← Back
Church, synagogue, chapel
12 WEST 131 STREET
MANHATTAN · Harlem (North) · BIN 1053796
💬 Discuss this project
1910Year Built
3Stories
M1Building Class
R7-2Zoning
3,825 sfGross Floor Area
1Units
4 Open Violations 3 unresolved · 1 paperwork only ▸FDNY Report ↗
Church, synagogue, chapel · Owner of record: 12 WEST 131 ST LLC · 1,740 sf lot · 2.2 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction54p · 1 filing · 20 docs
Floor 3Under Construction50p · 1 filing · 20 docs
Floor 2Under Construction51p · 2 filings · 20 docs
Floor 1Under Construction52p · 1 filing · 20 docs
CellarUnder Construction57p · 2 filings · 20 docs
BasementUnder Construction50p · 1 filing · 20 docs
Filed — no permit issued3p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAPPHIRE CONSTRUCTION GROUP909/01/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/29/2025$1.8M—— → —$458/sf building
06/03/2022$1.1M—— → —$288/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LUKE LICALZI, P.E., P.C.908/25/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAPPHIRE CONSTRUCTION GR*General Contractor307/02/2026
DAVRY ELECTRIC INCElectrical103/22/2026
P.H. WORKS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
H2 CONSULTING PE PC835305/28/2026
JON LIBASCI3068505/28/2026
Building Lifecycle
All (93)Filed (9)Permit Issued (4)Violation (14)Objection (36)Special Inspection (30)
08/26/2026
Objection resolved — Resolved
08/26/2026
Objection resolved — Resolved
08/26/2026
Objection resolved — Resolved
08/25/2026
Filed — Alteration CO
interior renovation of existing cellar, basement and three stories, conversion of cellar and 01 from community facility to residential use. Demolition and construction of misc. non-bearing partitions, installation of new window openings at rear wall. AlT1
M01073138-S2
08/20/2026
Objection raised — Accessibility
08/20/2026
Objection raised — Accessibility
08/20/2026
Objection raised — Accessibility
08/11/2026
Objection resolved — Resolved
08/11/2026
Objection resolved — Addressed
08/11/2026
Objection resolved — Resolved
08/11/2026
Objection resolved — Resolved
08/11/2026
Objection resolved — Resolved
08/11/2026
Objection resolved — Resolved
08/11/2026
Special inspection requirement — Maintenance information
08/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/11/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/04/2026
Objection resolved — Resolved
08/03/2026
Objection resolved — Resolved
08/01/2026
Objection raised — Accessibility
08/01/2026
Objection raised — Structural
08/01/2026
Objection raised — Scope
08/01/2026
Objection raised — Structural
08/01/2026
Objection raised — Admin
08/01/2026
Objection raised — Admin
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection resolved — Resolved
07/17/2026
Objection raised — Accessibility
07/17/2026
Objection raised — Accessibility
07/06/2026
Filed — Alteration CO
interior renovation of existing cellar, basement and three stories, conversion of cellar and 01 from community facility to residential use. Demolition and construction of misc. non-bearing partitions, installation of new window openings at rear wall. AlT1
M01073138-S4
06/30/2026
Permit issued — General Construction
M01073138-I1-GC
06/29/2026
Objection resolved — Addressed
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/23/2026
Special inspection requirement — Sprinkler Systems
06/18/2026
Filed — Alteration CO
interior renovation of existing cellar, basement and three stories, conversion of cellar and 01 from community facility to residential use. Demolition and construction of misc. non-bearing partitions, installation of new window openings at rear wall. AlT1
M01073138-S1
06/18/2026
Objection raised — Accessibility
06/18/2026
Objection raised — Accessibility
06/18/2026
Objection raised — Admin
05/29/2026
Violation issued (ECB, open)
Construction
05/28/2026
Filed — Alteration CO
interior renovation of existing cellar, basement and three stories, conversion of cellar and 01 from community facility to residential use. Demolition and construction of misc. non-bearing partitions, installation of new window openings at rear wall. AlT1
M01073138-P2
05/28/2026
Special inspection requirement — Air barrier - visual inspection
05/28/2026
Special inspection requirement — Metering
05/28/2026
Special inspection requirement — Maintenance information
05/28/2026
Special inspection requirement — Permanent certificate
05/28/2026
Special inspection requirement — Insulation placement and R values
