← Back
BuildNYC
Walk-up apt, over six families with stores
12 EAST 125TH STREET
MANHATTAN · BIN 1085293
💬 Discuss this project
1900Year Built
5Stories
C7Building Class
C4-4AZoning
41,080 sfGross Floor Area
40Units
Rent Stabilized58 Active Violations 55 unresolved · 3 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: Finite Homes Housing Development Company · 10,092 sf lot · 4.07 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1375 ELTA Z Chicken n Fries24p · 3 filings · 20 docs
Cellar375 ELTA Z Chicken n Fries30p · 1 filing · 20 docs
Site & exterior375 ELTA Z Chicken n Fries44p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
West 128 Street1907/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Leon Skvirsky PE104/24/2025
Zelta Design511/12/2024
Lawrence Adjah, Architect204/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Epac Building Consulting1003/21/2026
Building Brothers203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cube Builders Group NYScaffold303/21/2026
KJK ElectricElectrical103/22/2026
Cube Builders Group NYGeneral Contractor107/08/2026
Paul SignsSign hanger107/08/2026
PipestylistsPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Zelta Inspection7764411/12/2024
Building Lifecycle
All (48)Filed (8)Permit Issued (4)Signed Off (4)Inspection (2)Special Inspection (30)
06/03/2025
Signed off — Alteration
M01198387-I1
04/25/2025
Permit issued — Sign
M01198387-I1-SG
04/24/2025
Filed — Alteration
M01198387-I1
11/26/2024
Signed off — Alteration
Proposed renovation at existing commercial space for an eating and drinking establishment including installation of Type 1 hood and exhaust at the first floor and storage at the cellar; replace existing storefront. No change in use, egress or occupancy.
M01081031-I1
11/21/2024
Special inspection requirement — Tenant Protection Plan Compliance
ERIK LIEPINS
11/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK LIEPINS
11/21/2024
Special inspection requirement — Mechanical Systems
ERIK LIEPINS
11/21/2024
Special inspection requirement — Final
ERIK LIEPINS
11/21/2024
Special inspection requirement — Energy Code Compliance Inspections
ERIK LIEPINS
11/21/2024
Special inspection requirement — Maintenance information
ERIK LIEPINS
11/21/2024
Special inspection requirement — Duct leakage testing, insulation and design
ERIK LIEPINS
11/21/2024
Special inspection requirement — Air barrier - visual inspection
ERIK LIEPINS
11/21/2024
Special inspection requirement — Exterior lighting power
ERIK LIEPINS
11/21/2024
Special inspection requirement — Interior lighting power
ERIK LIEPINS
11/21/2024
Special inspection requirement — Lighting controls
ERIK LIEPINS
11/12/2024
Filed — Alteration
Proposed renovation at existing commercial space for an eating and drinking establishment including installation of Type 1 hood and exhaust at the first floor and storage at the cellar; replace existing storefront. No change in use, egress or occupancy.
M01081031-P2
10/31/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK LIEPINS
10/31/2024
Special inspection requirement — Mechanical Systems
ERIK LIEPINS
10/31/2024
Special inspection requirement — Energy Code Compliance Inspections
ERIK LIEPINS
10/31/2024
Special inspection requirement — Final
ERIK LIEPINS
10/31/2024
Special inspection requirement — Exterior lighting power
ERIK LIEPINS
10/31/2024
Special inspection requirement — Maintenance information
ERIK LIEPINS
10/31/2024
Special inspection requirement — Air barrier - visual inspection
ERIK LIEPINS
10/31/2024
Special inspection requirement — Interior lighting power
ERIK LIEPINS
10/31/2024
Special inspection requirement — Duct leakage testing, insulation and design
ERIK LIEPINS
10/31/2024
Special inspection requirement — Lighting controls
ERIK LIEPINS
10/15/2024
Signed off — Alteration
Proposed renovation at existing commercial space for an eating and drinking establishment including installation of Type 1 hood and exhaust at the first floor and storage at the cellar; replace existing storefront. No change in use, egress or occupancy.
M01081031-S1
10/14/2024
Signed off — Alteration
Proposed renovation at existing commercial space for an eating and drinking establishment including installation of Type 1 hood and exhaust at the first floor and storage at the cellar; replace existing storefront. No change in use, egress or occupancy.
M01081031-S2
10/01/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/12/2024
Filed — Alteration
Proposed renovation at existing commercial space for an eating and drinking establishment including installation of Type 1 hood and exhaust at the first floor and storage at the cellar; replace existing storefront. No change in use, egress or occupancy.
