← Back
Two stories - detached, small or mid-size
12 MIDDAGH STREET
BROOKLYN · BIN 3001552
💬 Discuss this project
1910Year Built
2Stories
A1Building Class
R6Zoning
2,480 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,521 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof1p · 1 filing · 18 docs
Floor 111p · 1 filing · 18 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 231p · 2 filings · 20 docs
Floor 135p · 2 filings · 20 docs
Cellar34p · 3 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HOPE DANA512/04/2024
D'ANTONIO CONSULTING ENGINEERS610/18/2023
D'HUY ENGINEERING, INC.207/28/2023
GEO110/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GAMILL ENGINEERING, PC2803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEERING HOUSE CONSTRUCTGeneral Contractor1407/08/2026
STARLITE PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JSPECS,INC9429612/04/2024
MACIA INSPECTION & TESTIN402806/07/2024
Building Lifecycle
All (100)Filed (14)Permit Issued (7)Signed Off (5)Inspection (6)Objection (38)Special Inspection (30)
05/07/2025
Signed off — Alteration CO
STRUCTURAL AND FOUNDATION WORK. EXCAVATION AND CONSTRUCTION OF A NEW CELLAR BENEATH THE EXISTING TWO STORY BUILDING AND MODIFICATIONS TO THE SECOND FLOOR AND ROOF FRAMING.
B00788637-S1
12/09/2024
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH ALTERATION/CO #B00788637. NEW SPLIT SYSTEM DUCTED A/C SYSTEM, ERV AND MECHANICAL EXHAUSTS.
B08030485-I1
12/05/2024
Special inspection requirement — Energy Code Compliance Inspections
HOPE DANA
12/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
12/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
Jeffrey Stones
12/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jeffrey Stones
12/04/2024
Filed — Alteration CO
STRUCTURAL AND FOUNDATION WORK. EXCAVATION AND CONSTRUCTION OF A NEW CELLAR BENEATH THE EXISTING TWO STORY BUILDING AND MODIFICATIONS TO THE SECOND FLOOR AND ROOF FRAMING.
B00788637-P4
12/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jeffrey Stones
12/04/2024
Special inspection requirement — Fire-Resistance Rated Construction
Jeffrey Stones
12/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
12/04/2024
Special inspection requirement — Energy Code Compliance Inspections
HOPE DANA
11/07/2024
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH WORK FILED UNDER APPLICATION #B00788637.
B00810877-I1
11/07/2024
Signed off — Alteration CO
STRUCTURAL AND FOUNDATION WORK. EXCAVATION AND CONSTRUCTION OF A NEW CELLAR BENEATH THE EXISTING TWO STORY BUILDING AND MODIFICATIONS TO THE SECOND FLOOR AND ROOF FRAMING.
B00788637-S2
11/06/2024
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALTERATION-C/O #B00788637. NEW PLUMBING FIXTURES THROUGHOUT CELLAR, 1ST & 2ND FLOORS AS INDICATED ON PLANS.
B08030484-I1
06/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/07/2024
Filed — Alteration CO
STRUCTURAL AND FOUNDATION WORK. EXCAVATION AND CONSTRUCTION OF A NEW CELLAR BENEATH THE EXISTING TWO STORY BUILDING AND MODIFICATIONS TO THE SECOND FLOOR AND ROOF FRAMING.
B00788637-P3
01/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/20/2023
Permit issued — General Construction
B00788637-I1-GC
12/12/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/12/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/24/2023
Special inspection requirement — HVAC-R and service water heating equipment
HOPE DANA
10/24/2023
Special inspection requirement — Energy Code Compliance Inspections
HOPE DANA
10/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
10/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
HOPE DANA
10/24/2023
Special inspection requirement — HVAC-R and service water heating system controls
HOPE DANA
10/18/2023
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALTERATION-C/O #B00788637. NEW PLUMBING FIXTURES THROUGHOUT CELLAR, 1ST & 2ND FLOORS AS INDICATED ON PLANS.
B08030484-P3
10/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
10/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
HOPE DANA
10/16/2023
Special inspection requirement — Energy Code Compliance Inspections
HOPE DANA
10/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
HOPE DANA
10/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
HOPE DANA
09/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/15/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/21/2023
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALTERATION-C/O #B00788637. NEW PLUMBING FIXTURES THROUGHOUT CELLAR, 1ST & 2ND FLOORS AS INDICATED ON PLANS.
