← Back
Walk-up apt, over six families with stores
120-10 QUEENS BOULEVARD
QUEENS · BIN 4080149
💬 Discuss this project
1923Year Built
5Stories
C7Building Class
C4-4Zoning
52,011 sfGross Floor Area
43Units
LL97 CoveredRent Stabilized2 Open Violations 1 unresolved · 1 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: THE HOME SAVINGS BANK · 23,000 sf lot · 2.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction22p · 2 filings · 20 docs
Floor 1Under Construction26p · 2 filings · 20 docs
CellarUnder Construction32p · 2 filings · 20 docs
Sub-Basement1 filing · 5 docs
1 job · most recent 10/21/2024
Air Conditioning Systems Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/21/2024Signed-offTOMAK GROUP INCAir Conditioning Systems, Associated Ducts and Piping, Ventilation Systems
Cooling
Mitsubishi Electric PUMY-P36NKMU3 36,000 BTU · Vrf Outdoor ×3
PUMY-P48NKMU3 48,000 BTU · Vrf Outdoor ×3
PUMY-P60NKMU3 60,000 BTU · Vrf Outdoor ×3
Ventilation
Accurex XDG-P115-H05-VFD 1,833 CFM · Kitchen Exhaust ×3
Ducts & Piping
N/A NA 5,000 CFM · Ductwork ×18
2 jobs · most recent 02/06/2024
Water/Sanitary Gas
FiledStatusContractorScope
02/06/2024——Water/Sanitary
07/12/2022Permit IssuedG.P. MECHANICAL CORPGas, Water/Sanitary
16 jobs · most recent 01/14/2025
General Wiring
FiledStatusContractorScope
01/14/2025Permit IssuedLUNA NYC ELECTRIC CORPGeneral Wiring
05/07/2024CompleteCITY GRID ELECTRIC CORPGeneral Wiring
12/20/2023Permit IssuedLUNA NYC ELECTRIC CORPGeneral Wiring
12/20/2023Permit IssuedLUNA NYC ELECTRIC CORPGeneral Wiring
12/19/2023Permit IssuedLUNA NYC ELECTRIC CORPGeneral Wiring
12/19/2023CancelledLUNA NYC ELECTRIC CORPGeneral Wiring
12/19/2023Permit IssuedLUNA NYC ELECTRIC CORPGeneral Wiring
12/19/2023Permit IssuedLUNA NYC ELECTRIC CORP—
12/19/2023Permit IssuedLUNA NYC ELECTRIC CORPGeneral Wiring
12/19/2023Permit IssuedLUNA NYC ELECTRIC CORPGeneral Wiring
12/07/2023CompleteSOLAS ELECTRICAL CORP—
08/02/2023CompleteSEGA ELECTRIC LLCGeneral Wiring
01/23/2023Permit IssuedREDGRAVE ELECTL MAINTNCE45 meters, 1 new_meters
05/25/2021Permit IssuedSPIRO ELECTRIC INC.General Wiring
05/03/2021CompleteRICHARD NEU—
1 job · most recent 10/21/2024
Steel
FiledStatusContractorScope
10/21/2024Signed-offTOMAK GROUP INCSteel
Building Lifecycle
All (154)Filed (17)Permit Issued (22)Signed Off (8)Violation (60)Inspection (3)Objection (14)Special Inspection (30)
01/29/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/12/2025
Signed off — Alteration
NEW INSTALLATION 1 HAND SINK, 1 3compartment sink WITH GREASE TRAP AS PER PLAN.
