← Back
BuildNYC
Two family frame
12 MAGUIRE AVENUE
STATEN ISLAND · BIN 5174671
💬 Discuss this project
2022Year Built
3Stories
B2Building Class
R3XZoning
2,987 sfGross Floor Area
2Units
Two family frame · 6,788 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
ElectricalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar panel installation3p · 1 filing · 8 docs
Floor 32p · 2 filings · 7 docs
Floor 22p · 2 filings · 7 docs
Floor 13p · 3 filings · 9 docs
Site & exteriorMozinc plated mounted hinge1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering108/28/2024
A Tech Engineering NYC111/30/2022
James V Morri406/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
James V Morri, RA403/21/2026
A Tech Engineering NYC203/21/2026
Sunrun103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.C.F. ContractingScaffold407/08/2026
Alison Plumbing & HeatingPlumbing307/08/2026
D.C.F. ContractingGeneral Contractor207/08/2026
Sunrun Installation Servicespecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272108/28/2024
Building Lifecycle
02/14/2025
Signed off — Alteration
S01103244-I1
09/04/2024
Permit issued — Solar
S01103244-I1-SL
08/28/2024
Filed — Alteration
S01103244-I1
08/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
33 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service09/04/2024
DOB NOWPlumbingSigned-offAlison Plumbing & Heating12/09/2022
DOB NOWCurb CutSigned-offD.C.F. Contracting11/03/2022
DOB NOWPlumbingSigned-offAlison Plumbing & Heating05/13/2022
DOB NOWConstruction FenceSigned-offD.C.F. Contracting04/26/2022
DOB NOWPlumbingSigned-offAlison Plumbing & Heating11/12/2021
DOB NOWConstruction FenceSigned-offD.C.F. Contracting09/22/2021
DOB NOWConstruction FenceSigned-offD.C.F. Contracting07/12/2021
BIS—ISSUEDD.C.F. Contracting09/16/2022
BIS—ISSUEDD.C.F. Contracting04/25/2022
BIS—ISSUEDD.C.F. Contracting09/20/2021
BIS—ISSUEDD.C.F. Contracting07/13/2021
2 projects · most recent 08/28/2024
General Wiring
FiledStatusContractorScope
08/28/2024CompleteSunrun Solar Electl—
04/06/2022CompleteFichera ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/10/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
12/28/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
12/19/2022Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
12/13/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/02/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/16/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/14/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/17/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/28/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/28/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/28/2024Energy Code Compliance InspectionsWalid Abdullaprogress
08/28/2024FinalWalid Abdullaprogress
08/28/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
98 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account