← Back
Two stories - detached, small or mid-size
120-03 103 AVENUE
QUEENS · South Richmond Hill · BIN 4200635
💬 Discuss this project
1901Year Built
2.5Stories
A1Building Class
R4-1Zoning
2,347 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 3,780 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/19/2022$1.1M—Private party → Private party$460/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HANSA BUILDING ENGINEERING SERVICES302/19/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOPE HOME IMPROVEMENT INCGeneral Contractor303/21/2026
TRI CITY MECHANICAL GROUP CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASKON ARCHITECT, P.C.3596302/19/2024
Building Lifecycle
All (21)Filed (3)Permit Issued (2)Signed Off (2)Violation (3)Inspection (6)Special Inspection (5)
03/28/2024
Signed off — Alteration
PROPOSE 3-PIECE BATHROOM (WB,WC, SHOWER), LAUNDRY ROOM & TANK-LESS BOILER AT CELLAR. REMOVAL OF OIL BOILER AND OIL TANK.
Q00863111-S1
03/07/2024
Signed off — Alteration
PROPOSE 3-PIECE BATHROOM (WB,WC, SHOWER), LAUNDRY ROOM & TANK-LESS BOILER AT CELLAR. REMOVAL OF OIL BOILER AND OIL TANK.
Q00863111-I1
02/28/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/19/2024
Filed — Alteration
PROPOSE 3-PIECE BATHROOM (WB,WC, SHOWER), LAUNDRY ROOM & TANK-LESS BOILER AT CELLAR. REMOVAL OF OIL BOILER AND OIL TANK.
Q00863111-P1
02/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/16/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/26/2023
Permit issued — Plumbing
Q00863111-S1-PL
05/17/2023
Permit issued — General Construction
Q00863111-I1-GC
05/15/2023
Filed — Alteration
PROPOSE 3-PIECE BATHROOM (WB,WC, SHOWER), LAUNDRY ROOM & TANK-LESS BOILER AT CELLAR. REMOVAL OF OIL BOILER AND OIL TANK.
Q00863111-S1
05/11/2023
Filed — Alteration
PROPOSE 3-PIECE BATHROOM (WB,WC, SHOWER), LAUNDRY ROOM & TANK-LESS BOILER AT CELLAR. REMOVAL OF OIL BOILER AND OIL TANK.
Q00863111-I1
04/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
HANSA PERSAUD
04/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
04/20/2023
Special inspection requirement — Insulation placement and R values
HANSA PERSAUD
04/20/2023
Special inspection requirement — Interior lighting power
HANSA PERSAUD
04/20/2023
Special inspection requirement — Metering
HANSA PERSAUD
09/21/2004
Violation issued (ECB, closed)
Quality of Life
09/21/2004
Violation issued (ECB, closed)
Quality of Life
08/24/1998
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP05/26/2023
DOB NOWGeneral ConstructionSigned-offHOPE HOME IMPROVEMENT INC05/17/2023
1 project · most recent 04/09/2023
General Wiring
FiledStatusContractorScope
04/09/2023Permit IssuedINFINITI ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/28/2024Pass-Final General Construction Non-Directive 14PassView ↗
02/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/16/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/24/2023Fire-Resistance Rated ConstructionHANSA PERSAUDprogress
04/20/2023Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
04/20/2023Insulation placement and R valuesHANSA PERSAUDenergy_progress
04/20/2023Interior lighting powerHANSA PERSAUDenergy_progress
04/20/2023MeteringHANSA PERSAUDenergy_progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/23/2026Q00863111-P1Request digital key ↗
08/23/2026Q00863111-I1Request digital key ↗
08/23/2026Q00863111-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWRestrictive Declaration/Easement 13
08/23/2026Q00863111-P1Open ↗
08/13/2026Q00863111-S1Open ↗
08/13/2026Q00863111-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026Q00863111-S1Open ↗
08/23/2026Q00863111-I1Open ↗
08/23/2026Q00863111-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026Q00863111-I1Open ↗
08/27/2026Q00863111-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026Q00863111-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026Q00863111-S1Open ↗
08/23/2026Q00863111-I1Open ↗
08/23/2026Q00863111-P1Open ↗