← Back
Predominantly retail with other uses
12 WEST 19 STREET
MANHATTAN · BIN 1015457
💬 Discuss this project
1852Year Built
3Stories
K4Building Class
C6-4AZoning
5,050 sfGross Floor Area
6Units
Rent Stabilized1 Open Violation ▸
Predominantly retail with other uses · Owner of record: 12 WEST 19 LLC · 2,300 sf lot · 2.2 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof1p · 1 filing · 7 docs
Bulkhead1p · 1 filing · 7 docs
Floor 71 filing · 2 docs
Floor 61 filing · 2 docs
Floor 51 filing · 2 docs
Floor 41 filing · 2 docs
Floor 31 filing · 2 docs
Floor 21 filing · 2 docs
Floor 11 filing · 2 docs
Mezzanine6p · 3 filings · 17 docs
Cellar1p · 1 filing · 7 docs
1 job · most recent 11/29/2022
Water/Sanitary
FiledStatusContractorScope
11/29/2022Permit IssuedA&A PLUMBING CORPWater/Sanitary
4 jobs · most recent 01/06/2023
General Wiring
FiledStatusContractorScope
01/06/2023CompleteCROSSWIRE ELECTRICAL INCGeneral Wiring
09/16/2021CompleteEASTERN ELEC'L TECHNOLOGIGeneral Wiring
06/28/2018CompleteR.J.ELECTRICAL CONTRACTORGeneral Wiring
05/22/2018CompleteV. VASS ELECTRIC CORP—
1 job · most recent 01/31/2023
Steel
FiledStatusContractorScope
01/31/2023Signed-offJ. PHELAN CONSTRUCTION COSteel
Building Lifecycle
All (96)Filed (11)Permit Issued (14)Signed Off (6)Violation (35)Inspection (2)Special Inspection (28)
09/16/2024
Signed off — Alteration
REFACE ONLY OF EXISTING NON-ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - THERAPIE CLINIC. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01045633-I1
07/15/2024
Permit issued — Sign
M01045633-I1-SG
06/13/2024
Filed — Alteration
REFACE ONLY OF EXISTING NON-ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - THERAPIE CLINIC. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01045633-I1
06/13/2024
Special inspection requirement — Final
ADITYA DESAI
02/20/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/20/2023
Signed off — Alteration
installation of new HVAC system for first and mezzanine level with new ducts works and units all as shown on drawings filed herewith. no change in use egress or occupancy
M08037164-I1
11/13/2023
Signed off — Alteration
installation of new sprinkler system heads and piping on the mezzanine and first floor level. all as shown on drawings filed herewith. no change in use egress or occupancy
M08037185-I1
11/13/2023
Signed off — Alteration
Demolition and construction of interior partition and suspended ceilings for new ground floor and mezzanine commercial establishment
M08019300-I1
08/29/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/05/2023
Permit issued — General Construction
M08019300-I1-GC
04/14/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/28/2023
Permit issued — Supported Scaffold
M00834039-I1-SF
02/23/2023
Filed — Alteration
M00834039-I1
02/14/2023
Permit issued — Structural
M00803578-I1-ST
01/31/2023
Filed — Alteration
New Mechanical platform at mezzanine level and installation of structural steel dunnage at roof and bulk head on existing roof
M00803578-I1
01/31/2023
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
12/28/2022
Permit issued — Plumbing
M00816345-I1-PL
12/28/2022
Permit issued — Sprinklers
M08037185-I1-EW-SP
12/22/2022
Special inspection requirement — Structural Steel - Details
Ari Kamo
12/22/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ari Kamo
12/22/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Ari Kamo
12/22/2022
Special inspection requirement — Final
Ari Kamo
12/22/2022
Special inspection requirement — Structural Steel - Welding
Ari Kamo
12/22/2022
Special inspection requirement — Post-installed Anchors
Ari Kamo
12/22/2022
Special inspection requirement — Structural Cold-Formed Steel