Q00999118-I1
12/01/2025
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT EXISTING COMMERCIAL SPACE IN CONJUNCTION WITH GC APPLICATION Q00487459-I1
Q00487459-S2
10/30/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/05/2025
Violation issued (ECB, closed)
Unknown
12/24/2024
Permit issued — Structural
Q00487459-S2-ST
11/13/2024
Objection resolved — Addressed
10/30/2024
Objection raised — Admin
10/21/2024
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT EXISTING COMMERCIAL SPACE IN CONJUNCTION WITH GC APPLICATION Q00487459-I1
Q00487459-S2
10/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
TENZIN NYANDAK
10/18/2024
Special inspection requirement — Structural Steel - Details
TENZIN NYANDAK
10/18/2024
Special inspection requirement — Structural Steel - High Strength Bolting
TENZIN NYANDAK
10/18/2024
Special inspection requirement — Structural Steel - Welding
TENZIN NYANDAK
10/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
TENZIN NYANDAK
10/18/2024
Special inspection requirement — Final
TENZIN NYANDAK
10/14/2024
Permit issued — General Construction
Q00487459-I1-GC
07/09/2024
Signed off — Alteration
APPLICATION FILE TO EXTERIOR FACADE REPAIR AS BRICK POINTING AND BRICK CRACK REPAIR AT PARTIAL FRONT ELEVATION (QUEENS BLVDE. SIDE) AS PER PLAN. NO CHANGE IN SURE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00965039-I1
07/03/2024
Signed off — Alteration
Q00976357-I1
06/28/2024
Special inspection requirement — Mechanical Systems
Matthew Bendix
06/28/2024
Special inspection requirement — Energy Code Compliance Inspections
Matthew Bendix
06/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Matthew Bendix
06/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
Matthew Bendix
06/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
Matthew Bendix
06/28/2024
Special inspection requirement — Maintenance information
Matthew Bendix
06/28/2024
Special inspection requirement — Final
Matthew Bendix
06/26/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/12/2024
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT EXISTING COMMERCIAL SPACE IN CONJUNCTION WITH GC APPLICATION Q00487459-I1
Q00487459-P3
06/11/2024
Permit issued — Mechanical Systems
Q00487459-S1-MS
06/05/2024
Permit issued — Plumbing
Q00488058-I1-PL
06/05/2024
Special inspection requirement — Mechanical Systems
Matthew Bendix
06/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
Matthew Bendix
06/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
Matthew Bendix
06/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Matthew Bendix
06/05/2024
Special inspection requirement — Final
Matthew Bendix
06/05/2024
Special inspection requirement — Maintenance information
Matthew Bendix
06/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Matthew Bendix
04/19/2024
Violation issued (ECB, closed)
Unknown
04/19/2024
Violation issued (ECB, closed)
Construction
04/19/2024
Violation issued (ECB, closed)
Construction
04/19/2024
Violation issued (ECB, closed)
Unknown
04/19/2024
Violation issued (ECB, closed)
Construction
03/14/2024
Permit issued — General Construction
Q00999118-I1-GC
02/06/2024
Filed — Alteration
NEW INSTALLATION 1 HAND SINK, 1 3compartment sink WITH GREASE TRAP AS PER PLAN.
Q00999118-I1
02/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
KARTIK CHANDA
02/01/2024
Special inspection requirement — Fire-Resistance Rated Construction
KARTIK CHANDA
02/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
01/08/2024
Permit issued — Sidewalk Shed
Q00976357-I1-SH
12/26/2023
Permit issued — General Construction
Q00965039-I1-GC
12/21/2023
Signed off — Alteration
PROPOSED INTERIOR RENOVATION OF EXISTING DWELLING UNIT # 201 ON THE 2ND FLOOR INCLUDING CONSTRUCTION OF NON-LOAD BEARING INTERIOR PARTITIONS, PLASTER AND PAINT CEILINGS AND WALL. NO CHANGE TO BUILDING BULK, FLOOR AREA, EGRESS, USE OR OCCUPANCY.
Q00908438-I1
12/20/2023
Permit issued — Sidewalk Shed
Q00976357-I1-SH
12/18/2023
Filed — Alteration
Q00976357-I1
11/19/2023
Filed — Alteration
APPLICATION FILE TO EXTERIOR FACADE REPAIR AS BRICK POINTING AND BRICK CRACK REPAIR AT PARTIAL FRONT ELEVATION (QUEENS BLVDE. SIDE) AS PER PLAN. NO CHANGE IN SURE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00965039-I1
11/19/2023
Special inspection requirement — Tenant Protection Plan Compliance
FAZAL BANGASH
11/18/2023
Special inspection requirement — Final
FAZAL BANGASH
11/18/2023
Special inspection requirement — Masonry
FAZAL BANGASH
11/14/2023
Permit issued — General Construction
Q00487459-I1-GC
07/28/2023
Permit issued — General Construction
Q00908438-I1-GC
07/24/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF EXISTING DWELLING UNIT # 201 ON THE 2ND FLOOR INCLUDING CONSTRUCTION OF NON-LOAD BEARING INTERIOR PARTITIONS, PLASTER AND PAINT CEILINGS AND WALL. NO CHANGE TO BUILDING BULK, FLOOR AREA, EGRESS, USE OR OCCUPANCY.
