← Back
Three families
12-24 31 DRIVE
QUEENS · BIN 4005780
💬 Discuss this project
1925Year Built
2Stories
C0Building Class
R5BZoning
2,056 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · Owner of record: 1224 31ST DR ASTORIA LLC · 4,700 sf lot · 0.44 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
Floor 2Under Construction5p · 1 filing · 20 docs
Floor 1Under Construction6p · 1 filing · 20 docs
CellarUnder Construction5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WINNING EXPEDITING SERVICE1507/08/2026
1224 31ST DR ASTORIA LLC303/22/2026
TRISTATE CONTRACTING803/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/09/2024$1.6M—Private party → 1224 31ST DR ASTORIA LLC$803/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WINNING EXPEDITING SERVICE INC.401/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WINNING EXPEDITING SERVICE803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRISTATE CONTRACTINGGeneral Contractor604/09/2026
RKA PIPING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MASTROGIACOMO ENGINEERING4237301/28/2025
Building Lifecycle
All (73)Filed (4)Permit Issued (5)Violation (26)Inspection (8)Special Inspection (30)
07/15/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/25/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/25/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/06/2026
Violation issued (HPD, closed)
A
01/22/2026
Permit issued — Structural
Q01158045-I1-GC-CX
12/16/2025
Permit issued — Construction Fence
Q01139220-I1-FN
08/22/2025
Violation issued (ECB, closed)
Unknown
08/15/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/11/2025
Violation issued (HPD, closed)
A
06/10/2025
Violation issued (ECB, closed)
Unknown
06/10/2025
Violation issued (ECB, closed)
Unknown
06/10/2025
Violation issued (ECB, closed)
Unknown
06/10/2025
Violation issued (ECB, closed)
Construction
06/10/2025
Violation issued (ECB, closed)
Construction
06/10/2025
Violation issued (ECB, closed)
Construction
06/10/2025
Violation issued (ECB, closed)
Construction
04/02/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — Concrete - Cast-In-Place
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — Mechanical Systems
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — Structural Steel - High Strength Bolting
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — Heating Systems
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — Structural Steel - Details
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — Lowest Floor Elevation
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — Final
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — Metering
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — Maintenance information
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — Fenestration air leakage
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — Air barrier - visual inspection
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — Interior lighting power
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — Shutoff dampers
MICHAEL MASTROGIACOMO
01/29/2025
Special inspection requirement — Fenestration areas
MICHAEL MASTROGIACOMO
01/28/2025
Filed — Alteration
Renovation work to an existing 2-Family house, including interior partial removal as indicated on the plans is filed herewith. No change in use, egress, and occupancy. Plumbing work will be filed separately
Q01158045-P1
01/28/2025
Permit issued — Plumbing
Q01158045-S1-PL
01/27/2025
Violation issued (ECB, closed)
Unknown
01/27/2025
Violation issued (ECB, closed)
Construction
01/27/2025
Violation issued (ECB, closed)
Unknown
01/27/2025
Special inspection requirement — Concrete - Cast-In-Place
MICHAEL MASTROGIACOMO
01/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL MASTROGIACOMO
01/27/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
MICHAEL MASTROGIACOMO
01/27/2025
Special inspection requirement — Heating Systems
MICHAEL MASTROGIACOMO
01/27/2025
Special inspection requirement — Mechanical Systems
MICHAEL MASTROGIACOMO
01/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MICHAEL MASTROGIACOMO
01/27/2025
Special inspection requirement — Structural Steel - Details
MICHAEL MASTROGIACOMO
01/10/2025
Permit issued — General Construction
Q01158045-I1-GC-CX
12/23/2024
Filed — Alteration
Renovation work to an existing 2-Family house, including interior partial removal as indicated on the plans is filed herewith. No change in use, egress, and occupancy. Plumbing work will be filed separately