Ari Kamo
12/20/2022
Permit issued — General Construction
M08019300-I1-GC
12/02/2022
Permit issued — General Construction
M08019300-I1-GC
11/29/2022
Filed — Alteration
installation of new HVAC system for first and mezzanine level with new ducts works and units all as shown on drawings filed herewith. no change in use egress or occupancy
M08037164-I1
11/29/2022
Filed — Alteration
installation of new sprinkler system heads and piping on the mezzanine and first floor level. all as shown on drawings filed herewith. no change in use egress or occupancy
M08037185-I1
11/29/2022
Filed — Alteration
installation of new plumbing fixtures and piping on the mezzanine and first floor level. all as shown on drawings filed herewith. no change in use egress or occupancy
M00816345-I1
11/22/2022
Special inspection requirement — Tenant Protection Plan Compliance
JACK GREEN
11/22/2022
Special inspection requirement — Tenant Protection Plan Compliance
JACK GREEN
11/14/2022
Special inspection requirement — Maintenance information
JACK GREEN
11/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
11/14/2022
Special inspection requirement — Energy Code Compliance Inspections
JACK GREEN
11/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
11/14/2022
Special inspection requirement — Energy Code Compliance Inspections
JACK GREEN
11/14/2022
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
11/14/2022
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
11/14/2022
Special inspection requirement — Shutoff dampers
JACK GREEN
11/09/2022
Filed — Alteration
Demolition and construction of interior partition and suspended ceilings for new ground floor and mezzanine commercial establishment
M08019300-I1
11/09/2022
Special inspection requirement — Mechanical Systems
JACK GREEN
11/09/2022
Special inspection requirement — Tenant Protection Plan Compliance
JACK GREEN
11/09/2022
Special inspection requirement — Final
JACK GREEN
10/11/2022
Special inspection requirement — Final
JACK GREEN
10/11/2022
Special inspection requirement — Fire-Resistance Rated Construction
JACK GREEN
10/11/2022
Special inspection requirement — Energy Code Compliance Inspections
David Stern
10/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
10/11/2022
Special inspection requirement — Air barrier - visual inspection
David Stern
01/06/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00563102-I1
12/30/2021
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00046484-I1
08/23/2021
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00563102-P1
07/29/2021
Special inspection requirement — Final
Paul Perdek
07/27/2021
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00563102-I1
07/27/2021
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00046484-P1
07/27/2021
Permit issued — Supported Scaffold
M00563102-I1-SF
04/06/2021
Permit issued — Sidewalk Shed
M00046484-I1-SH
03/19/2021
Violation issued (ECB, closed)
Site Safety
03/19/2021
Violation issued (ECB, closed)
Construction
09/21/2020
Violation issued (ECB, closed)
Construction
Latest 60 of 96 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRI BOROUGH SCAFFOLDING1307/08/2026
366 WILLIS2707/08/2026
12 WEST 191803/22/2026
3-G SERVICES LIMITED703/22/2026
STREAMING USA LLC203/22/2026
3-6 SERVICES LIMITED103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/04/2016$9.5M—12 WEST 19TH STREET CORP. → 12 WEST 19 LLC$1,881/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERICAN GOTHAM CONSULTANTS1003/21/2026
LOUIS STRIAR203/21/2026
AE DESIGN SOLUTION803/21/2026
CONSOLIDATED SCAFFOLD BRIDGE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI BOROUGH SCAFFOLDINGGeneral Contractor1007/08/2026
