BROOKLYN
12 2 AVENUE
BROOKLYN · BIN 3851040
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK DEPARTMENT OF SANITATIO103/21/2026
CITY OF NY DEPT OF SANITATION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAZEN AND SAWYER, D.P.C.103/26/2026
AGE ENGINEERING, LLC201/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RUSSO DEVELOPMENT ENTERPR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RUSSO DEVELOPMENT ENTERPGeneral Contractor404/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AGE ENGINEERING, LLC6695101/25/2024
Building Lifecycle
All (41)Filed (3)Permit Issued (2)Signed Off (2)Objection (4)Special Inspection (30)
04/10/2026
Objection raised — Energy
04/10/2026
Objection raised — Zoning
04/10/2026
Objection raised — Structural
04/10/2026
Objection raised — Scope
03/26/2026
Filed — New Building
SPRINKLER/STANDPIPE WORK RELATED TO NYC DEP CSO FACILITIES FOR GOWANUS CANAL, CONSTRUCTION PACKAGE 3 - OH-007.
B01368677-I1
03/09/2026
Special inspection requirement — Vestibules
03/09/2026
Special inspection requirement — Insulation placement and R values
03/09/2026
Special inspection requirement — Fenestration air leakage
03/09/2026
Special inspection requirement — Fenestration areas
03/09/2026
Special inspection requirement — Maintenance information
03/09/2026
Special inspection requirement — Metering
03/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/09/2026
Special inspection requirement — Shutoff dampers
03/09/2026
Special inspection requirement — Chimneys and vents
03/09/2026
Special inspection requirement — Structural Steel - Details
03/09/2026
Special inspection requirement — Concrete - Cast-In-Place
03/09/2026
Special inspection requirement — Concrete - Precast
03/09/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/09/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
03/09/2026
Special inspection requirement — Masonry
03/09/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
03/09/2026
Special inspection requirement — Seismic Isolation Systems
03/09/2026
Special inspection requirement — Structural Cold-Formed Steel
03/09/2026
Special inspection requirement — Structural Steel - High Strength Bolting
03/09/2026
Special inspection requirement — Structural Steel - Welding
03/09/2026
Special inspection requirement — Subgrade Inspections
03/09/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
03/09/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
03/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/09/2026
Special inspection requirement — Interior lighting power
03/09/2026
Special inspection requirement — Air barrier - visual inspection
03/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/09/2026
Special inspection requirement — Lighting controls
03/09/2026
Special inspection requirement — Exterior lighting power
10/21/2025
Signed off — Alteration
REMOVAL OF TEMPORARY STRUCTURE
B00992816-S1
06/24/2024
Signed off — Alteration
REMOVAL OF TEMPORARY STRUCTURE
B00992816-I1
01/30/2024
Permit issued — Foundation
B00992816-I1-GC-CX
01/29/2024
Permit issued — Protection and Mechanical Methods
B00992816-S1-PMM
01/25/2024
Filed — Alteration
REMOVAL OF TEMPORARY STRUCTURE
B00992816-S1
01/25/2024
Filed — Alteration
REMOVAL OF TEMPORARY STRUCTURE
B00992816-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offRUSSO DEVELOPMENT ENTERP01/30/2024
DOB NOWProtection and Mechanical MethodsSigned-offRUSSO DEVELOPMENT ENTERP01/29/2024
BISOTISSUEDSOLAR ENERGY SYSTEMS INC07/11/2017
1 project · most recent 03/26/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/26/2026——Air Conditioning Systems, Ventilation Systems
Cooling
Trane Horizon ASHP 437,900 BTU · Heat Pump Outdoor ×3
HORIZON ASHP 437,900 BTU · Heat Pump Outdoor ×1
Horizon AHSHP 437,900 BTU · Heat Pump Outdoor ×1
TSJ180A4S00 178,600 BTU · Rooftop Unit ×1
Mitsubishi Electric NTXSST12B112AA 12,000 BTU · Condensing Unit ×1
NTXSST36B112AA 33,200 BTU · Condensing Unit ×1
Ventilation
Greenheck BSQ-160 2,200 CFM · Exhaust Fan ×2
CUBE-300 7,500 CFM · Exhaust Fan ×1
USF-22 3,600 CFM · Exhaust Fan ×1
Hartzell A41-1-403FA-33FGFXV3 15,400 CFM · Exhaust Fan ×4
1 project · most recent 03/26/2026
Steel Concrete
FiledStatusContractorScope
03/26/2026——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
03/09/2026Vestibules—energy_progress
03/09/2026Insulation placement and R values—energy_progress
03/09/2026Fenestration air leakage—energy_progress
03/09/2026Fenestration areas—energy_progress
03/09/2026Maintenance information—energy_progress
03/09/2026Metering—energy_progress
03/09/2026HVAC-R and service water heating equipment—energy_progress
03/09/2026Shutoff dampers—energy_progress
03/09/2026Chimneys and vents—special
03/09/2026Structural Steel - Details—special
03/09/2026Concrete - Cast-In-Place—special
03/09/2026Concrete - Precast—special
03/09/2026Excavations - Sheeting, Shoring, and Bracing—special
03/09/2026Fire-Resistant Penetrations and Joints—special
03/09/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
03/09/2026Masonry—special
03/09/2026Mastic and Intumescent Fire-resistant Coatings—special
03/09/2026Seismic Isolation Systems—special
03/09/2026Structural Cold-Formed Steel—special
03/09/2026Structural Steel - High Strength Bolting—special
03/09/2026Structural Steel - Welding—special
03/09/2026Subgrade Inspections—special
03/09/2026Subsurface Conditions – Fill Placement & In-Place Density—special
03/09/2026Wall Panels, Curtain Walls, and Veneers—special
03/09/2026HVAC-R and service water heating system controls—energy_progress
Latest 25 of 38.
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026B00992816-I1Request digital key ↗
08/26/2026B00992816-S1Request digital key ↗
08/15/2026B01368677-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
06/23/2017340516098Open ↗
05/12/2017321572516Open ↗
▸BISWORK PERMIT APPLICATION1
07/18/2017321572516Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026B01368677-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026B01368677-I1Open ↗
08/13/2026B00992816-S1Open ↗
08/13/2026B00992816-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/20/2017321572516Open ↗
05/12/2017321572516Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026B00992816-I1Open ↗
08/27/2026B00992816-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/23/2017340516098Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026B00992816-I1Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
05/24/2017321572516Open ↗
05/12/2017321572516Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00992816-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/20/2017321572516Open ↗
07/18/2017321572516Open ↗
05/12/2017321572516Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/20/2017321572516Open ↗
▸Approvals, Objections & Sign-offs7
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/15/2026B01368677-I1Open ↗
08/13/2026B00992816-S1Open ↗
08/13/2026B00992816-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/13/2026B00992816-S1Open ↗
08/13/2026B00992816-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/20/2017321572516Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B00992816-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/20/2017321572516Open ↗
05/12/2017321572516Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION2
07/14/2017321572516Open ↗
05/12/2017321572516Open ↗
▸BISBOROUGH INTAKE FORM1
09/20/2017321572516Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/23/2017340516098Open ↗
▸BISEFILING COVER SHEET1
05/12/2017321572516Open ↗
▸Other Documents2
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00992816-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026B01368677-I1Open ↗