← Back
BuildNYC
Two stories - detached, small or mid-size
12 CARTERET STREET
STATEN ISLAND · BIN 5088349
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R3XZoning
1,728 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,686 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar panel installation2p · 1 filing · 3 docs
Floor 21 filing · 20 docs
Floor 1Temporary construction fence1p · 2 filings · 20 docs
Cellar1p · 1 filing · 20 docs
Site & exteriorProposed 8-0 high fence1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering103/18/2024
Think Design Architecture402/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sunrun103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.R. ContractingGeneral Contractor303/21/2026
Sunrun Solar ElectlElectrical103/22/2026
D.R. ContractingScaffold107/08/2026
Sunrun Installation Servicespecialty_contractor107/08/2026
Bluewater Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272103/18/2024
A Tech Engineering NYC, P6738108/12/2021
Building Lifecycle
05/10/2024
Signed off — Alteration
S01012509-I1
03/27/2024
Permit issued — Solar
S01012509-I1-SL
03/18/2024
Filed — Alteration
S01012509-I1
03/07/2023
Permit expired, never signed off — Construction Fence
The city's record still shows this permit as issued, with no sign-off on its filing
S00542288-I1-FN
03/02/2023
Permit expired, never signed off — Earth Work
The city's record still shows this permit as issued, with no sign-off on its filing
S00543429-I1-GC-CX
39 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service03/27/2024
DOB NOWPlumbingSigned-offBluewater Plumbing & Heating05/10/2022
DOB NOWConstruction FencePermit IssuedD.R. Contracting03/07/2022
DOB NOWEarth WorkPermit IssuedD.R. Contracting03/02/2022
2 projects · most recent 03/18/2024
General Wiring
FiledStatusContractorScope
03/18/2024CompleteSunrun Solar Electl—
05/26/2022CompleteLaser Lite Elect'lGeneral Wiring
1 project · most recent 08/13/2021
Wood
FiledStatusContractorScope
08/13/2021Signed-offCmac MechanicalWood
1 project · most recent 08/05/2021
Fence
FiledStatusContractorScope
08/05/2021Permit IssuedD.R. ContractingFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/30/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
02/04/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
08/13/2021HVAC-R and service water heating equipmentanthony santoroenergy_progress
08/13/2021HVAC-R and service water piping design and insulationanthony santoroenergy_progress
08/13/2021HVAC-R and service water heating system controlsanthony santoroenergy_progress
08/09/2021Subsurface Investigations (Borings/Test Pits)anthony santorospecial
07/09/2021Fire-Resistance Rated Constructionanthony santoroprogress
07/09/2021Structural Wood Frameanthony santoroprogress
07/09/2021Air barrier - visual inspectionanthony santoroenergy_progress
07/09/2021Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
07/09/2021Fenestration areasanthony santoroenergy_progress
07/09/2021Fenestration air leakageanthony santoroenergy_progress
07/09/2021HVAC-R and service water piping design and insulationanthony santoroenergy_progress
07/09/2021Insulation placement and R valuesanthony santoroenergy_progress
07/09/2021Interior lighting poweranthony santoroenergy_progress
07/09/2021Structural Stability – Alterations of existing buildingsanthony santorospecial
07/09/2021Concrete - Cast-In-Placeanthony santorospecial
07/09/2021Fire-Resistant Penetrations and Jointsanthony santorospecial
07/09/2021Subgrade Inspectionsanthony santorospecial
07/09/2021Energy Code Compliance Inspectionsanthony santoroprogress
06/18/2021Footing and Foundationanthony santoroprogress
06/18/2021Finalanthony santoroprogress
30 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account