M01081031-P1
09/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK LIEPINS
09/11/2024
Special inspection requirement — Exterior lighting power
ERIK LIEPINS
09/11/2024
Special inspection requirement — Lighting controls
ERIK LIEPINS
09/11/2024
Special inspection requirement — Air barrier - visual inspection
ERIK LIEPINS
09/11/2024
Special inspection requirement — Duct leakage testing, insulation and design
ERIK LIEPINS
09/11/2024
Special inspection requirement — Maintenance information
ERIK LIEPINS
09/11/2024
Special inspection requirement — Interior lighting power
ERIK LIEPINS
09/11/2024
Special inspection requirement — Mechanical Systems
ERIK LIEPINS
08/19/2024
Permit issued — Plumbing
M01081031-S1-PL
08/19/2024
Permit issued — Construction Fence
M01081031-S2-FN
08/16/2024
Permit issued — Mechanical Systems
M01081031-I1-GC-CX
08/05/2024
Filed — Alteration
Proposed renovation at existing commercial space for an eating and drinking establishment including installation of Type 1 hood and exhaust at the first floor and storage at the cellar; replace existing storefront. No change in use, egress or occupancy.
M01081031-I1
08/05/2024
Filed — Alteration
Proposed renovation at existing commercial space for an eating and drinking establishment including installation of Type 1 hood and exhaust at the first floor and storage at the cellar; replace existing storefront. No change in use, egress or occupancy.
M01081031-S1
08/05/2024
Filed — Alteration
Proposed renovation at existing commercial space for an eating and drinking establishment including installation of Type 1 hood and exhaust at the first floor and storage at the cellar; replace existing storefront. No change in use, egress or occupancy.
M01081031-S2
04/17/2023
Filed — Alteration
ADDITION OF SINK & FLOOR DRAIN IN THE SERVER LOCATION UP FRONT. ADDITION IN NEW TOILET OF LAVATORY & WATER CLOSET WITH FLOOR DRAIN.
M00824223-I1
04/17/2023
Filed — Alteration
M00824257-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offPaul Signs04/25/2025
DOB NOWPlumbingSigned-offT & T Plumbing08/19/2024
DOB NOWConstruction FenceSigned-offCube Builders Group NY08/19/2024
DOB NOWMechanical SystemsSigned-offCube Builders Group NY08/16/2024
1 project · most recent 04/17/2023
Water/Sanitary
FiledStatusContractorScope
04/17/2023——Water/Sanitary
3 projects · most recent 04/29/2025
General Wiring
FiledStatusContractorScope
04/29/2025Permit IssuedLimitless Electric Resources—
08/20/2024CompleteKJK ElectricGeneral Wiring
07/31/2024Permit IssuedDonald McGeachy—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
11/21/2024Tenant Protection Plan ComplianceERIK LIEPINSspecial
11/21/2024Fire-Resistant Penetrations and JointsERIK LIEPINSspecial
11/21/2024Mechanical SystemsERIK LIEPINSspecial
11/21/2024FinalERIK LIEPINSprogress
11/21/2024Energy Code Compliance InspectionsERIK LIEPINSprogress
11/21/2024Maintenance informationERIK LIEPINSenergy_progress
11/21/2024Duct leakage testing, insulation and designERIK LIEPINSenergy_progress
11/21/2024Air barrier - visual inspectionERIK LIEPINSenergy_progress
11/21/2024Exterior lighting powerERIK LIEPINSenergy_progress
11/21/2024Interior lighting powerERIK LIEPINSenergy_progress
11/21/2024Lighting controlsERIK LIEPINSenergy_progress
10/31/2024Tenant Protection Plan Compliance—special
10/31/2024Fire-Resistant Penetrations and JointsERIK LIEPINSspecial
10/31/2024Mechanical SystemsERIK LIEPINSspecial
10/31/2024Energy Code Compliance InspectionsERIK LIEPINSprogress
10/31/2024FinalERIK LIEPINSprogress
10/31/2024Exterior lighting powerERIK LIEPINSenergy_progress
10/31/2024Maintenance informationERIK LIEPINSenergy_progress
10/31/2024Air barrier - visual inspectionERIK LIEPINSenergy_progress
10/31/2024Interior lighting powerERIK LIEPINSenergy_progress
10/31/2024Duct leakage testing, insulation and designERIK LIEPINSenergy_progress
10/31/2024Lighting controlsERIK LIEPINSenergy_progress
09/11/2024Fire-Resistant Penetrations and JointsERIK LIEPINSspecial
09/11/2024Exterior lighting powerERIK LIEPINSenergy_progress
09/11/2024Lighting controlsERIK LIEPINSenergy_progress
Latest 25 of 34.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
375 ELTA Z Chicken n FriesRestaurant / Food ServiceCellar, Floor 1
Project M01081031 Alteration · LOC Issued · 08/05/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/31/2026M00824223-I1Request digital key ↗
08/31/2026M00824257-I1Request digital key ↗
08/26/2026M01081031-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/31/2026M00824257-I1Open ↗
08/26/2026M01081031-P1Open ↗
08/26/2026M01081031-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026M01081031-P1Open ↗
09/01/2026M01081031-P1Open ↗
08/28/2026M01081031-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M01081031-P1Open ↗
08/28/2026M01081031-I1Open ↗
08/28/2026M01081031-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026M01081031-I1Open ↗
08/26/2026M01081031-P1Open ↗
08/24/2026M01198387-I1Open ↗
Showing 3 of 5 on file for this type