← Back
Office with commercial, 7-19 stories
10 EAST 41 STREET
MANHATTAN · Midtown-Times Square · BIN 1035326
💬 Discuss this project
1926Year Built
17Stories
O6Building Class
C5-2.5Zoning
83,267 sfGross Floor Area
29Units
LL97 Covered8 Open Violations ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: BERKELEY 12 EAST 41ST STREET LLC · 6,325 sf lot · 13.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof7p · 3 filings · 20 docs
Floor 122p · 1 filing · 4 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 44p · 1 filing · 13 docs
Floor 34p · 1 filing · 13 docs
Floor 211p · 3 filings · 20 docs
Floor 111p · 5 filings · 20 docs
Mezzanine2p · 1 filing · 8 docs
Cellar8p · 2 filings · 18 docs
Site & exterior6p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BERKELEY COLLEGE8807/08/2026
BERKELEY REALTY3403/21/2026
YOSHIDA DEVELOPMENT1403/21/2026
ARTF. N.Y. INC.1103/21/2026
CUSHMAN403/21/2026
ARTF-NY INC C O LEND LEASE203/21/2026
BERKELEY 12 EAST 41ST STREET LLC103/22/2026
C-TEC ELECTRIC CORP.103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.303/21/2026
CB403/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
VINCENT J. LIOTTA P.E.103/21/2026
VINCENT J. LIOTTA P. E.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CEPRINE CONSTRUCTION INCGeneral Contractor707/08/2026
FRANCO REMODELING CORPGeneral Contractor403/21/2026
GOOD-WILL MECHANICAL CORP.General Contractor307/08/2026
MESSEMER, MICHAELFire Protection203/21/2026
AAA TOTAL PLUMBING, INCPlumbing207/08/2026
HARVEY ISAACMANElectrical103/21/2026
NICHOLAS ROSELLAElectrical103/21/2026
BAY ELECTRIC INC.Electrical103/22/2026
INTEGRATED HVAC SYS & SVCGeneral Contractor107/08/2026
MW MECHANICAL INCGeneral Contractor107/08/2026
AAA TOTAL PLUMBING INCFire Protection107/08/2026
CAL CLASSIElectrical103/21/2026
GRAND ELECTRIC , INC.Electrical103/22/2026
GREGORY PAPANTONIOUElectrical103/21/2026
GREGORY PUZZOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MALCOLM GOODSPEED, ARCHIT3384605/05/2023
ETNA CONSULTING STRUCTURA8263204/18/2023
VINCENT J. LIOTTA P. E.1974108/19/2021
TAN ENGINEERING, P.C.1291302/19/2021
Building Lifecycle
All (138)Filed (13)Permit Issued (12)Signed Off (8)Facade (FISP) (19)Violation (60)Special Inspection (26)
08/04/2023
Signed off — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00652249-I1
07/12/2023
Permit issued — Plumbing
M00870763-I1-PL
06/27/2023
Cycle 9 facade report signed — SAFE
06/06/2023
Cycle 9 facade report submitted
06/02/2023
Cycle 9 facade inspection completed
05/25/2023
Signed off — Alteration
M00669329-I1
05/05/2023
Filed — Alteration
Remove two toilets and two lavatories per plan. Extisting bathroom to be used for storage.
M00870763-I1
05/05/2023
Special inspection requirement — Energy Code Compliance Inspections
Malcolm Goodspeed
05/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malcolm Goodspeed
04/18/2023
Filed — Alteration
M00669329-P1
04/10/2023
Special inspection requirement — Masonry
Adam Cohen
04/10/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Adam Cohen
04/10/2023
Special inspection requirement — Structural Steel - Welding
Adam Cohen
04/10/2023
Special inspection requirement — Final
Adam Cohen
12/15/2022
Permit issued — Sidewalk Shed
M00652249-I1-SH
12/13/2022
Permit issued — Sidewalk Shed
M00652249-I1-SH
11/30/2022
Cycle 9 facade report submitted
11/29/2022
Cycle 9 facade report signed — UNSAFE
11/18/2022
Cycle 9 facade inspection completed
06/09/2022
Permit issued — General Construction
M00669329-I1-GC
06/08/2022
Permit issued — Structural
M00669329-I1-ST
04/21/2022
Filed — Alteration
M00669329-I1
02/14/2022
Cycle 9 facade report submitted
02/14/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/08/2022
Cycle 9 facade report signed — UNSAFE
02/04/2022
Cycle 9 facade inspection completed
12/29/2021
Permit issued — Sidewalk Shed
M00652249-I1-SH
12/28/2021
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00652249-I1
10/07/2021
Signed off — Alteration
REPLACEMENT OF PACKAGED UNIT ON THE 12TH FLOOR MER WITH 3 UNITS ON THE 12TH FLOOR MER AND ROOFTOP WITH A TOTAL CAPACITY OF 16 TONS. NO CHANGE TO EGRESS, USE,OR OCCUPANCY.
