0 Open ViolationsFDNY Report ↗
Flood zone X500
Locations of Work
ArchitecturePlumbingFire Protection
Roof2p · 1 filing · 20 docs
Floor 219p · 2 filings · 20 docs
Floor 119p · 1 filing · 20 docs
Basement19p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZAIM CONTRACTOR2307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYAN DESIGN ARCHITECTURE1302/14/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
APRILE BONAMO FILING REP303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZAIM CONTRACTOR CORPGeneral Contractor507/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN DESIGN ARCHITECTURE71591002/14/2026
Building Lifecycle
All (84)Filed (13)Permit Issued (7)Signed Off (4)Violation (1)Inspection (13)Objection (16)Special Inspection (30)
02/27/2026
Signed off — New Building
NEW BUILDING - 3 STORY, TWO FAMILY RESIDENCE WITH ACCESSORY OFF STREET PARKING FOR TWO CARS.
S00786300-I1
02/14/2026
Filed — New Building
NEW BUILDING - 3 STORY, TWO FAMILY RESIDENCE WITH ACCESSORY OFF STREET PARKING FOR TWO CARS.
S00786300-P4
02/13/2026
Special inspection requirement — Subgrade Inspections
Daniel Ryan
02/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Daniel Ryan
02/13/2026
Special inspection requirement — Metering
Daniel Ryan
02/13/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Daniel Ryan
02/13/2026
Special inspection requirement — Concrete - Cast-In-Place
Daniel Ryan
02/13/2026
Special inspection requirement — Electric vehicle service equipment requirements
Daniel Ryan
02/13/2026
Special inspection requirement — Air barrier - visual inspection
Daniel Ryan
02/13/2026
Special inspection requirement — Interior lighting power
Daniel Ryan
02/13/2026
Special inspection requirement — Air barrier — testing
Daniel Ryan
02/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Daniel Ryan
02/13/2026
Special inspection requirement — Maintenance information
Daniel Ryan
02/13/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Daniel Ryan
02/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
Daniel Ryan
02/13/2026
Special inspection requirement — Insulation placement and R values
Daniel Ryan
02/13/2026
Special inspection requirement — Permanent certificate
Daniel Ryan
02/13/2026
Special inspection requirement — Fenestration air leakage
Daniel Ryan
02/13/2026
Special inspection requirement — Fenestration areas
Daniel Ryan
01/28/2026
Signed off — Alteration
S00786316-I1
01/21/2026
Signed off — Alteration
9' CC
S00786297-I1
01/21/2026
Signed off — Alteration
9' CC
S00786297-S1
01/15/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/02/2026
Permit issued — Curb Cut
S00786297-S1-CC
12/03/2025
Permit issued — Curb Cut
S00786297-I1-CC
12/01/2025
Objection resolved — Addressed
11/28/2025
Objection raised — Scope
11/25/2025
Objection resolved — Addressed
11/04/2025
Filed — New Building
NEW BUILDING - 3 STORY, TWO FAMILY RESIDENCE WITH ACCESSORY OFF STREET PARKING FOR TWO CARS.
S00786300-P3
10/27/2025
Special inspection requirement — Electric vehicle service equipment requirements
Daniel Ryan
10/27/2025
Special inspection requirement — Insulation placement and R values
Daniel Ryan
10/27/2025
Special inspection requirement — Air barrier - visual inspection
Daniel Ryan
10/27/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Daniel Ryan
10/27/2025
Special inspection requirement — Fenestration areas
Daniel Ryan
10/27/2025
Special inspection requirement — Metering
Daniel Ryan
10/27/2025
Special inspection requirement — Subgrade Inspections
Daniel Ryan
10/27/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Daniel Ryan
10/27/2025
Special inspection requirement — Concrete - Cast-In-Place
Daniel Ryan
10/27/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Daniel Ryan
10/27/2025
Special inspection requirement — Energy Code Compliance Inspections
Daniel Ryan
10/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
Daniel Ryan
10/27/2025
Special inspection requirement — Fenestration air leakage
Daniel Ryan
10/21/2025
Objection raised — Zoning
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection raised — Zoning
10/21/2025
Objection raised — Scope
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection raised — Zoning
10/21/2025
Objection resolved — Addressed
10/01/2025
Filed — Alteration
9' CC
S00786297-S1
09/17/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/15/2025
Filed — Alteration
S00786316-P4
07/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/05/2025
Filed — Alteration
S00786316-P3
05/05/2025
Filed — New Building
NEW BUILDING - 3 STORY, TWO FAMILY RESIDENCE WITH ACCESSORY OFF STREET PARKING FOR TWO CARS.
S00786300-P2
04/21/2025
Filed — Alteration
S00786316-P2
04/17/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/10/2025
Objection resolved — Addressed
01/15/2025
Objection raised — Scope
01/06/2025
Filed — New Building
NEW BUILDING - 3 STORY, TWO FAMILY RESIDENCE WITH ACCESSORY OFF STREET PARKING FOR TWO CARS.
