← Back
Building

12 Red Cedar Lane, Staten Island

12 Red Cedar Lane, Staten Island: 23 open violations.

Building facts

Borough
Staten Island
Year built
1996
Stories
3
Dwelling units
2
Zoning
R3-1
Building class
B9

Open violations

Latest 15 of 23 open violations.

IssuedSourceTypeDescription
2025-05-27hpdI§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, P…
2025-05-25hpdA§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR ALL WALLS AND CEILING AT UPPER LEVEL IN THE 2nd ROOM FROM EAST LOCATE…
2025-05-25hpdB§ 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE 2ND ELECTRICAL OUTLET FROM EAST AT SOUTH IN THE KITCHEN LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
2025-05-25hpdB§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT NORTH WALL AT UPPER LEVEL IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT APT 2,…
2025-05-25hpdB§ 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE ELECTRICAL OUTLET AT NORTH WALL AT UPPER LEVEL IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT APT 2, 1st STORY, 1st A…
2025-05-25hpdB§ 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE 1ST ELECTRICAL OUTLET FROM EAST AT SOUTH IN THE KITCHEN LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
2025-05-25hpdB§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING AT MID LEVEL IN THE BATHROOM LOCATED AT APT 2, 1st STORY,…
2025-05-25hpdB§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT MID LEVEL IN THE BATHROOM LOCATED AT APT 2, 1st STORY, 1st APARTMENT…
2025-05-25hpdB§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM NORTH AT EA…
2025-05-25hpdB§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING AT UPPER LEVEL IN THE 5th ROOM FROM EAST LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM…
2025-05-25hpdB§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR ALL WALLS AND CEILING AT UPPER LEVEL IN THE 5th ROOM FROM EAST LOCATE…
2025-05-25hpdB§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FT AT CEILING AT MID LEVEL IN THE BATHROOM LOCATED AT APT 2, 1st…
2025-05-25hpdB§ 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE ELECTRICAL OUTLET AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
2025-04-09hpdB§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2, 2nd STORY…
2025-04-09hpdB§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 2, 2nd STORY, 1s…

Source: NYC Department of Buildings filings, permits and violations. Sign in to BuildNYC for plans on file, inspections and the full building record.