Q00908438-I1
04/07/2023
Violation issued (HPD, closed)
I
04/03/2023
Violation issued (HPD, closed)
C
Latest 60 of 154 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MIDWOOD MANAGEMENT1007/08/2026
GLAZE DONUTS2407/08/2026
OWNER'S REP607/08/2026
ALL EMPIRE BUILDING CONTRACTORS507/08/2026
THE HOME SAVINGS BANK103/22/2026
TRIANGLE ASSOCIATES2303/22/2026
HOME SAVS BANK303/22/2026
60TH ST RESTAURANT403/21/2026
CHINA GARDEN203/21/2026
CAMMEBYS REALTY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SHEIKH EXPEDITING203/21/2026
Manetta architecture design pllc1403/21/2026
INDESIGN STUDIO403/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
EXPEDIA BUILDING SOLUTION103/21/2026
ASKON ARCHITECTS P C203/21/2026
THE GREEN STUDIO103/21/2026
HALF SQUARE203/21/2026
MILLENNIUM DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAVALRY LLCGeneral Contractor607/08/2026
TOMAK GROUP INCGeneral Contractor507/08/2026
GWT ENTERPRISES INCGeneral Contractor303/21/2026
MASTER TECH PLUMBING LLCPlumbing307/08/2026
LUNA NYC ELECTRIC CORPElectrical203/22/2026
NEPTUNE SIGNS AWNINGSScaffold207/08/2026
RICHARD NEUElectrical103/22/2026
AGL DEVELOPMENT LLCGeneral Contractor107/08/2026
A&L CONSTRUCTION SRVCSGeneral Contractor107/08/2026
ABDUL AZIZElectrical103/21/2026
AYAAN RESTORATION INCGeneral Contractor107/08/2026
LAMBO CONSTRUCTION, INCGeneral Contractor107/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor107/08/2026
PHOENIX NCR CORPGeneral Contractor104/09/2026
G.P. MECHANICAL CORPPlumbing107/08/2026
ALL EMPIRE BUILDING CONGeneral Contractor107/08/2026
AZIZ ABDULElectrical103/21/2026
HARARI DAVIDElectrical103/21/2026
HOWARD ZAMKOFFElectrical103/21/2026
MARK REYESElectrical103/21/2026
REYES, MARKElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STUDIO NYANDAK ARCHITECTU8378110/21/2024
BENDIX ENGINEERING, P.C.4293506/12/2024
CHANDA ENG. CONSULTANT PC6842102/06/2024
BANGASH ASSOCIATES INC8488111/19/2023
DJ ASSOCIATES ARCHITECT,2852107/24/2023
THE MTM DESIGN GROUP, LLC1319107/13/2022
KENDALL ENGINEERING PC4154204/20/2022
AR-TECH ENGINEERING, P.C.6659104/20/2022
M. INT'L ENGINEERING PLLC3129104/05/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offTOMAK GROUP12/24/2024
DOB NOWGeneral ConstructionPermit IssuedTOMAK GROUP10/14/2024
DOB NOWMechanical SystemsPermit IssuedTOMAK GROUP06/11/2024
DOB NOWPlumbingPermit IssuedG.P. MECHANICAL CORP06/05/2024
DOB NOWGeneral ConstructionSigned-offPHOENIX NCR CORP03/14/2024
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC01/08/2024
DOB NOWGeneral ConstructionSigned-offAYAAN RESTORATION INC12/26/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES12/20/2023
DOB NOWGeneral ConstructionPermit IssuedTOMAK GROUP11/14/2023
DOB NOWGeneral ConstructionSigned-offA&L CONSTRUCTION SRVCS07/28/2023
DOB NOWAntennaPermit IssuedAGL DEVELOPMENT LLC01/17/2023
DOB NOWPlumbingPermit IssuedMASTER TECH PLUMBING LLC11/21/2022
DOB NOWGeneral ConstructionPermit IssuedLAMBO CONSTRUCTION, INC08/10/2022
DOB NOWGeneral ConstructionPermit IssuedCAVALRY LLC06/10/2022
DOB NOWMechanical SystemsPermit IssuedCAVALRY LLC06/10/2022
DOB NOWPlumbingPermit IssuedMASTER TECH PLUMBING LLC10/29/2021