B08030484-P2
08/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
08/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
HOPE DANA
08/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
HOPE DANA
08/21/2023
Special inspection requirement — Energy Code Compliance Inspections
HOPE DANA
08/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
HOPE DANA
08/08/2023
Permit issued — Plumbing
B08030484-I1-PL
08/04/2023
Special inspection requirement — Concrete - Cast-In-Place
Jeffrey Stones
08/04/2023
Special inspection requirement — Masonry
Jeffrey Stones
08/04/2023
Special inspection requirement — Post-installed Anchors
Jeffrey Stones
08/04/2023
Special inspection requirement — Footing and Foundation
Jeffrey Stones
08/04/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jeffrey Stones
08/04/2023
Special inspection requirement — Structural Steel - Welding
Jeffrey Stones
08/04/2023
Special inspection requirement — Final
HOPE DANA
08/01/2023
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALTERATION-C/O #B00788637. NEW PLUMBING FIXTURES THROUGHOUT CELLAR, 1ST & 2ND FLOORS AS INDICATED ON PLANS.
B08030484-P1
07/28/2023
Filed — Alteration CO
STRUCTURAL AND FOUNDATION WORK. EXCAVATION AND CONSTRUCTION OF A NEW CELLAR BENEATH THE EXISTING TWO STORY BUILDING AND MODIFICATIONS TO THE SECOND FLOOR AND ROOF FRAMING.
B00788637-P1
07/25/2023
Filed — Alteration CO
STRUCTURAL AND FOUNDATION WORK. EXCAVATION AND CONSTRUCTION OF A NEW CELLAR BENEATH THE EXISTING TWO STORY BUILDING AND MODIFICATIONS TO THE SECOND FLOOR AND ROOF FRAMING.
B00788637-P2
02/08/2023
Permit issued — Foundation
B00788637-S1-GC-CX
01/25/2023
Permit issued — Mechanical Systems
B08030485-I1-MS
01/25/2023
Permit issued — Support of Excavation
B00788637-S2-SE
01/19/2023
Permit issued — General Construction
B00788637-I1-GC
01/19/2023
Permit issued — Construction Fence
B00810877-I1-FN
01/13/2023
Filed — Alteration
TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH WORK FILED UNDER APPLICATION #B00788637.
B00810877-I1
01/13/2023
Objection raised — Mechanical
01/13/2023
Objection resolved — Addressed
01/11/2023
Objection raised — Scope
01/11/2023
Objection resolved — Addressed
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSTEERING HOUSE CONSTRUCT12/20/2023
DOB NOWPlumbingSigned-offSTARLITE PLBG & HTG CORP08/08/2023
DOB NOWFoundationSigned-offSTEERING HOUSE CONSTRUCT02/08/2023
DOB NOWMechanical SystemsSigned-offSTEERING HOUSE CONSTRUCT01/25/2023
DOB NOWSupport of ExcavationSigned-offSTEERING HOUSE CONSTRUCT01/25/2023
DOB NOWGeneral ConstructionPermit IssuedSTEERING HOUSE CONSTRUCT01/19/2023
DOB NOWConstruction FenceSigned-offSTEERING HOUSE CONSTRUCT01/19/2023
BISOTISSUEDIA CONSTRUCTION MGMT, INC08/08/2013
BISOTISSUEDIA CONSTRUCTION MGMT, INC10/17/2012
BIS—ISSUEDMLZ GENERAL CONSTRUCTION08/13/2007
BISPLISSUEDTREX PLBG02/28/2007
BIS—ISSUEDMLZ GENERAL CONSTRUCTION02/14/2007
BISPLISSUEDALADDIN PLUMBING AND HEATING01/30/1995
BIS—ISSUEDGLENDALE CONSTRUCTION CO. INC.01/12/1995
1 project · most recent 10/23/2023
General Wiring
FiledStatusContractorScope
10/23/2023CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
1 project · most recent 12/04/2024
Steel Concrete Masonry Wood
FiledStatusContractorScope
12/04/2024Permit IssuedSTEERING HOUSE CONSTRUCTSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/12/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/20/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/15/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
12/05/2024Structural Stability – Alterations of existing buildingsJeffrey Stonesspecial
12/05/2024Fire-Resistance Rated ConstructionJeffrey Stonesprogress
12/05/2024Energy Code Compliance InspectionsHOPE DANAprogress
12/05/2024Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
12/04/2024Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
12/04/2024Fire-Resistance Rated ConstructionJeffrey Stonesprogress
12/04/2024Energy Code Compliance InspectionsHOPE DANAprogress
12/04/2024Structural Stability – Alterations of existing buildingsJeffrey Stonesspecial
10/24/2023HVAC-R and service water heating equipmentHOPE DANAenergy_progress
10/24/2023HVAC-R and service water piping design and insulationHOPE DANAenergy_progress