M00570730-I1
08/20/2021
Permit issued — Mechanical Systems
M00570730-I1-MS
08/19/2021
Filed — Alteration
REPLACEMENT OF PACKAGED UNIT ON THE 12TH FLOOR MER WITH 3 UNITS ON THE 12TH FLOOR MER AND ROOFTOP WITH A TOTAL CAPACITY OF 16 TONS. NO CHANGE TO EGRESS, USE,OR OCCUPANCY.
M00570730-I1
07/22/2021
Signed off — Alteration
Installation mechanical ductwork and a/c units
M00341102-I1
02/22/2021
Special inspection requirement — HVAC and service water heating system controls
Roger Tan
02/22/2021
Special inspection requirement — HVAC insulation and sealing
Roger Tan
02/22/2021
Special inspection requirement — Final
Roger Tan
02/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
02/22/2021
Special inspection requirement — Mechanical Systems
Roger Tan
02/22/2021
Special inspection requirement — HVAC and service water heating equipment
Roger Tan
02/19/2021
Filed — Alteration
Installation mechanical ductwork and a/c units
M00341102-P2
10/26/2020
Signed off — Alteration
Modifications to existing sprinkler system per plans.
M00366375-I1
09/18/2020
Signed off — Alteration
Remove one restroom. Install two sinks, one lavatory and two floor drains.
M00283699-I1
08/10/2020
Filed — Alteration
Modifications to existing sprinkler system per plans.
M00366375-P1
08/09/2020
Special inspection requirement — Post-installed Anchors
Malcolm Goodspeed
08/09/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malcolm Goodspeed
08/09/2020
Special inspection requirement — Sprinkler Systems
Malcolm Goodspeed
07/28/2020
Signed off — Alteration
Installation of mechanical ductwork and a/c units
M00316143-I1
07/21/2020
Filed — Alteration
Remove one restroom. Install two sinks, one lavatory and two floor drains.
M00283699-P1
07/21/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malcolm Goodspeed
07/21/2020
Special inspection requirement — HVAC insulation and sealing
Malcolm Goodspeed
07/18/2020
Permit issued — Mechanical Systems
M00341102-I1-MS
07/17/2020
Special inspection requirement — HVAC insulation and sealing
Malcolm Goodspeed
07/17/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malcolm Goodspeed
07/13/2020
Permit issued — Sprinklers
M00366375-I1-EW-SP
07/08/2020
Filed — Alteration
Modifications to existing sprinkler system per plans.
M00366375-I1
05/21/2020
Filed — Alteration
Installation mechanical ductwork and a/c units
M00341102-I1
05/05/2020
Signed off — Alteration
M00315733-I1
04/30/2020
Permit issued — Mechanical Systems
M00316143-I1-MS
04/08/2020
Filed — Alteration
Installation of mechanical ductwork and a/c units
M00316143-I1
02/27/2020
Permit issued — Mechanical Systems
M00315733-I1-MS
02/19/2020
Filed — Alteration
M00315733-I1
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAAA TOTAL PLUMBING, INC07/12/2023
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC12/15/2022
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC12/13/2022
DOB NOWGeneral ConstructionSigned-offFRANCO REMODELING CORP06/09/2022
DOB NOWStructuralSigned-offFRANCO REMODELING CORP06/08/2022
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC12/29/2021
DOB NOWMechanical SystemsSigned-offINTEGRATED HVAC SYS SVC08/20/2021
DOB NOWMechanical SystemsSigned-offMW MECHANICAL INC07/18/2020
DOB NOWSprinklersSigned-offAAA TOTAL PLUMBING INC07/13/2020
DOB NOWMechanical SystemsSigned-offGOODWILL MECHANICAL04/30/2020
DOB NOWMechanical SystemsSigned-offGOODWILL MECHANICAL02/27/2020
DOB NOWPlumbingSigned-offAAA TOTAL PLUMBING, INC01/15/2020
BISOTISSUEDHAMA INTERIOR WORKS INC07/06/2020
BISOTISSUEDHAMA INTERIOR WORKS INC10/10/2019
BISOTISSUEDGOOD-WILL MECHANICAL CORP.08/20/2019
BISSPISSUEDSTEVE BELSITO SONS INC07/10/2019
BISSPISSUEDSTEVE BELSITO SONS INC04/02/2019
BISPLISSUEDMEGA PLBG CORP02/08/2019
BISSPISSUEDMEGA PLBG CORP02/08/2019
BISMHISSUEDJ.CALNAN & ASSOCIATES,INC01/25/2019
BISOTISSUEDJ.CALNAN & ASSOCIATES,INC01/25/2019
BISOTISSUEDPAL ENVIRONMENTAL SAFETY12/07/2018
BISOTISSUEDVANQUISH GROUP INC10/12/2018
BISSPISSUEDSTEVE BELSITO SONS INC10/05/2018
BIS—ISSUEDA-N-C CONSTRUCTION CORP06/23/2015
BISSPISSUEDSTEVE BELSITO SONS INC06/11/2015
BISPLISSUEDSTEVE BELSITO SONS, INC06/11/2015
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING03/31/2015
BISOTISSUEDACCURA RESTORATION INC11/25/2014
