← Back
QUEENS
12-63 REDFERN AVENUE
QUEENS · Far Rockaway-Bayswater · BIN 4831188
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof12p · 1 filing · 15 docs
Floor 145p · 7 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHOK ARCHITECTURE DESIGN, PL/810/31/2024
A&D ENGINEERING, PLLC705/08/2024
CONAPAC SERVICES, DBA111/22/2022
MSS ENGINEERING PLLC102/18/2022
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/23/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
10/03/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/27/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/06/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
11/21/2024Air barrier — testing Ashish Patelenergy_progress
11/21/2024Lighting controlsAshish Patelenergy_progress
11/21/2024Sprayed fire-resistant materialsAshish Patelspecial
11/21/2024Concrete - Cast-In-PlaceAshish Patelspecial
11/21/2024Lowest Floor ElevationAshish Patelprogress
11/21/2024Energy Code Compliance InspectionsAshish Patelprogress
11/21/2024Fire-Resistance Rated ConstructionAshish Patelprogress
11/21/2024Fire-Resistant Penetrations and JointsAshish Patelspecial
11/21/2024Excavations - Sheeting, Shoring, and BracingAshish Patelspecial
11/21/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationAshish Patelspecial
11/21/2024Exterior lighting powerAshish Patelenergy_progress
11/21/2024Fenestration air leakageAshish Patelenergy_progress
11/21/2024Fenestration and door U-factor and product ratingsAshish Patelenergy_progress
11/21/2024MasonryAshish Patelspecial
11/21/2024Fenestration areasAshish Patelenergy_progress
11/21/2024Permanent certificateAshish Patelenergy_progress
11/21/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Ashish Patelspecial
11/21/2024Subgrade InspectionsAshish Patelspecial
11/21/2024Exterior Insulation and Finish Systems (EIFS)Ashish Patelspecial
11/21/2024Interior lighting powerAshish Patelenergy_progress
11/21/2024Air barrier - visual inspectionAshish Patelenergy_progress
08/07/2024Air barrier — testing Ashish Patelenergy_progress
08/07/2024Concrete - Cast-In-PlaceAshish Patelspecial
08/07/2024Excavations - Sheeting, Shoring, and BracingAshish Patelspecial
08/07/2024Exterior Insulation and Finish Systems (EIFS)Ashish Patelspecial
Latest 25 of 92.
Nothing on file for this building.