← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
120 11TH AVENUE
MANHATTAN · BIN 1012292
💬 Discuss this project
1910Year Built
7Stories
RMBuilding Class
C6-3Zoning
40,203 sfGross Floor Area
12Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 8,875 sf lot · 4.53 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
PenthouseUnit PHA3p · 1 filing · 9 docs
Floor 5Unit 5B8p · 2 filings · 18 docs
Floor 4Unit 4A3p · 2 filings · 12 docs
Floor 3550w21 Owner LLC3p · 1 filing · 5 docs
Floor 2
Floor 1Installation of Heavy Duty Sidewalk Shed6p · 2 filings · 6 docs
Site & exteriorWeber-farhat Realty18p · 3 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Chandler Chicco Agency6703/21/2026
120 Eleventh Ave Retail1203/21/2026
Puissance1003/21/2026
120 11th Ave Condominium Associates803/21/2026
Weber-Farhat Realty604/09/2026
120 Eleventh Avenue Condo503/21/2026
Peace One Enterprise103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Carmen Lenzi Architect110/19/2026
New Age110/05/2026
Lesley Schmerzler110/22/2025
MSM Engineering Services104/07/2025
Studio Nyandak Architecture and Engineering110/17/2024
Asr Engineering209/23/2022
Richard Koenigsberg107/07/2021
Syed Engineering106/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediting303/21/2026
Municipal Building Consultants103/21/2026
Legion Investment Group103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Teamwork EnterprisesGeneral Contractor603/21/2026
AMS ContractorScaffold303/21/2026
KBRNYGeneral Contractor203/21/2026
Topline NYC ContractingScaffold207/08/2026
CM and Associates ConstructionGeneral Contractor104/09/2026
Andamio ScaffoldingScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Carmen Lenzi Architect5751110/19/2026
New Age Engineering7746110/05/2026
Domani Inspection Service843110/22/2025
Studio Nyandak Architectu8378110/17/2024
Koenigsberg Engineering2247107/07/2021
Building Lifecycle
All (104)Filed (9)Permit Issued (8)Signed Off (4)Facade (FISP) (6)Violation (60)Special Inspection (17)
10/19/2026
Filed — Alteration
REPLACE HVAC SYSTEM AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01466216-S1
10/05/2026
Filed — Alteration
REPLACE HVAC SYSTEM AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01466216-I1
09/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Stephen Shishko
09/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
09/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
09/29/2026
Special inspection requirement — Maintenance information
Stephen Shishko
09/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
09/27/2026
Special inspection requirement — Mechanical Systems
Stephen Shishko
09/27/2026
Special inspection requirement — Final
Stephen Shishko
03/30/2026
Signed off — Alteration
M01301144-I1
11/17/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01202705-I1
10/28/2025
Permit issued — General Construction
M01301144-I1-GC
10/22/2025
Filed — Alteration
M01301144-I1
04/07/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01202705-I1
04/07/2025
Permit issued — Supported Scaffold
M01202705-I1-SF
01/21/2025
Permit issued — General Construction
M01122310-I1-GC
10/17/2024
Filed — Alteration
M01122310-I1
10/11/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
TENZIN NYANDAK
10/11/2024
Special inspection requirement — Fenestration air leakage
TENZIN NYANDAK
10/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
TENZIN NYANDAK
10/04/2024
Special inspection requirement — Masonry
TENZIN NYANDAK
10/04/2024
Special inspection requirement — Final
TENZIN NYANDAK
10/04/2024
Special inspection requirement — Energy Code Compliance Inspections
TENZIN NYANDAK
02/21/2024
Cycle 9 facade report submitted
02/21/2024
Cycle 9 facade report signed — SAFE
02/21/2024
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
02/17/2024
Cycle 9 facade inspection completed
08/31/2023
Signed off — Alteration
M08008248-I1
12/08/2022
Signed off — Alteration
EXTERIOR RESTORATION PROJECT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00539379-I1
09/23/2022
Filed — Alteration
M08008248-I1
09/23/2022
Permit issued — Sidewalk Shed
M08008248-I1-SH
09/01/2022
Permit issued — Supported Scaffold
M07994697-I1-SF
08/31/2022
Filed — Alteration
M07994697-I1
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/27/2022
Permit issued — Structural
M00539379-I1-ST
01/27/2022
Permit issued — General Construction
M00539379-I1-GC
09/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/07/2021
Violation issued (ECB, closed)
Construction
07/07/2021
Filed — Alteration
EXTERIOR RESTORATION PROJECT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00539379-I1
07/02/2021
Violation issued (ECB, closed)
Construction
06/30/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00548819-I1
06/30/2021
Permit issued — Sidewalk Shed
M00548819-I1-SH
06/14/2021
Special inspection requirement — Final
RICHARD KOENIGSBERG
06/14/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD KOENIGSBERG
