← Back
Three families
12 KOSSUTH PLACE
BROOKLYN · BIN 3074315
💬 Discuss this project
1915Year Built
2Stories
C0Building Class
R6Zoning
2,100 sfGross Floor Area
3Units
Rent Stabilized27 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 12 KOSSUTH PL LLC · 2,000 sf lot · 1.05 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction19p · 1 filing · 20 docs
Floor 3Under Construction13p · 1 filing · 20 docs
Floor 2Under Construction13p · 1 filing · 20 docs
Floor 1Under Construction13p · 1 filing · 20 docs
CellarUnder Construction17p · 1 filing · 20 docs
BasementUnder Construction13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BROOKLYN IQ PROPERTIES808/29/2026
COAST GROUP107/08/2026
12 KOSSUTH PL LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/27/2025$625K—Private party → 12 KOSSUTH PL LLC$298/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAS PE CONSULTING ENGINEERS407/02/2026
S&J Engineers PLLC106/01/2026
FABIAN CRUZ PE PLLC203/30/2026
MANETTA ARCHITECTURE DESIGN PLLC208/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MANETTA ARCHITECTURE DESIGN1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COAST GROUP CORPGeneral Contractor107/08/2026
JOHN EVAN CONTRACTING CORGeneral Contractor106/28/2026
SETANTA INCGeneral Contractor108/12/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519603/30/2026
Building Lifecycle
All (148)Filed (9)Permit Issued (3)Violation (28)Objection (78)Special Inspection (30)
09/22/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/11/2026
Permit issued — Construction Fence
B01271109-I1-FN
07/24/2026
Objection raised — Other
07/16/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/16/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/15/2026
Violation issued (ECB, open)
Unknown
07/15/2026
Violation issued (ECB, open)
Construction
07/15/2026
Violation issued (ECB, open)
Construction
07/02/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF MECHANICAL SYSTEM IN CONJUNCTION WITH B01236237-I1.
B01236237-S7
07/02/2026
Special inspection requirement — Subgrade Inspections
07/02/2026
Special inspection requirement — Concrete - Cast-In-Place
07/02/2026
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
07/02/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
06/22/2026
Permit issued — Structural
B01236237-S3-ST
06/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/17/2026
Special inspection requirement — Final
06/17/2026
Special inspection requirement — Footing and Foundation
06/01/2026
Filed — Alteration
INSTALLATION OF HDSB AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
B01406059-I1
06/01/2026
Permit issued — Sidewalk Shed
B01406059-I1-SH
05/05/2026
Violation issued (HPD, open)
A
04/27/2026
Objection resolved — Addressed
04/22/2026
Objection raised — Other
04/22/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
04/09/2026
Objection resolved — Addressed
04/09/2026
Objection resolved — Addressed
04/09/2026
Objection resolved — Addressed
03/30/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF MECHANICAL SYSTEM IN CONJUNCTION WITH B01236237-I1.
B01236237-S6
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/30/2026
Special inspection requirement — Shutoff dampers
Younes Abouyaala
03/30/2026
Special inspection requirement — Duct leakage testing, insulation and design
Younes Abouyaala
03/30/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
03/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
03/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
03/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
03/28/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF MECHANICAL SYSTEM IN CONJUNCTION WITH B01236237-I1.
