00894892-P2
07/27/2023
Violation issued (ECB, closed)
Construction
07/27/2023
Violation issued (ECB, closed)
Construction
07/27/2023
Violation issued (ECB, closed)
Construction
07/27/2023
Violation issued (ECB, closed)
Construction
07/26/2023
Violation issued (ECB, closed)
Construction
07/11/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00894892-P1
06/28/2023
Permit issued — Sidewalk Shed
Q00894892-I1-SH
06/27/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00894892-I1
05/03/2023
Permit issued — Construction Fence
Q00760917-I1-FN
04/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANZ SEBORGA
04/14/2023
Special inspection requirement — Sprinkler Systems
FRANZ SEBORGA
04/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
04/07/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/07/2023
Objection resolved — Addressed
04/05/2023
Filed — Alteration
Provide new plumbing system (Domestic water system, storm water system, sanitary water system) for entire building in according with 2014building code, 2014 building code and 2016 NYC energy conservation code. Plumbing work only.
Q00347116-P2
04/05/2023
Objection raised — Other
04/05/2023
Objection raised — Other
04/05/2023
Objection resolved — Addressed
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offGRANDEUR CONSULTING GROUP06/03/2026
DOB NOWMechanical SystemsSigned-offGRANDEUR CONSULTING GROUP09/26/2025
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC06/21/2024
DOB NOWConstruction FenceSigned-offK-SQUARE DEVELOPERS INC04/30/2024
DOB NOWSupported ScaffoldSigned-offTHREE STAR CONSTRUCTION G12/29/2023
DOB NOWPlumbingSigned-offEMR MECHANICAL CORP12/07/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC06/28/2023
DOB NOWConstruction FenceSigned-offK-SQUARE DEVELOPERS INC05/03/2023
DOB NOWPlumbingSigned-offEMR MECHANICAL CORP03/24/2023
DOB NOWStructuralSigned-offK-SQUARE DEVELOPERS INC02/22/2023
DOB NOWConstruction FenceSigned-offK-SQUARE DEVELOPERS INC02/22/2023
DOB NOWStructuralSigned-offK-SQUARE DEVELOPERS INC02/03/2023
DOB NOWConstruction FenceSigned-offK-SQUARE DEVELOPERS INC02/03/2023
DOB NOWPlumbingSigned-offEMR MECHANICAL CORP12/09/2022
DOB NOWConstruction FenceSigned-offK-SQUARE DEVELOPERS INC07/14/2022
DOB NOWStructuralSigned-offK-SQUARE DEVELOPERS INC06/28/2022
BIS—ISSUEDK-SQUARE DEVELOPERS INC02/13/2025
BIS—ISSUEDK-SQUARE DEVELOPERS INC04/29/2024
BIS—ISSUEDK-SQUARE DEVELOPERS INC05/01/2023
BIS—ISSUEDK-SQUARE DEVELOPERS INC03/07/2023
BIS—ISSUEDK-SQUARE DEVELOPERS INC03/07/2023
BIS—ISSUEDK-SQUARE DEVELOPERS INC07/19/2022
BIS—ISSUEDK-SQUARE DEVELOPERS INC07/19/2022
3 projects · most recent 05/08/2026
General Wiring
FiledStatusContractorScope
05/08/2026CompleteTUXEDO ELEC'L CONTR'G INC—
03/12/2025CompleteAMERICAN POWER ELECT CONSGeneral Wiring
06/21/2023CompleteSOLAS ELECTRICAL CORP—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/09/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
07/29/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/07/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/07/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
05/20/2024Mechanical Systems—special
05/20/2024Maintenance information—energy_progress
05/20/2024HVAC and service water heating system controls —energy_progress
05/20/2024HVAC insulation and sealing —energy_progress
05/20/2024Shutoff dampers—energy_progress
05/20/2024HVAC and service water heating equipment —energy_progress
05/20/2024Final—progress
05/20/2024Energy Code Compliance Inspections—progress
12/18/2023Post-installed AnchorsMd Rashidspecial
10/13/2023Concrete - Cast-In-PlaceALDO BRAVOspecial
10/13/2023Structural Cold-Formed SteelALDO BRAVOspecial
10/13/2023FinalFRANZ SEBORGAprogress
04/14/2023Fire-Resistant Penetrations and JointsFRANZ SEBORGAspecial
04/14/2023Sprinkler SystemsFRANZ SEBORGAspecial
04/09/2023Fire-Resistant Penetrations and JointsALDO BRAVOspecial
04/05/2023Fire-Resistant Penetrations and JointsALDO BRAVOspecial
01/06/2023Sprinkler SystemsALDO BRAVOspecial
01/06/2023Fire-Resistant Penetrations and JointsALDO BRAVOspecial
▾Documents — 194 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch9
08/26/2026Q00760917-I1Request digital key ↗
08/24/2026Q00894892-I1Request digital key ↗
08/24/2026Q00894892-P3Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/25/2026Q00347116-P2Request digital key ↗
08/15/2026Q00347116-P1Request digital key ↗
08/15/2026Q00347116-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/25/2026Q00349971-P2Request digital key ↗
08/15/2026Q00349971-I1Request digital key ↗
08/15/2026Q00349971-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/28/2026Q00376972-I1Request digital key ↗
08/14/2026Q00376972-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/15/2026Q00361073-I1Request digital key ↗
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION21
07/14/2025421842616Open ↗
04/24/2025421842616Open ↗
04/18/2025440601788Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION3
10/24/2022420667237Open ↗
10/24/2022420667237Open ↗
10/24/2022420667237Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation3
11/13/2024440601788Open ↗
08/18/2020440601788Open ↗