06/14/2021
Special inspection requirement — Post-installed Anchors
RICHARD KOENIGSBERG
06/14/2021
Special inspection requirement — Masonry
RICHARD KOENIGSBERG
04/01/2021
Violation issued (HPD, closed)
A
08/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2019
Cycle 8 facade report submitted
01/31/2019
Cycle 8 facade report signed — SWARMP
01/23/2019
Cycle 8 facade inspection completed
01/09/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/09/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/09/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/09/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/05/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/05/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offChristopher B. Mesbah10/28/2025
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding04/07/2025
DOB NOWGeneral ConstructionSigned-offKBRNY01/21/2025
DOB NOWSidewalk ShedSigned-offTopline NYC Contracting09/23/2022
DOB NOWSupported ScaffoldPermit IssuedTopline NYC Contracting09/01/2022
DOB NOWStructuralSigned-offTeamwork Enterprises01/27/2022
DOB NOWGeneral ConstructionSigned-offTeamwork Enterprises01/27/2022
DOB NOWSidewalk ShedPermit IssuedAMS Contractor06/30/2021
BISPLISSUEDTop Plumbing Group08/06/2018
BISPLISSUEDTop Plumbing Group08/06/2018
BISOTISSUED360 General Contracting I07/03/2018
BISMHISSUEDMele Contracting02/28/2018
BISOTISSUEDFine Finishes Construction10/24/2017
BISPLISSUEDTop Plumbing Group11/17/2016
BISSPISSUEDGo Pro Fire Protection09/13/2016
BISMHISSUED360 General Contracting I08/15/2016
BISOTISSUED360 General Contracting I06/22/2016
BISSPISSUEDBent Mechanical03/17/2016
BISPLISSUEDP.S.I. Mechanical02/26/2016
BISOTISSUEDFine Finishes Construction02/09/2016
BISOTISSUEDMele Contracting09/15/2015
BISPLISSUEDWhitestone Plumbing04/08/2015
BISOTISSUEDZoom Contracting03/19/2015
BISMHISSUEDZoom Contracting03/19/2015
BISOTISSUEDMele Contracting03/19/2015
BISMHISSUEDZoom Contracting12/04/2014
BISOTISSUEDZoom Contracting12/04/2014
BISMHISSUEDZoom Contracting07/30/2014
BISPLISSUEDFlint Mechanical07/29/2014
BISSPISSUEDFlint Mechanical07/29/2014
BISOTISSUEDZoom Contracting07/25/2014
BISPLISSUEDCode Mechanical10/16/2013
BISOTISSUEDKuang's USA Co02/15/2013
BISPLISSUEDMetro02/15/2013
BISOTISSUEDKuang's USA Co12/28/2012
BISPLISSUEDCode Mechanical09/10/2012
BISPLISSUEDPal-Mar Plumbing & Heating08/24/2012
BISOTISSUEDSlawek Construction08/23/2012
BISSPISSUEDDuo Plumbing & Heating08/06/2012
BISSPISSUEDDuo Plumbing & Heating08/06/2012
+ 18 more permits on file
1 project · most recent 10/19/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/19/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PVFY-P54NAMU-E1 60,000 BTU · Vrf Indoor ×2
PUHY-HP120YNU-A1 130,000 BTU · Vrf Outdoor ×1
Ventilation
Panasonic FV-0511VKS3S 110 CFM · Exhaust Fan ×1
5 projects · most recent 10/07/2025
General Wiring
FiledStatusContractorScope
10/07/2025CompleteAmsterdam Electric—
09/23/2022Permit IssuedRichard Neu—
05/13/2019Permit IssuedR.C.M. ElectricGeneral Wiring
11/15/2018CompleteAll Around ElectricGeneral Wiring
09/26/2018CompleteAll Around ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
09/29/2026Energy Code Compliance InspectionsStephen Shishkoprogress
09/29/2026Fire-Resistant Penetrations and JointsStephen Shishkospecial
09/29/2026HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
09/29/2026Maintenance informationStephen Shishkoenergy_progress
09/29/2026HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
09/27/2026Mechanical SystemsStephen Shishkospecial
09/27/2026FinalStephen Shishkoprogress
10/11/2024Fenestration and door U-factor and product ratingsTENZIN NYANDAKenergy_progress
10/11/2024Fenestration air leakageTENZIN NYANDAKenergy_progress
10/04/2024Fire-Resistant Penetrations and JointsTENZIN NYANDAKspecial
10/04/2024MasonryTENZIN NYANDAKspecial
10/04/2024FinalTENZIN NYANDAKprogress
10/04/2024Energy Code Compliance InspectionsTENZIN NYANDAKprogress
06/14/2021FinalRICHARD KOENIGSBERGprogress
06/14/2021Structural Stability – Alterations of existing buildingsRICHARD KOENIGSBERGspecial
06/14/2021Post-installed AnchorsRICHARD KOENIGSBERGspecial
06/14/2021MasonryRICHARD KOENIGSBERGspecial
▾Documents — 691 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
10/06/2026M01466216-I1Request digital key ↗
09/03/2026M00548819-I1Request digital key ↗
09/03/2026M00539379-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits147
▸BISPLAN / WORK APPROVAL APPLICATION87
09/17/2019123657186Open ↗
07/22/2019123657186Open ↗
03/28/2019123477264Open ↗
Showing 3 of 87 on file for this type
▸BISWORK PERMIT APPLICATION55
11/20/2018123405813Open ↗
08/07/2018123477264Open ↗
08/07/2018123368612Open ↗
Showing 3 of 55 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit2
08/13/2026M01122310-I1Open ↗
08/13/2026M01301144-I1Open ↗
▸Seals & Professional Certifications135
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION70