B01236237-S5
03/23/2026
Objection resolved — Addressed
03/23/2026
Objection resolved — Addressed
03/23/2026
Objection resolved — Addressed
03/23/2026
Objection resolved — Addressed
03/23/2026
Objection resolved — Addressed
03/23/2026
Objection resolved — Addressed
03/23/2026
Objection resolved — Addressed
03/23/2026
Special inspection requirement — Masonry
Younes Abouyaala
03/17/2026
Objection raised — Admin
03/17/2026
Objection raised — Structural
03/17/2026
Objection raised — Structural
03/17/2026
Objection raised — Admin
03/17/2026
Objection raised — Structural
03/17/2026
Objection raised — Structural
03/17/2026
Objection raised — Structural
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedSETANTA INC08/11/2026
DOB NOWStructuralPermit IssuedJOHN EVAN CONTRACTING COR06/22/2026
DOB NOWSidewalk ShedSigned-offCOAST GROUP CORP06/01/2026
1 project · most recent 07/02/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/02/2026Permit IssuedJOHN EVAN CONTRACTING CORHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Cooper & Hunter CH-EL30-230VO 30,000 BTU · Split System ×4
CH-ES12-230VO 12,000 BTU · Split System ×2
Ventilation
Greenheck CUE-140HP-5-VG-1-22-G 250 CFM · Kitchen Exhaust ×2
CUE-140HP-5-VG-1-22-X 150 CFM · Exhaust Fan ×2
1 project · most recent 07/02/2026
Sprinkler System
FiledStatusContractorScope
07/02/2026——Sprinkler System
1 project · most recent 07/02/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/02/2026——Storm, Water/Sanitary
1 project · most recent 05/28/2026
FiledStatusContractorScope
05/28/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
1 project · most recent 07/02/2026
FiledStatusContractorScope
07/02/2026Permit IssuedJOHN EVAN CONTRACTING COR7 scope_items
1 project · most recent 06/01/2026
Sidewalk Shed
FiledStatusContractorScope
06/01/2026Signed-offCOAST GROUP CORPSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
07/02/2026Subgrade Inspections—special
07/02/2026Concrete - Cast-In-Place—special
07/02/2026Underpinning and alternate methods of support of buildings and adjacent property—special
07/02/2026Subsurface Investigations (Borings/Test Pits)—special
06/18/2026Structural Stability – Alterations of existing buildings—special
06/17/2026Final—progress
06/17/2026Footing and Foundation—progress
03/30/2026Shutoff dampersYounes Abouyaalaenergy_progress
03/30/2026Duct leakage testing, insulation and designYounes Abouyaalaenergy_progress
03/30/2026Maintenance informationYounes Abouyaalaenergy_progress
03/30/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
03/30/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
03/30/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
03/23/2026MasonryYounes Abouyaalaspecial
03/04/2026Subsurface Investigations (Borings/Test Pits)—special
03/04/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
03/03/2026Subsurface Investigations (Borings/Test Pits)—special
02/25/2026Mechanical SystemsYounes Abouyaalaspecial
02/25/2026FinalNAVEEN KUMARprogress
02/20/2026Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
02/20/2026Structural Cold-Formed SteelYounes Abouyaalaspecial
02/20/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
02/20/2026Subgrade InspectionsYounes Abouyaalaspecial
02/20/2026UnderpinningYounes Abouyaalaspecial
02/20/2026Subgrade InspectionsYounes Abouyaalaspecial
Latest 25 of 30.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/21/2026B01271109-I1Request digital key ↗
08/18/2026B01236237-S4Request digital key ↗
08/18/2026B01236237-S3Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/18/2026B01236237-I1Open ↗
08/13/2026B01236237-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01236237-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01236237-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/21/2026B01271109-I1Open ↗
08/18/2026B01236237-S3Open ↗
08/18/2026B01236237-S2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026B01236237-S2Open ↗
09/02/2026B01236237-S2Open ↗
08/27/2026B01236237-S3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B01236237-S2Open ↗
08/29/2026B01236237-S4Open ↗
08/27/2026B01236237-S3Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01236237-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/18/2026B01236237-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/18/2026B01236237-S3Open ↗
08/18/2026B01236237-S2Open ↗
08/18/2026B01236237-I1Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram3
08/15/2026B01236237-S7Open ↗
08/13/2026B01236237-S4Open ↗
08/13/2026B01236237-S2Open ↗
▸DOB NOWSOIL REPORT1
08/15/2026B01236237-S7Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026B01236237-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01236237-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/18/2026B01236237-I1Open ↗