J. PHELAN CONSTRUCTION COGeneral Contractor603/21/2026
CAPITAL IMPROVEMENT SERVICESGeneral Contractor203/21/2026
BREFFNI MECHANICAL INCGeneral Contractor203/21/2026
SIGNS CADScaffold107/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor107/08/2026
A&A PLUMBING CORPPlumbing107/08/2026
CAPITOL FIRE SPRINKLER COFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK ENGINEERING PC678101/31/2023
JACK GREEN ASSOCIATES422411/29/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offSIGNS CAD CORP07/15/2024
DOB NOWGeneral ConstructionSigned-offJ PHELAN CONSTRUCTION07/05/2023
DOB NOWSupported ScaffoldPermit IssuedCONSOLIDATED SCAFFOLDING02/28/2023
DOB NOWStructuralSigned-offJ PHELAN CONSTRUCTION02/14/2023
DOB NOWPlumbingPermit IssuedA&A PLUMBING CORP12/28/2022
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO12/28/2022
DOB NOWGeneral ConstructionSigned-offJ PHELAN CONSTRUCTION12/20/2022
DOB NOWGeneral ConstructionSigned-offCAPITAL IMPROVEMENT SERVI12/02/2022
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING07/27/2021
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING04/06/2021
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING04/02/2020
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING03/29/2019
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING11/28/2018
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING05/26/2018
BISPLISSUEDADRIANO PLMBG & HTG CORP07/28/2021
BISEQISSUED3-G SERVICES LIMITED07/02/2021
BIS—ISSUED3-G SERVICES LIMITED06/29/2021
BISPLISSUEDADRIANO PLMBG & HTG CORP07/29/2020
BIS—RE-ISSUED3-G SERVICES LIMITED07/10/2020
BISEQISSUED3-G SERVICES LIMITED07/10/2020
BIS—ISSUEDSTREAMLINE USA LLC10/24/2019
BISEQISSUEDSTREAMLINE USA LLC09/05/2019
BISPLISSUEDADVANCED PLUMBING MECH08/05/2019
BIS—ISSUEDSTREAMLINE USA LLC09/06/2018
BISEQISSUEDSTREAMLINE USA LLC09/06/2018
BISPLISSUEDADVANCED PLUMBING MECH06/29/2018
BIS—ISSUEDSTREAMLINE USA LLC06/12/2018
BISEQISSUEDSTREAMLINE USA LLC06/12/2018
BISPLISSUEDGENET PLBG AND HTG CORP12/17/2009
BISMHISSUEDGENET PLUMBING AND HEATING12/17/2009
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/29/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/14/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
06/13/2024FinalADITYA DESAIprogress
01/31/2023Tenant Protection Plan ComplianceAri Kamospecial
12/22/2022Structural Steel - DetailsAri Kamospecial
12/22/2022Structural Stability – Alterations of existing buildingsAri Kamospecial
12/22/2022Structural Steel - High Strength BoltingAri Kamospecial
12/22/2022FinalAri Kamoprogress
12/22/2022Structural Steel - WeldingAri Kamospecial
12/22/2022Post-installed AnchorsAri Kamospecial
12/22/2022Structural Cold-Formed SteelAri Kamospecial
11/22/2022Tenant Protection Plan ComplianceJACK GREENspecial
11/22/2022Tenant Protection Plan ComplianceJACK GREENspecial
11/14/2022Maintenance informationJACK GREENenergy_progress
11/14/2022Fire-Resistant Penetrations and JointsJACK GREENspecial
11/14/2022Energy Code Compliance InspectionsJACK GREENprogress
11/14/2022Fire-Resistant Penetrations and JointsJACK GREENspecial
11/14/2022Energy Code Compliance InspectionsJACK GREENprogress
11/14/2022HVAC-R and service water heating system controlsJACK GREENenergy_progress
11/14/2022HVAC-R and service water heating equipmentJACK GREENenergy_progress
11/14/2022Shutoff dampersJACK GREENenergy_progress
11/09/2022Mechanical SystemsJACK GREENspecial
11/09/2022Tenant Protection Plan ComplianceJACK GREENspecial
11/09/2022FinalJACK GREENprogress
10/11/2022FinalJACK GREENprogress
10/11/2022Fire-Resistance Rated ConstructionJACK GREENprogress
10/11/2022Energy Code Compliance InspectionsDavid Sternprogress
Latest 25 of 28.