DOB NOWMechanical SystemsPermit IssuedCAVALRY LLC06/04/2021
DOB NOWSidewalk ShedSigned-offALL EMPIRE BUILDING CON06/01/2021
DOB NOWPlumbingPermit IssuedMASTER TECH PLUMBING LLC05/20/2021
DOB NOWGeneral ConstructionPermit IssuedCAVALRY LLC04/29/2021
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC01/19/2018
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC01/19/2018
BISOTISSUEDA&L CONSTRUCTION SRVCS11/27/2019
BISPLISSUEDACCESS PLUMBING CORP11/15/2018
BISOTISSUEDHONGTAI CONSTRUCTION INC06/11/2018
BISFPISSUEDNY FIRETECH INC02/08/2018
BISPLISSUEDZONE PLUMBING & HEATING C10/24/2017
BISMHISSUEDNOVA VASQUEZ & ASSOCIATES10/12/2017
BISEQISSUEDNOVA VASQUEZ & ASSOCIATES10/12/2017
BISPLISSUEDACCESS PLUMBING CORP09/29/2017
BISOTISSUEDSIGN MASTER USA INC09/21/2017
BISOTISSUEDA&L CONSTRUCTION SRVCS09/20/2017
BISOTISSUEDZ & Z CONSTRUCTION OF NY12/14/2015
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM07/15/2015
BISOTISSUEDZ & Z CONSTRUCTION OF NY07/02/2015
BISMHISSUEDGLOBAL GROUP INDUSTRIES C03/11/2015
BISEQISSUEDGLOBAL GROUP INDUSTRIES C03/11/2015
BISPLISSUEDSO PLUMBING & HEATING INC03/11/2015
BISOTISSUEDCONSTRUCTION EXPERT INC12/13/2013
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM02/12/2013
+ 32 more permits on file
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/30/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/21/2023Pass-Final Boiler Equipment InspectionPassView ↗
08/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
10/20/2024Tenant Protection Plan ComplianceTENZIN NYANDAKspecial
10/18/2024Structural Steel - DetailsTENZIN NYANDAKspecial
10/18/2024Structural Steel - High Strength BoltingTENZIN NYANDAKspecial
10/18/2024Structural Steel - WeldingTENZIN NYANDAKspecial
10/18/2024Structural Stability – Alterations of existing buildingsTENZIN NYANDAKspecial
10/18/2024FinalTENZIN NYANDAKprogress
06/28/2024Mechanical SystemsMatthew Bendixspecial
06/28/2024Energy Code Compliance InspectionsMatthew Bendixprogress
06/28/2024HVAC-R and service water piping design and insulationMatthew Bendixenergy_progress
06/28/2024HVAC-R and service water heating system controlsMatthew Bendixenergy_progress
06/28/2024HVAC-R and service water heating equipmentMatthew Bendixenergy_progress
06/28/2024Maintenance informationMatthew Bendixenergy_progress
06/28/2024FinalMatthew Bendixprogress
06/05/2024Mechanical SystemsMatthew Bendixspecial
06/05/2024HVAC-R and service water heating system controlsMatthew Bendixenergy_progress
06/05/2024HVAC-R and service water heating equipmentMatthew Bendixenergy_progress
06/05/2024Energy Code Compliance InspectionsMatthew Bendixprogress
06/05/2024FinalMatthew Bendixprogress
06/05/2024Maintenance informationMatthew Bendixenergy_progress
06/05/2024HVAC-R and service water piping design and insulationMatthew Bendixenergy_progress
02/03/2024Tenant Protection Plan ComplianceKARTIK CHANDAspecial
02/01/2024Fire-Resistance Rated ConstructionKARTIK CHANDAprogress
02/01/2024Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
11/19/2023Tenant Protection Plan ComplianceFAZAL BANGASHspecial
11/18/2023FinalFAZAL BANGASHprogress
Latest 25 of 50.