BISMHISSUEDA-N-C CONSTRUCTION CORP10/17/2014
BISOTISSUEDPAL ENVIRONMENTAL SAFETY09/18/2014
BISEQISSUEDACCURA REST.& WATERPROOF09/12/2014
BISMHISSUEDA-N-C CONSTRUCTION CORP08/27/2014
BIS—ISSUEDA-N-C CONSTRUCTION CORP08/11/2014
BISOTISSUEDACCURA RESTORATION INC05/13/2014
BISEQISSUEDACCURA RESTORATION INC05/13/2014
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING03/25/2014
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING08/01/2013
BISEQISSUEDACCURA RESTORATION INC07/23/2013
BISOTISSUEDACCURA RESTORATION INC10/23/2012
+ 22 more permits on file
1 project · most recent 05/05/2023
Water/Sanitary
FiledStatusContractorScope
05/05/2023Permit IssuedAAA TOTAL PLUMBING, INCWater/Sanitary
6 projects · most recent 06/03/2025
General Wiring
FiledStatusContractorScope
06/03/2025CompleteBAY ELECTRIC INC.1 new_meters
01/28/2025CompleteDAL ELECTRICAL CORP.—
01/19/2022CompleteBOROWIDE ELECT'L CONTR'S—
05/14/2020Permit IssuedGRAND ELECTRIC , INC.General Wiring
03/07/2020Permit IssuedBALZANO ELECTRIC CORP.General Wiring
06/04/2019CompleteGRAND ELECTRIC , INC.General Wiring
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
05/05/2023Energy Code Compliance InspectionsMalcolm Goodspeedprogress
05/05/2023Fire-Resistant Penetrations and JointsMalcolm Goodspeedspecial
04/10/2023MasonryAdam Cohenspecial
04/10/2023Structural Stability – Alterations of existing buildingsAdam Cohenspecial
04/10/2023Structural Steel - WeldingAdam Cohenspecial
04/10/2023FinalAdam Cohenprogress
02/22/2021HVAC and service water heating system controls Roger Tanenergy_progress
02/22/2021HVAC insulation and sealing Roger Tanenergy_progress
02/22/2021FinalRoger Tanprogress
02/22/2021Fire-Resistant Penetrations and JointsRoger Tanspecial
02/22/2021Mechanical SystemsRoger Tanspecial
02/22/2021HVAC and service water heating equipment Roger Tanenergy_progress
08/09/2020Post-installed AnchorsMalcolm Goodspeedspecial
08/09/2020Fire-Resistant Penetrations and JointsMalcolm Goodspeedspecial
08/09/2020Sprinkler SystemsMalcolm Goodspeedspecial
07/21/2020Fire-Resistant Penetrations and JointsMalcolm Goodspeedspecial
07/21/2020HVAC insulation and sealing Malcolm Goodspeedenergy_progress
07/17/2020HVAC insulation and sealing Malcolm Goodspeedenergy_progress
07/17/2020Fire-Resistant Penetrations and JointsMalcolm Goodspeedspecial
02/14/2020Maintenance informationRoger Tanenergy_progress
02/14/2020HVAC and service water heating system controls Roger Tanenergy_progress
02/14/2020Electrical energy consumptionRoger Tanenergy_progress
02/14/2020Mechanical SystemsRoger Tanspecial
02/14/2020FinalRoger Tanprogress
02/14/2020HVAC insulation and sealing Roger Tanenergy_progress
Latest 25 of 26.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Berkeley CollegeEducationFloors 2–4
Project M00341102 Alteration · LOC Issued · 05/21/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 877 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch5
09/03/2026M00570730-I1Request digital key ↗
09/03/2026M00652249-I1Request digital key ↗
09/02/2026M00669329-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/05/2026M00315733-I1Request digital key ↗
09/05/2026M00316143-I1Request digital key ↗
09/04/2026M00341102-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/04/2026M00366375-I1Request digital key ↗
08/15/2026M00366375-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00283699-I1Request digital key ↗
08/15/2026M00283699-P1Request digital key ↗
▸Applications & Permits179
▸BISPLAN / WORK APPROVAL APPLICATION123
10/28/2021104435167Open ↗
10/22/2021104435167Open ↗
10/04/2021104435167Open ↗
Showing 3 of 123 on file for this type
▸BISWORK PERMIT APPLICATION54
07/06/2020140918657Open ↗
10/10/2019140864991Open ↗
08/20/2019140864991Open ↗
Showing 3 of 54 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/06/2022104435167Open ↗
▸BISPW1PLAN / WORK APPROVAL APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications177
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION70
10/16/2019123776716Open ↗
10/16/2019123776716Open ↗
08/07/2019123859271Open ↗
Showing 3 of 70 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST29
06/28/2019123776716Open ↗
03/28/2019123859271Open ↗