S00786300-P1
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offSUFFOLK CONSTRUCT CO. INC01/02/2026
DOB NOWCurb CutSigned-offSUFFOLK CONSTRUCT CO. INC12/03/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR10/15/2024
DOB NOWGeneral ConstructionPermit IssuedSUFFOLK CONSTRUCT CO. INC05/31/2024
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC09/05/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR08/08/2023
DOB NOWGeneral ConstructionPermit IssuedSUFFOLK CONSTRUCT CO. INC04/10/2023
1 project · most recent 12/17/2023
General Wiring
FiledStatusContractorScope
12/17/2023CompleteRIDGE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
01/15/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
09/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/17/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/27/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/17/2024Fail-Final CND-Occupancy InspectionFailView ↗
05/14/2024Fail-Final CND-Occupancy InspectionFailView ↗
01/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/27/2023Pass-Final PL - UndergroundPassView ↗
09/13/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/08/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 88
DateRequirementInspectorRole
02/13/2026Maintenance informationDaniel Ryanenergy_progress
02/13/2026Concrete - Cast-In-PlaceDaniel Ryanspecial
02/13/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDaniel Ryanspecial
02/13/2026Subgrade InspectionsDaniel Ryanspecial
02/13/2026Subsurface Investigations (Borings/Test Pits)Daniel Ryanspecial
02/13/2026Energy Code Compliance InspectionsDaniel Ryanprogress
02/13/2026Fire-Resistance Rated ConstructionDaniel Ryanprogress
02/13/2026Air barrier — testing Daniel Ryanenergy_progress
02/13/2026Insulation placement and R valuesDaniel Ryanenergy_progress
02/13/2026Permanent certificateDaniel Ryanenergy_progress
02/13/2026Electric vehicle service equipment requirementsDaniel Ryanenergy_progress
02/13/2026Fenestration air leakageDaniel Ryanenergy_progress
02/13/2026Air barrier - visual inspectionDaniel Ryanenergy_progress
02/13/2026Fenestration areasDaniel Ryanenergy_progress
02/13/2026Fenestration and door U-factor and product ratingsDaniel Ryanenergy_progress
02/13/2026Interior lighting powerDaniel Ryanenergy_progress
02/13/2026MeteringDaniel Ryanenergy_progress
10/27/2025Air barrier - visual inspectionDaniel Ryanenergy_progress
10/27/2025Electric vehicle service equipment requirementsDaniel Ryanenergy_progress
10/27/2025Insulation placement and R valuesDaniel Ryanenergy_progress
10/27/2025Fenestration areasDaniel Ryanenergy_progress
10/27/2025Fenestration and door U-factor and product ratingsDaniel Ryanenergy_progress
10/27/2025Concrete - Cast-In-PlaceDaniel Ryanspecial
10/27/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDaniel Ryanspecial
10/27/2025Subgrade InspectionsDaniel Ryanspecial
Latest 25 of 88.
▾Documents — 161 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/24/2026S00786297-I1Request digital key ↗
08/24/2026S00786297-S1Request digital key ↗
08/24/2026S00786289-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026S00786300-P2Open ↗
08/13/2026S00786300-I1Open ↗
08/13/2026S00786300-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026S00786300-P1Open ↗
08/13/2026S00786300-P3Open ↗
08/13/2026S00786300-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00786300-I1Open ↗
▸Seals & Professional Certifications101
▸DOB NOWProgress Inspector Seal & Signature68
09/30/2026S00786300-P3Open ↗
09/30/2026S00786300-P3Open ↗
09/30/2026S00786300-P3Open ↗
Showing 3 of 68 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/30/2026S00786300-P3Open ↗
09/30/2026S00786300-P3Open ↗
09/30/2026S00786300-P3Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/24/2026S00786297-I1Open ↗
08/24/2026S00786297-S1Open ↗
08/24/2026S00786289-I1Open ↗
Showing 3 of 13 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026S00786300-P4Open ↗
08/13/2026S00786300-P3Open ↗
08/13/2026S00786300-P2Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist5
08/13/2026S00786300-P2Open ↗
08/13/2026S00786300-P3Open ↗
08/13/2026S00786300-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00786300-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00786300-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00786300-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00786300-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT5
08/13/2026S00786300-I1Open ↗
08/13/2026S00786300-P1Open ↗
08/13/2026S00786300-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00786300-I1Open ↗
▸Other Documents16
▸DOB NOWSite Survey: Initial5
08/13/2026S00786300-P2Open ↗
08/13/2026S00786300-P4Open ↗
08/13/2026S00786300-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026S00786300-P2Open ↗
08/13/2026S00786300-I1Open ↗
08/13/2026S00786300-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/19/2026S00786300-I1Open ↗
08/19/2026S00786300-P1Open ↗
08/19/2026S00786300-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFinal Survey1
08/13/2026S00786300-I1Open ↗