▾Documents — 404 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/29/2026Q00001517-I1Request digital key ↗
08/29/2026Q00009902-I1Request digital key ↗
08/28/2026Q00106683-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits73
▸BISPLAN / WORK APPROVAL APPLICATION34
11/17/2023421557185Open ↗
11/15/2023421557185Open ↗
03/23/2020421557185Open ↗
Showing 3 of 34 on file for this type
▸BISWORK PERMIT APPLICATION32
03/17/2020421592306Open ↗
12/04/2019421941867Open ↗
11/30/2018421247172Open ↗
Showing 3 of 32 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications6
07/24/2018421644778Open ↗
12/19/2017421348081Open ↗
10/05/2015440204681Open ↗
Showing 3 of 6 on file for this type
▸BISINTENT TO REVOKE APPROVAL/PERMIT1
04/18/2019421247172Open ↗
▸Seals & Professional Certifications103
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION28
12/30/2019421941867Open ↗
12/04/2019421941867Open ↗
02/11/2019421247172Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/27/2026Q00509119-I1Open ↗
08/26/2026Q00488058-I1Open ↗
08/26/2026Q00488058-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/29/2026Q00487459-I1Open ↗
09/29/2026Q00487459-I1Open ↗
09/29/2026Q00487459-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
12/04/2019421941867Open ↗
11/27/2018421247172Open ↗
06/22/2018421644778Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/29/2026Q00487459-I1Open ↗
09/29/2026Q00487459-I1Open ↗
09/02/2026Q00487459-P3Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
12/04/2019421941867Open ↗
11/27/2018421247172Open ↗
06/22/2018421644778Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
06/25/2015440229851Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
06/25/2015440229851Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment22
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
11/27/2018421247172Open ↗
12/15/2017421558255Open ↗
10/06/2017421558255Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
10/05/2015440204681Open ↗
09/29/2015440204681Open ↗
08/27/2015440204681Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
10/05/2015440204681Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS2
10/05/2015440204681Open ↗
Showing 1 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
01/23/2018421592306Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
10/05/2015440204681Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes7
03/23/2020421557185Open ↗
03/23/2020421592306Open ↗
12/04/2019421941867Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos29
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/26/2026Q00488058-P1Open ↗
08/26/2026Q00488058-I1Open ↗
08/26/2026Q00753156-P1Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
12/04/2019421941867Open ↗
11/27/2018421247172Open ↗
10/06/2017421558255Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance32
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS16
01/16/2020421941867Open ↗
01/13/2020421941867Open ↗
12/04/2019421941867Open ↗
Showing 3 of 16 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
12/30/2019421941867Open ↗
02/11/2019421247172Open ↗
07/24/2018421644778Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/11/2015440204681Open ↗
03/04/2015440204681Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
06/25/2015440229851Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
06/25/2015440229851Open ↗
03/11/2015440204681Open ↗
Showing 2 of 4 on file for this type
▸Approvals, Objections & Sign-offs42
▸BISLETTERS - SUPPORTING DOCUMENTATION16
02/06/2024421592306Open ↗
12/04/2019421941867Open ↗
04/18/2019421247172Open ↗
Showing 3 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
02/06/2024421592306Open ↗
01/16/2020421941867Open ↗
01/13/2020421941867Open ↗
Showing 3 of 15 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
08/06/2015421195780Open ↗
07/06/2015421169639Open ↗
Showing 2 of 10 on file for this type
▸BISFINAL1
02/05/2024421592306Open ↗
▸Cost, Insurance & Ownership31
▸BISCOST AFFIDAVIT27
01/16/2020421941867Open ↗
01/13/2020421941867Open ↗
12/04/2019421941867Open ↗
Showing 3 of 27 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST2
09/02/2015440229851Open ↗
03/11/2015440204681Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/05/2024421592306Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
12/04/2019421941867Open ↗
▸Filing & Intake Forms25
▸BISEFILING COVER SHEET17
12/04/2019421941867Open ↗
11/27/2018421247172Open ↗
06/22/2018421644778Open ↗
Showing 3 of 17 on file for this type
▸BISADDITIONAL INFORMATION4
03/23/2020421557185Open ↗
12/20/2017421558255Open ↗
09/10/2015440229851Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
06/25/2015440229851Open ↗
Showing 1 of 3 on file for this type
▸BISBOROUGH INTAKE FORM1
12/19/2017421348081Open ↗
▸Other Documents18
▸DOB NOWDHCR Document13
08/13/2026Q00487459-P3Open ↗
08/13/2026Q00487459-P3Open ↗
08/13/2026Q00487459-S1Open ↗
Showing 3 of 13 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
03/06/2015440204681Open ↗
Showing 1 of 2 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
03/06/2015440204681Open ↗
Showing 1 of 2 on file for this type
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type