Q01158045-S1
12/20/2024
Filed — Alteration
Renovation work to an existing 2-Family house, including interior partial removal as indicated on the plans is filed herewith. No change in use, egress, and occupancy. Plumbing work will be filed separately
Q01158045-I1
11/18/2024
Permit issued — Construction Fence
Q01139220-I1-FN
11/09/2024
Filed — Alteration
Q01139220-I1
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedTRISTATE CONTRACTING01/22/2026
DOB NOWConstruction FencePermit IssuedTRISTATE CONTRACTING12/16/2025
DOB NOWPlumbingSigned-offRKA PIPING AND HEATING01/28/2025
DOB NOWGeneral ConstructionPermit IssuedTRISTATE CONTRACTING01/10/2025
DOB NOWConstruction FencePermit IssuedTRISTATE CONTRACTING11/18/2024
1 project · most recent 01/28/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/28/2025Permit IssuedTRISTATE CONTRACTINGAir Conditioning Systems
Cooling
Gree MULTI30HP230V1EO 30,000 BTU · Heat Pump Outdoor ×6
MULTI24HP230V1EO 24,000 BTU · Heat Pump Outdoor ×2
1 project · most recent 01/28/2025
Gas Water/Sanitary
FiledStatusContractorScope
01/28/2025Signed-offRKA PIPING AND HEATINGGas, Water/Sanitary
3 projects · most recent 02/26/2025
General Wiring
FiledStatusContractorScope
02/26/2025Permit IssuedGONCO ELECTRICAL CORPGeneral Wiring
02/01/2025Permit IssuedGONCO ELECTRICAL CORP—
01/28/2025Permit IssuedGONCO ELECTRICAL CORP—
1 project · most recent 01/28/2025
Steel Concrete
FiledStatusContractorScope
01/28/2025Permit IssuedTRISTATE CONTRACTINGSteel, Concrete
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/15/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/25/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/25/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/02/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/02/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
01/29/2025HVAC-R and service water heating system controlsMICHAEL MASTROGIACOMOenergy_progress
01/29/2025Concrete - Cast-In-PlaceMICHAEL MASTROGIACOMOspecial
01/29/2025Mechanical SystemsMICHAEL MASTROGIACOMOspecial
01/29/2025Structural Steel - High Strength BoltingMICHAEL MASTROGIACOMOspecial
01/29/2025Fire-Resistant Penetrations and JointsMICHAEL MASTROGIACOMOspecial
01/29/2025Heating SystemsMICHAEL MASTROGIACOMOspecial
01/29/2025Structural Stability – Alterations of existing buildingsMICHAEL MASTROGIACOMOspecial
01/29/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MICHAEL MASTROGIACOMOspecial
01/29/2025Structural Steel - DetailsMICHAEL MASTROGIACOMOspecial
01/29/2025Fire-Resistance Rated ConstructionMICHAEL MASTROGIACOMOprogress
01/29/2025Lowest Floor ElevationMICHAEL MASTROGIACOMOprogress
01/29/2025FinalMICHAEL MASTROGIACOMOprogress
01/29/2025Energy Code Compliance InspectionsMICHAEL MASTROGIACOMOprogress
01/29/2025MeteringMICHAEL MASTROGIACOMOenergy_progress
01/29/2025HVAC-R and service water piping design and insulationMICHAEL MASTROGIACOMOenergy_progress
01/29/2025Maintenance informationMICHAEL MASTROGIACOMOenergy_progress
01/29/2025Fenestration air leakageMICHAEL MASTROGIACOMOenergy_progress
01/29/2025Air barrier - visual inspectionMICHAEL MASTROGIACOMOenergy_progress
01/29/2025Interior lighting powerMICHAEL MASTROGIACOMOenergy_progress
01/29/2025Fenestration and door U-factor and product ratingsMICHAEL MASTROGIACOMOenergy_progress
01/29/2025HVAC-R and service water heating equipmentMICHAEL MASTROGIACOMOenergy_progress
01/29/2025Shutoff dampersMICHAEL MASTROGIACOMOenergy_progress
01/29/2025Fenestration areasMICHAEL MASTROGIACOMOenergy_progress
01/27/2025Concrete - Cast-In-PlaceMICHAEL MASTROGIACOMOspecial
01/27/2025Fire-Resistant Penetrations and JointsMICHAEL MASTROGIACOMOspecial
Latest 25 of 46.
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026Q01139220-I1Request digital key ↗
08/21/2026Q01158045-S1Request digital key ↗
08/21/2026Q01158045-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature29
08/25/2026Q01158045-P1Open ↗
08/25/2026Q01158045-P1Open ↗
08/25/2026Q01158045-P1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
08/25/2026Q01158045-P1Open ↗
08/25/2026Q01158045-P1Open ↗
08/25/2026Q01158045-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026Q01158045-I1Open ↗
08/21/2026Q01158045-S1Open ↗
08/21/2026Q01158045-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026Q01158045-I1Open ↗
08/21/2026Q01158045-S1Open ↗
08/21/2026Q01158045-P1Open ↗
▸Other Documents2
▸DOB NOWDHCR Document2
08/13/2026Q01139220-I1Open ↗
08/13/2026Q01158045-S1Open ↗