10/24/2023Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
10/24/2023Energy Code Compliance InspectionsHOPE DANAprogress
10/24/2023HVAC-R and service water heating system controlsHOPE DANAenergy_progress
10/16/2023Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
10/16/2023HVAC-R and service water heating system controlsHOPE DANAenergy_progress
10/16/2023HVAC-R and service water piping design and insulationHOPE DANAenergy_progress
10/16/2023HVAC-R and service water heating equipmentHOPE DANAenergy_progress
10/16/2023Energy Code Compliance InspectionsHOPE DANAprogress
08/21/2023Energy Code Compliance InspectionsHOPE DANAprogress
08/21/2023Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
08/21/2023HVAC-R and service water heating system controlsHOPE DANAenergy_progress
08/21/2023HVAC-R and service water piping design and insulationHOPE DANAenergy_progress
08/21/2023HVAC-R and service water heating equipmentHOPE DANAenergy_progress
08/04/2023Footing and FoundationJeffrey Stonesprogress
08/04/2023Structural Stability – Alterations of existing buildingsJeffrey Stonesspecial
Latest 25 of 70.
▾Documents — 134 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/28/2026B08030485-I1Request digital key ↗
08/28/2026B08049556-I1Request digital key ↗
08/27/2026B00810877-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits11
▸DOB NOWLPC Approval/Permit8
08/13/2026B08030485-I1Open ↗
08/13/2026B08030484-I1Open ↗
08/13/2026B00788637-P3Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION2
08/19/2013320571190Open ↗
10/18/2012320571190Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
10/11/2012320571190Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B00788637-P2Open ↗
08/13/2026B00788637-P3Open ↗
08/13/2026B00788637-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00788637-I1Open ↗
▸Seals & Professional Certifications54
▸DOB NOWProgress Inspector Seal & Signature20
09/04/2026B08030484-P2Open ↗
09/04/2026B08030484-P2Open ↗
09/01/2026B08030484-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/04/2026B08030484-P2Open ↗
09/01/2026B08030484-I1Open ↗
09/01/2026B00788637-P2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026B08030485-I1Open ↗
08/27/2026B00810877-I1Open ↗
08/24/2026B00788637-P3Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
10/18/2012320571190Open ↗
10/11/2012320571190Open ↗
09/03/2013320571190Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/11/2012320571190Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/11/2012320571190Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist6
08/13/2026B00788637-P3Open ↗
08/13/2026B00788637-P2Open ↗
08/13/2026B00788637-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/28/2026B08030485-I1Open ↗
08/24/2026B00788637-P3Open ↗
08/24/2026B00788637-S2Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/27/2012320571190Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/18/2012320571190Open ↗
10/11/2012320571190Open ↗
▸BISEN2 - As Built Energy Analysis1
09/03/2013320571190Open ↗
▸BISTR8: Energy Code Progress Inspections1
09/03/2013320571190Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWLandmark Approval3
08/13/2026B08030484-P1Open ↗
08/13/2026B08030484-P3Open ↗
08/13/2026B08030484-P2Open ↗
▸BISLANDMARKS APPROVAL1
10/11/2012320571190Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/11/2012320571190Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST1
09/03/2013320571190Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/03/2013320571190Open ↗
10/11/2012320571190Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
10/11/2012320571190Open ↗
▸Other Documents25
▸DOB NOWPlot Diagram7
08/13/2026B00788637-P4Open ↗
08/13/2026B00788637-S2Open ↗
08/13/2026B00788637-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSite Survey: Initial6
08/13/2026B00788637-S1Open ↗
08/13/2026B00788637-P4Open ↗
08/13/2026B00788637-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/13/2026B00788637-P1Open ↗
08/13/2026B00788637-P3Open ↗
08/13/2026B00788637-P4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification4
08/24/2026B00788637-P2Open ↗
08/24/2026B00788637-P3Open ↗
08/24/2026B00788637-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00788637-S2Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00788637-I1Open ↗