← Back
Three families
12-20 118 STREET
QUEENS · BIN 4097740
💬 Discuss this project
1985Year Built
3Stories
C0Building Class
R2AZoning
2,950 sfGross Floor Area
3Units
22 Open Violations 16 unresolved · 6 paperwork only ▸
Three families · Owner of record: CS LINK LLC · 2,755 sf lot · 1.07 FAR built · Flood zone X
Locations of Work
ElectricalMechanicalFire Protection
Cellar3p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CS LINK LLC1103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/23/2024$1.4M—— → —$492/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MADRIAGA ENGINEERING P.C.203/28/2026
Building Lifecycle
All (51)Filed (2)Violation (22)Objection (22)Special Inspection (5)
08/24/2026
Objection raised — Scope
08/24/2026
Objection raised — Accessibility
08/24/2026
Objection raised — Scope
08/24/2026
Objection raised — Energy
08/24/2026
Objection raised — Mechanical
08/24/2026
Objection raised — Other
08/24/2026
Objection raised — Zoning
08/24/2026
Objection raised — Zoning
08/24/2026
Objection raised — Inspections
08/24/2026
Objection raised — Other
08/24/2026
Objection raised — Inspections
08/24/2026
Objection raised — Admin
08/24/2026
Objection raised — Fire_Protection
08/24/2026
Objection raised — Structural
07/26/2026
Objection resolved — Addressed
07/26/2026
Objection resolved — Addressed
07/23/2026
Objection resolved — Addressed
07/23/2026
Objection resolved — Addressed
07/16/2026
Violation issued (ECB, open)
Construction
07/16/2026
Violation issued (ECB, open)
Construction
07/16/2026
Violation issued (ECB, open)
Construction
07/16/2026
Violation issued (ECB, open)
Construction
07/16/2026
Violation issued (ECB, open)
Construction
07/15/2026
Violation issued (ECB, open)
Construction
07/15/2026
Violation issued (ECB, open)
Construction
07/15/2026
Violation issued (ECB, open)
Construction
07/15/2026
Violation issued (ECB, open)
Construction
07/15/2026
Violation issued (ECB, open)
Construction
07/15/2026
Violation issued (ECB, open)
Construction
04/23/2026
Objection raised — Other
04/23/2026
Objection raised — Scope
04/23/2026
Objection raised — Scope
04/23/2026
Objection raised — Other
03/28/2026
Filed — Alteration CO
PROPOSE CELLAR DWELLING UNIT (ADU) AT THE EXISTING 2-FAMILY DWELLING UNITS ON THE SAME ZONING LOT. NEW CERTIFICATE OF OCCUPANCY TO BE OBTAINED. AND,TO REMOVE VIOLATIONS.(35720212P; 35720213R;35720214Z;35720271P;35720272R;35720273Z)
Q01367690-I1
03/28/2026
Filed — Alteration CO
PROPOSE CELLAR DWELLING UNIT (ADU) AT THE EXISTING 2-FAMILY DWELLING UNITS ON THE SAME ZONING LOT. NEW CERTIFICATE OF OCCUPANCY TO BE OBTAINED. AND,TO REMOVE VIOLATIONS.(35720212P; 35720213R;35720214Z;35720271P;35720272R;35720273Z)
Q01367690-S1
03/24/2026
Special inspection requirement — Sprinkler Systems
03/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/24/2026
Special inspection requirement — Energy Code Compliance Inspections
03/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/23/2026
Violation issued (ECB, open)
Construction
11/28/2025
Violation issued (ECB, open)
Construction
11/28/2025
Violation issued (ECB, open)
Construction
11/28/2025
Violation issued (ECB, open)
Construction
11/28/2025
Violation issued (ECB, open)
Construction
11/28/2025
Violation issued (ECB, open)
Construction
11/28/2025
Violation issued (ECB, open)
Construction
11/28/2025
Violation issued (ECB, open)
Unknown
11/28/2025
Violation issued (ECB, open)
Construction
11/28/2025
Violation issued (ECB, open)
Unknown
11/28/2025
Violation issued (ECB, open)
Construction
Nothing on file for this building.
1 project · most recent 03/28/2026
Ventilation Systems
FiledStatusContractorScope
03/28/2026——Ventilation Systems
1 project · most recent 03/28/2026
Sprinkler System
FiledStatusContractorScope
03/28/2026——Sprinkler System
1 project · most recent 03/28/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
03/28/2026——Gas, Plumbing-Sprinkler, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/24/2026Sprinkler Systems—special
03/24/2026Fire-Resistant Penetrations and Joints—special
03/24/2026Energy Code Compliance Inspections—progress
03/24/2026HVAC-R and service water heating system controls—energy_progress
03/24/2026HVAC-R and service water heating equipment—energy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/15/2026Q01367690-S1Request digital key ↗
08/14/2026Q01367690-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026Q01367690-I1Open ↗
08/17/2026Q01367690-S1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/14/2026Q01367690-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026Q01367690-S1Open ↗
08/14/2026Q01367690-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/14/2026Q01367690-I1Open ↗