← Back
Two stories - detached, small or mid-size
12-16 BEACH 9TH STREET
QUEENS · BIN 4623920
💬 Discuss this project
2023Year Built
2Stories
A1Building Class
R3XZoning
3,526 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · Owner of record: 12-16 BEACH 9TH LLC · 6,251 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof1p · 1 filing · 5 docs
Floor 21p · 1 filing · 8 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
12-12 BEACH 9 ST603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/07/2024$1.8M—1212 BEACH 9TH STREET LLC → 12-16 BEACH 9TH LLC$510/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IMA ENGINEERING, PC310/29/2025
KBN SERVICES LLC105/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IMA ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL-BORO REHAB CONSTRCT CGeneral Contractor1104/09/2026
ALL-BORO REHAB CONST CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAVID KATZ, P.E.6087310/29/2025
Building Lifecycle
All (32)Filed (4)Permit Issued (7)Signed Off (3)Violation (1)Inspection (6)Objection (4)Special Inspection (7)
06/17/2026
Signed off — Alteration
Q00691662-I1
04/08/2026
Signed off — Alteration
PLUMBING WORK TYPE IN CONJUNCTION WITH NB APPLICATION # 421807664
Q00710752-I1
12/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Katz
12/01/2025
Special inspection requirement — Energy Code Compliance Inspections
David Katz
11/03/2025
Signed off — Alteration
Q00921711-I1
10/30/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/29/2025
Filed — Alteration
PLUMBING WORK TYPE IN CONJUNCTION WITH NB APPLICATION # 421807664
Q00710752-P1
10/20/2025
Permit issued — Curb Cut
Q00921711-I1-CC
10/07/2025
Objection resolved — Addressed
09/09/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Katz
09/08/2025
Special inspection requirement — Energy Code Compliance Inspections
David Katz
01/24/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/13/2024
Violation issued (ECB, closed)
Unknown
08/29/2024
Objection raised — Accessibility
08/22/2024
Filed — Alteration
Q00921711-I1
12/29/2023
Permit issued — Earth Work
Q00691662-I1-GC
11/09/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/31/2023
Permit issued — Plumbing
Q00710752-I1-PL
09/12/2022
Permit issued — Foundation
Q00691662-I1-GC
09/12/2022
Permit issued — General Construction
Q00691662-I1-ST
09/12/2022
Permit issued — Earth Work
Q00691662-I1-EA
09/12/2022
Permit issued — General Construction
Q00691662-I1-FO
05/11/2022
Objection raised — Other
05/11/2022
Objection resolved — Addressed
05/05/2022
Filed — Alteration
PLUMBING WORK TYPE IN CONJUNCTION WITH NB APPLICATION # 421807664
Q00710752-I1
05/01/2022
Filed — Alteration
Q00691662-I1
03/31/2022
Special inspection requirement — Structural Steel - Details
David Katz
03/03/2022
Special inspection requirement — Final
David Katz
03/03/2022
Special inspection requirement — Footing and Foundation
David Katz
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offALL-BORO REHAB CONSTRCT C10/20/2025
DOB NOWEarth WorkSigned-offALL-BORO REHAB CONSTRCT C12/29/2023
DOB NOWPlumbingSigned-offALL-BORO REHAB CONST CORP01/31/2023
DOB NOWFoundationSigned-offALL-BORO REHAB CONSTRCT C09/12/2022
DOB NOWGeneral ConstructionSigned-offALL-BORO REHAB CONSTRCT C09/12/2022
DOB NOWEarth WorkSigned-offALL-BORO REHAB CONSTRCT C09/12/2022
DOB NOWGeneral ConstructionSigned-offALL-BORO REHAB CONSTRCT C09/12/2022
BIS—ISSUEDALL-BORO REHAB CONSTRCT C02/05/2026
BIS—ISSUEDALL-BORO REHAB CONSTRCT C06/19/2024
BIS—ISSUEDALL-BORO REHAB CONSTRCT C03/09/2023
2 projects · most recent 05/12/2026
General Wiring
FiledStatusContractorScope
05/12/2026CompleteHIRSCHEL ELECTRICAL INC.General Wiring
11/03/2024CompleteHIRSCHEL ELECTRICAL INC.General Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/30/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
09/09/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/09/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/13/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