Showing 2 of 29 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT16
06/28/2020140918657Open ↗
08/19/2019140864991Open ↗
06/28/2019123776716Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/29/2026M00870763-I1Open ↗
08/26/2026M00669329-P1Open ↗
08/26/2026M00283699-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/05/2026M00315733-I1Open ↗
09/05/2026M00316143-I1Open ↗
09/04/2026M00283699-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/29/2026M00870763-I1Open ↗
08/26/2026M00669329-P1Open ↗
08/26/2026M00669329-P1Open ↗
Showing 3 of 12 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
06/28/2020140918657Open ↗
08/19/2019140864991Open ↗
Showing 2 of 3 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
06/28/2020140918657Open ↗
08/19/2019140864991Open ↗
Showing 2 of 3 on file for this type
▸Trade Schedules & Equipment88
▸BISSELF-CERT PLUMBING NOTICE23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE19
06/28/2019123776716Open ↗
06/27/2019123859271Open ↗
06/27/2019123859271Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA14
05/13/2019123528138Open ↗
05/01/2019123528138Open ↗
Showing 2 of 14 on file for this type
▸BISEQUIPMENT USE PERMITS10
06/04/2019123527745Open ↗
06/04/2019123527745Open ↗
Showing 2 of 10 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
06/04/2019123527745Open ↗
Showing 1 of 4 on file for this type
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
06/28/2020140918657Open ↗
▸Environmental & Asbestos73
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
08/19/2019140864991Open ↗
03/28/2019123859271Open ↗
Showing 2 of 16 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/05/2026M00315733-I1Open ↗
09/04/2026M00283699-I1Open ↗
09/04/2026M00283699-P1Open ↗
Showing 3 of 9 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM5
06/28/2020140918657Open ↗
Showing 1 of 5 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)5
07/10/2019123776716Open ↗
04/17/2019123528138Open ↗
Showing 2 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/05/2026M00316143-I1Open ↗
08/13/2026M00366375-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance32
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
04/15/2019123527745Open ↗
04/15/2019123527745Open ↗
Showing 2 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
05/07/2020140864991Open ↗
04/15/2019123598874Open ↗
04/15/2019123527745Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
06/28/2020140918657Open ↗
05/07/2020140864991Open ↗
08/19/2019140864991Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
06/28/2020140918657Open ↗
08/19/2019140864991Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00341102-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00570730-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
07/06/2020140918657Open ↗
06/28/2020140918657Open ↗
05/07/2020140864991Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs98
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST49
03/24/2021104435167Open ↗
10/07/2020104435167Open ↗
07/16/2020104435167Open ↗
Showing 3 of 49 on file for this type
▸BISADMINISTRATIVE OBJECTIONS28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
10/10/2019140864991Open ↗
Showing 1 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
10/28/2021104435167Open ↗
10/22/2021104435167Open ↗
01/28/2021104435167Open ↗
Showing 3 of 8 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership79
▸BISCOST AFFIDAVIT78
06/28/2020140918657Open ↗
05/07/2020140864991Open ↗
12/09/2019123776716Open ↗
Showing 3 of 78 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms127
▸BISBOROUGH INTAKE FORM58
05/01/2020104435167Open ↗
04/27/2020104435167Open ↗
02/06/2020104435167Open ↗
Showing 3 of 58 on file for this type
▸BISEFILING COVER SHEET45
06/28/2019123776716Open ↗
03/28/2019123859271Open ↗
Showing 2 of 45 on file for this type
▸BISADDITIONAL INFORMATION21
03/11/2020104435167Open ↗
06/27/2019123859271Open ↗
04/11/2019123509328Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
06/28/2020140918657Open ↗
08/19/2019140864991Open ↗
Showing 2 of 3 on file for this type
▸Other Documents4
▸BISTCO - Supporting Documents1
03/24/2021104435167Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M00669329-I1Open ↗