01/14/2019123405813Open ↗
01/03/2019123368612Open ↗
11/30/2018123405813Open ↗
Showing 3 of 70 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST18
11/14/2018123405813Open ↗
08/07/2018123477264Open ↗
06/26/2018123368612Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
11/14/2018123405813Open ↗
08/07/2018123477264Open ↗
06/26/2018123368612Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
10/20/2026M01466216-S1Open ↗
10/06/2026M01466216-I1Open ↗
09/01/2026M08008248-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
10/06/2026M01466216-I1Open ↗
10/06/2026M01466216-I1Open ↗
08/25/2026M00539379-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
10/06/2026M01466216-I1Open ↗
08/25/2026M00539379-I1Open ↗
08/25/2026M00539379-I1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/12/2016140528178Open ↗
07/25/2016140526223Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/12/2016140528178Open ↗
07/25/2016140526223Open ↗
▸Trade Schedules & Equipment87
▸BISSCHEDULE B - PLUMBING43
07/25/2016140526223Open ↗
Showing 1 of 43 on file for this type
▸BISSELF-CERT PLUMBING NOTICE24
10/16/2015122271326Open ↗
Showing 1 of 24 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
11/14/2018123405813Open ↗
08/07/2018123477264Open ↗
06/26/2018123368612Open ↗
Showing 3 of 13 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
02/24/2025123657186Open ↗
Showing 1 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
08/22/2016140526223Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
02/08/2018121359804Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
02/08/2018121359804Open ↗
▸Safety & Tenant Protection28
▸DOB NOWHPD-1: Anti-Harassment Area Checklist8
10/20/2026M01466216-S1Open ↗
10/06/2026M01466216-I1Open ↗
08/13/2026M00548819-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTenant Protection Plan and Notes6
11/14/2018123405813Open ↗
08/07/2018123477264Open ↗
06/26/2018123368612Open ↗
Showing 3 of 6 on file for this type
▸BISHPD-1 - Anti-Harassment Area Checklist5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSTREET TREE CHECKLIST3
10/31/2018102537364Open ↗
08/30/2018102537364Open ↗
Showing 2 of 3 on file for this type
▸BISHPD-2 - Clinton Special district Anti-Harassment Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISANTI-HARASSMENT CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCertificate of No Harassment2
08/13/2026M01122310-I1Open ↗
08/13/2026M01301144-I1Open ↗
▸Environmental & Asbestos41
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
08/07/2018123477264Open ↗
06/26/2018123368612Open ↗
08/12/2016140528178Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
10/20/2026M01466216-S1Open ↗
10/06/2026M01466216-I1Open ↗
08/26/2026M01122310-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice to Proceed2
08/13/2026M00539379-I1Open ↗
08/13/2026M01122310-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
06/26/2018123368612Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026M00539379-I1Open ↗
▸Energy Compliance48
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS26
01/03/2019123368612Open ↗
10/12/2018122271326Open ↗
06/26/2018123368612Open ↗
Showing 3 of 26 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS17
01/03/2019123368612Open ↗
10/12/2018122271326Open ↗
05/16/2018122770634Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/12/2016140528178Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/12/2016140528178Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/12/2016140528178Open ↗
07/25/2016140526223Open ↗
▸Approvals, Objections & Sign-offs70
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST31
01/14/2019123405813Open ↗
01/03/2019123368612Open ↗
12/28/2018102537364Open ↗
Showing 3 of 31 on file for this type
▸BISADMINISTRATIVE OBJECTIONS20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
05/16/2018122770634Open ↗
05/19/2017140526223Open ↗
03/29/2017140528178Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
10/31/2018102537364Open ↗
10/30/2018102537364Open ↗
▸BISLANDMARKS APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
11/09/2017122770634Open ↗
▸Cost, Insurance & Ownership56
▸BISCOST AFFIDAVIT56
01/18/2019123657186Open ↗
01/14/2019123405813Open ↗
01/03/2019123368612Open ↗
Showing 3 of 56 on file for this type
▸Filing & Intake Forms65
▸BISEFILING COVER SHEET26
01/18/2019123657186Open ↗
11/14/2018123405813Open ↗
08/07/2018123477264Open ↗
Showing 3 of 26 on file for this type
▸BISADDITIONAL INFORMATION18
09/20/2017122770634Open ↗
01/03/2017140528178Open ↗
01/03/2017140526223Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM17
03/28/2019123477264Open ↗
02/26/2019123477264Open ↗
02/12/2019123477264Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
08/12/2016140528178Open ↗
07/25/2016140526223Open ↗
Showing 2 of 4 on file for this type
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
10/21/2016122622894Open ↗