06/30/2020440601788Open ↗
▸Zoning, Tax Lot & Property Records12
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
05/06/2025421842616Open ↗
10/19/2020420667237Open ↗
▸BISZONING DIAGRAM2
08/04/2022420667237Open ↗
10/23/2020420667237Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
05/06/2025421842616Open ↗
09/29/2020420667237Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION2
05/06/2025421842616Open ↗
10/19/2020420667237Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/06/2025421842616Open ↗
▸BISVERIFY TAX LOT1
03/06/2025420667237Open ↗
▸BISFLOOD ZONE COMPLIANCE1
07/22/2025420667237Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/10/2025420667237Open ↗
▸Seals & Professional Certifications29
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/28/2026Q00361073-I1Open ↗
08/28/2026Q00376972-P1Open ↗
08/28/2026Q00376972-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/21/2026Q00347116-P2Open ↗
08/31/2026Q00376972-I1Open ↗
08/29/2026Q00347116-I1Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/30/2020440601788Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/24/2022420667237Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026Q00673264-I1Open ↗
▸Trade Schedules & Equipment3
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
07/22/2025420667237Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
07/22/2025420667237Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
07/10/2025420667237Open ↗
▸Safety & Tenant Protection9
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
07/13/2023420667237Open ↗
12/30/2022420667237Open ↗
10/24/2022420667237Open ↗
▸BISSTREET TREE CHECKLIST3
09/29/2020420667237Open ↗
08/18/2020440601788Open ↗
07/23/2020440601788Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/29/2022420667237Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/20/2020440601788Open ↗
▸BISSTREET TREE SIGNOFF1
11/10/2025420667237Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
07/14/2025420667237Open ↗
09/14/2022420667237Open ↗
06/29/2022420667237Open ↗
Showing 3 of 8 on file for this type
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION3
01/29/2025420667237Open ↗
01/22/2025420667237Open ↗
01/08/2025420667237Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
07/22/2025420667237Open ↗
▸BISINTERIOR LIGHTING POWER1
07/22/2025420667237Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/22/2025420667237Open ↗
▸BISFENESTRATION AREAS1
07/22/2025420667237Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/22/2025420667237Open ↗
▸BISLIGHTING IN DWELLING UNITS1
07/22/2025420667237Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/22/2025420667237Open ↗
▸BISLIGHTING CONTROLS1
07/22/2025420667237Open ↗
▸BIS* HVAC INSULATION AND SEALING1
07/22/2025420667237Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/24/2022420667237Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00349971-I1Open ↗
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY10
07/14/2025420667237Open ↗
06/29/2022420667237Open ↗
06/23/2022420667237Open ↗
Showing 3 of 10 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
11/10/2025420667237Open ↗
07/19/2022420667237Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
07/22/2025420667237Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
06/23/2022420667237Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
10/03/2023420667237Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
07/22/2025420667237Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/22/2025420667237Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
07/22/2025420667237Open ↗
▸BISMASONRY1
07/22/2025420667237Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
07/22/2025420667237Open ↗
▸BISMASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS1
07/22/2025420667237Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
10/24/2022420667237Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
07/22/2025420667237Open ↗
▸BISSOIL REPORT1
09/29/2020420667237Open ↗
▸DOB NOWConcrete Testing Exception Report1
08/13/2026Q00673264-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE7
04/07/2025420667237Open ↗
04/03/2025420667237Open ↗
04/02/2025420667237Open ↗
Showing 3 of 7 on file for this type
▸Cost, Insurance & Ownership1
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
12/02/2022420667237Open ↗
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION12
12/12/2024420667237Open ↗
11/27/2024420667237Open ↗
09/28/2022420667237Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET3
07/16/2025421842616Open ↗
09/02/2020420667237Open ↗
05/05/2020420667237Open ↗
▸Other Documents10
▸BISPLOT DIAGRAM2
08/04/2022420667237Open ↗
10/19/2020420667237Open ↗
▸BISSHUTOFF DAMPERS1
07/22/2025420667237Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
09/29/2020420667237Open ↗
▸BISLOWEST FLOOR ELEVATION1
07/22/2025420667237Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
07/22/2025420667237Open ↗
▸BISMAINTENANCE INFORMATION1
07/22/2025420667237Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
07/22/2025420667237Open ↗
▸BISSITE CONNECTION:DEP1
10/24/2022420667237Open ↗
▸BISUNDERPINNING (2014)1
07/22/2025420667237Open ↗