05/28/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
04/28/2026
Special inspection requirement — Interior lighting power
jon libasci
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
jon libasci
04/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Harry Hong
04/28/2026
Special inspection requirement — Energy Code Compliance Inspections
jon libasci
04/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
jon libasci
04/28/2026
Special inspection requirement — Fenestration air leakage
jon libasci
04/28/2026
Special inspection requirement — Exterior lighting power
jon libasci
04/28/2026
Special inspection requirement — Fenestration areas
jon libasci
03/31/2026
Violation issued (ECB, closed)
Construction
02/26/2026
Special inspection requirement — Lighting controls
jon libasci
02/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Harry Hong
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSAPPHIRE CONSTRUCTION GR*06/30/2026
DOB NOWPlumbingPermit IssuedP.H. WORKS INC12/04/2025
DOB NOWGeneral ConstructionPermit IssuedSAPPHIRE CONSTRUCTION GR*09/09/2025
DOB NOWGeneral ConstructionPermit IssuedSAPPHIRE CONSTRUCTION GR*05/05/2025
3 projects · most recent 12/28/2025
General Wiring
FiledStatusContractorScope
12/28/2025Permit IssuedDAVRY ELECTRIC INCGeneral Wiring
12/28/2025Permit IssuedDAVRY ELECTRIC INC—
12/28/2025Permit IssuedDAVRY ELECTRIC INCGeneral Wiring
1 project · most recent 01/09/2026
Fence
FiledStatusContractorScope
01/09/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
08/11/2026Maintenance information—energy_progress
08/11/2026HVAC-R and service water heating system controls—energy_progress
08/11/2026HVAC-R and service water piping design and insulation—energy_progress
08/11/2026HVAC-R and service water heating equipment—energy_progress
08/11/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
08/11/2026Energy Code Compliance Inspections—progress
08/11/2026Fire-Resistant Penetrations and Joints—special
06/25/2026Fire-Resistant Penetrations and Joints—special
06/23/2026Sprinkler Systems—special
05/28/2026Air barrier - visual inspection—energy_progress
05/28/2026Metering—energy_progress
05/28/2026Maintenance information—energy_progress
05/28/2026Permanent certificate—energy_progress
05/28/2026Insulation placement and R values—energy_progress
05/28/2026Exterior Insulation and Finish Systems (EIFS)—special
04/28/2026Interior lighting powerjon libascienergy_progress
04/28/2026Fire-Resistant Penetrations and Jointsjon libascispecial
04/28/2026Structural Stability – Alterations of existing buildingsHarry Hongspecial
04/28/2026Energy Code Compliance Inspectionsjon libasciprogress
04/28/2026Fire-Resistance Rated Constructionjon libasciprogress
04/28/2026Fenestration air leakagejon libascienergy_progress
04/28/2026Exterior lighting powerjon libascienergy_progress
04/28/2026Fenestration areasjon libascienergy_progress
02/26/2026Lighting controlsjon libascienergy_progress
02/26/2026Structural Stability – Alterations of existing buildingsHarry Hongspecial
Latest 25 of 49.
▾Documents — 79 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/26/2026M01073138-S3Request digital key ↗
08/26/2026M01073138-S2Request digital key ↗
08/26/2026M01100377-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026M01073138-P1Open ↗
08/13/2026M01073138-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026M01073138-P2Open ↗
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature26
08/30/2026M01073138-I1Open ↗
08/30/2026M01073138-I1Open ↗
08/30/2026M01073138-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026M01073138-S2Open ↗
08/26/2026M01100377-I1Open ↗
08/25/2026M01167308-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/30/2026M01073138-I1Open ↗
08/30/2026M01073138-I1Open ↗
08/25/2026M01073138-P2Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/14/2026M01073138-P2Open ↗
08/13/2026M01073138-I1Open ↗
08/13/2026M01073138-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M01073138-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/26/2026M01073138-S2Open ↗
08/26/2026M01100377-I1Open ↗
08/25/2026M01167308-I1Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms1
▸DOB NOWAI1 Form1
08/17/2026M01073138-I1Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification3
08/14/2026M01073138-P2Open ↗
08/13/2026M01073138-I1Open ↗
08/13/2026M01073138-P1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026M01073138-P2Open ↗
▸DOB NOWPlot Diagram1
08/14/2026M01073138-P2Open ↗