12/01/2025Fire-Resistant Penetrations and JointsDavid Katzspecial
12/01/2025Energy Code Compliance InspectionsDavid Katzprogress
09/08/2025Fire-Resistant Penetrations and JointsDavid Katzspecial
09/08/2025Energy Code Compliance InspectionsDavid Katzprogress
03/31/2022Structural Steel - DetailsDavid Katzspecial
03/03/2022FinalDavid Katzprogress
03/03/2022Footing and FoundationDavid Katzprogress
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00691662-I1Request digital key ↗
08/21/2026Q00921711-I1Request digital key ↗
08/18/2026Q00710752-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION8
02/27/2026421807664Open ↗
01/15/2026421807664Open ↗
01/14/2026421807664Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION5
07/27/2023421807664Open ↗
06/27/2023421807664Open ↗
06/15/2023421807664Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/15/2025421807664Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
03/03/2025440737231Open ↗
▸BISBPP-15 - Application for waiver of Builders pavement requirements1
03/03/2025440737231Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING DIAGRAM3
02/16/2023421807664Open ↗
07/28/2022421807664Open ↗
07/27/2022421807664Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026Q00921711-I1Open ↗
08/18/2026Q00710752-I1Open ↗
08/13/2026Q00691662-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026Q00691662-I1Open ↗
08/26/2026Q00710752-P1Open ↗
08/23/2026Q00710752-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026Q00691662-I1Open ↗
08/26/2026Q00710752-P1Open ↗
08/23/2026Q00710752-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/16/2022440737231Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/16/2022440737231Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/27/2023421807664Open ↗
▸Trade Schedules & Equipment2
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
07/22/2022421807664Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
07/22/2022421807664Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
06/06/2024421807664Open ↗
07/22/2022421807664Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
02/16/2023421807664Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
02/23/2023421807664Open ↗
02/16/2023421807664Open ↗
07/27/2022421807664Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/27/2023421807664Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY6
02/23/2023421807664Open ↗
02/16/2023421807664Open ↗
07/27/2022421807664Open ↗
Showing 3 of 6 on file for this type
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
02/16/2023421807664Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
02/16/2023421807664Open ↗
▸BISBPP - Inspection Appointment Form1
03/03/2025440737231Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
01/25/2022421807664Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
02/16/2023421807664Open ↗
▸BISSOIL REPORT1
01/25/2022421807664Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
02/16/2023421807664Open ↗
▸Approvals, Objections & Sign-offs5
▸BISSCHEDULE A - OCCUPANCY / USE3
03/01/2024421807664Open ↗
11/22/2022421807664Open ↗
10/25/2022421807664Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
03/03/2025440737231Open ↗
▸BISPARKS DEPARTMENT APPROVAL REQUIRED____FOR RELOCATION OF TREE1
02/19/2025440737231Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
03/03/2025440737231Open ↗
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION8
02/03/2026421807664Open ↗
06/20/2024421807664Open ↗
06/14/2024421807664Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET1
02/22/2022421807664Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/16/2022440737231Open ↗
▸Other Documents10
▸BISBPP - SUPPORTING DOCUMENTATION6
03/03/2025440737231Open ↗
03/03/2025440737231Open ↗
03/03/2025440737231Open ↗
Showing 3 of 6 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM1
07/22/2022421807664Open ↗
▸BISPLOT DIAGRAM1
01/25/2022421807664Open ↗
▸BISBPP: FILING REQUIRED1
06/14/2024421807664Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00691662-I1Open ↗