▾Documents — 258 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch10
09/06/2026M00046484-I1Request digital key ↗
09/03/2026M00563102-P1Request digital key ↗
09/03/2026M00563102-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/06/2026M00046484-I1Request digital key ↗
08/15/2026M00046484-P1Request digital key ↗
▸Applications & Permits55
▸BISPLAN / WORK APPROVAL APPLICATION33
06/08/2022120195154Open ↗
05/21/2022122979330Open ↗
05/10/2022120195154Open ↗
Showing 3 of 33 on file for this type
▸BISWORK PERMIT APPLICATION15
02/19/2021122979330Open ↗
07/29/2020122979330Open ↗
07/13/2020122979330Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWLPC Approval/Permit5
08/13/2026M01045633-I1Open ↗
08/13/2026M08019300-I1Open ↗
08/13/2026M00803578-I1Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
05/25/2021141001298Open ↗
05/17/2021141001298Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISVERIFY TAX LOT1
02/17/2022122979330Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/27/2022122979330Open ↗
▸BISZONING DIAGRAM1
01/31/2018122979330Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/13/2017122979330Open ↗
▸Seals & Professional Certifications39
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/06/2026M00046484-I1Open ↗
09/06/2026M00046484-P1Open ↗
09/03/2026M00563102-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
05/16/2019122979330Open ↗
05/16/2019122979330Open ↗
06/13/2018122979330Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026M08037164-I1Open ↗
09/02/2026M08037164-I1Open ↗
09/01/2026M00803578-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026M08037164-I1Open ↗
09/01/2026M00803578-I1Open ↗
09/01/2026M00803578-I1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/17/2021141001298Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/14/2009120195154Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment24
▸BISSCHEDULE B - PLUMBING8
02/10/2022122979330Open ↗
02/09/2022122979330Open ↗
08/16/2021122979330Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS6
04/21/2022122979330Open ↗
04/21/2022122979330Open ↗
04/21/2022122979330Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
02/09/2022122979330Open ↗
02/09/2022122979330Open ↗
07/26/2017122979330Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
04/21/2022122979330Open ↗
03/03/2022122979330Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
03/08/2010120195154Open ↗
12/28/2009120195154Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/17/2022122979330Open ↗
▸BISSPRINKLER SYSTEMS1
02/28/2022122979330Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST3
05/17/2021141001298Open ↗
12/27/2016122979330Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00046484-P1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026M00816345-I1Open ↗
09/01/2026M08037185-I1Open ↗
09/01/2026M08037164-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
11/14/2009120195154Open ↗
Showing 1 of 3 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/23/2018123403520Open ↗
12/27/2016122979330Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
06/13/2018122979330Open ↗
01/31/2018122979330Open ↗
01/31/2018122979330Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/10/2022122979330Open ↗
▸BISFENESTRATION AREAS1
02/10/2022122979330Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/10/2022122979330Open ↗
▸BISLIGHTING IN DWELLING UNITS1
02/25/2022122979330Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/14/2022122979330Open ↗
▸BISLIGHTING CONTROLS1
03/17/2022122979330Open ↗
▸BIS* HVAC INSULATION AND SEALING1
12/17/2021122979330Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/21/2022122979330Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY6
01/24/2022122979330Open ↗
12/29/2021122979330Open ↗
12/20/2021122979330Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
10/14/2020122979330Open ↗
06/06/2019122979330Open ↗
06/13/2018122979330Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING2
05/20/2019122979330Open ↗
05/16/2019122979330Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
12/23/2021122979330Open ↗
▸BISMASONRY1
12/23/2021122979330Open ↗
▸BISPOST-INSTALLED ANCHORS1
02/14/2022122979330Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
12/23/2021122979330Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
01/12/2022122979330Open ↗
▸BISMASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS1
01/12/2022122979330Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
12/23/2021122979330Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
12/23/2021122979330Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
06/13/2018122979330Open ↗
▸Approvals, Objections & Sign-offs16
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/13/2020122979330Open ↗
07/13/2020122979330Open ↗
09/05/2019122979330Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS APPROVAL4
05/17/2021141001298Open ↗
01/31/2018122979330Open ↗
01/31/2018122979330Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER4
02/19/2021122979330Open ↗
07/29/2020122979330Open ↗
10/24/2019122979330Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
12/22/2020122979330Open ↗
12/27/2016122979330Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT5
08/23/2018123403520Open ↗
07/26/2017122979330Open ↗
01/06/2017122979330Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
07/13/2020122979330Open ↗
10/24/2019122979330Open ↗
08/02/2019122979330Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
05/05/2022123403520Open ↗
04/01/2022122979330Open ↗
▸Filing & Intake Forms19
▸BISADDITIONAL INFORMATION9
03/23/2022122979330Open ↗
03/18/2022122979330Open ↗
02/10/2022122979330Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET6
08/23/2018123403520Open ↗
07/26/2017122979330Open ↗
01/06/2017122979330Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
02/19/2021122979330Open ↗
07/29/2020122979330Open ↗
09/27/2019122979330Open ↗
Showing 3 of 4 on file for this type
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
06/08/2022120195154Open ↗
05/17/2021141001298Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
12/23/2021122979330Open ↗
▸BISMAINTENANCE INFORMATION1
12/17/2021122979330Open ↗
▸BISTCO - Supporting Documents1
04/13/2022122979330Open ↗
▸BISPRIVATE ON SITE STORM WATER DRAINAGE DISPOSAL SYSTEMS, AND DETENTION FACILITIESINSTALLATION.1
04/13/2022122979330Open ↗
▸BISPLOT DIAGRAM1
01/31/2018122979330Open ↗