← Back
Two family brick
120-14 91 AVENUE
QUEENS · BIN 4196696
💬 Discuss this project
1901Year Built
2Stories
B1Building Class
R4AZoning
1,908 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family brick · 1,890 sf lot · 1.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Cellar4p · 1 filing · 14 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RISE ARCHITECTURE310/09/2025
ARQUITECTURA VARELA209/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JACK JAFFA & ASSOCIATES303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLUEROCK DEVELOPMENT & COGeneral Contractor104/09/2026
B&B MECH PLBG & HTG LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIZ DESIGNS LLC6312310/09/2025
BUTTERFIELD & O'CONNOR4189209/20/2021
Building Lifecycle
All (14)Filed (5)Permit Issued (2)Signed Off (2)Violation (4)Inspection (1)
12/05/2025
Signed off — Alteration
Interior renovation at cellar to resolve violation as per plans filed herewith.
Q01148869-S1
11/18/2025
Signed off — Alteration
Interior renovation at cellar to resolve violation as per plans filed herewith.
Q01148869-I1
11/18/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/27/2025
Permit issued — Plumbing
Q01148869-S1-PL
10/09/2025
Filed — Alteration
Interior renovation at cellar to resolve violation as per plans filed herewith.
Q01148869-S1
09/12/2025
Permit issued — General Construction
Q01148869-I1-GC
05/27/2025
Filed — Alteration
Interior renovation at cellar to resolve violation as per plans filed herewith.
Q01148869-P1
04/03/2025
Filed — Alteration
Interior renovation at cellar to resolve violation as per plans filed herewith.
Q01148869-I1
07/02/2024
Violation issued (ECB, closed)
Construction
07/02/2024
Violation issued (ECB, open)
Construction
09/20/2021
Filed — Alteration
HEREWITH FILING FOR REMOVAL OF ALL ILLEGAL PARTITIONS AND LEGALIZATION OF 3-PC BATHROOM @ CELLAR LEVEL. INTERIOR RENOVATION @ 2ND FLOOR TO INCLUDE REPLACEMENT OF FLOOR FINISHES AND SHEET-ROCK THROUGH OUT AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY
Q00585523-I1
09/20/2021
Filed — Alteration
Q00577854-I1
08/02/2021
Violation issued (ECB, closed)
Construction
08/02/2021
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC10/27/2025
DOB NOWGeneral ConstructionSigned-offBLUEROCK DEVELOPMENT & CO09/12/2025
1 project · most recent 09/20/2021
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/20/2021——Ventilation Systems
Ventilation
Broan 688 50 CFM · Exhaust Fan ×1
1 project · most recent 09/20/2021
Gas Water/Sanitary
FiledStatusContractorScope
09/20/2021——Gas, Water/Sanitary
1 project · most recent 08/14/2026
General Wiring
FiledStatusContractorScope
08/14/2026Permit IssuedWATTS UP ELECTRIC NY LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
09/22/2025Fire-Resistant Penetrations and JointsJeff Akermanspecial
05/27/2025Fire-Resistant Penetrations and JointsJeff Akermanspecial
05/27/2025FinalJeff Akermanprogress
05/27/2025Fire-Resistance Rated ConstructionJeff Akermanprogress
05/01/2025Fire-Resistance Rated ConstructionJeff Akermanprogress
05/01/2025Fire-Resistant Penetrations and JointsJeff Akermanspecial
05/01/2025FinalJeff Akermanprogress
08/17/2021FinalVicente Varelaprogress
08/17/2021Ventilation and air distribution systemBRIAN T. O'CONNORenergy_progress
08/17/2021Fire-Resistant Penetrations and JointsBRIAN T. O'CONNORspecial
08/17/2021Mechanical SystemsBRIAN T. O'CONNORspecial
08/17/2021Energy Code Compliance InspectionsVicente Varelaprogress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/18/2026Q01148869-S1Request digital key ↗
08/18/2026Q01148869-I1Request digital key ↗
08/15/2026Q00585523-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWRestrictive Declaration/Easement 15
08/13/2026Q00577854-I1Open ↗
08/13/2026Q01148869-S1Open ↗
08/13/2026Q01148869-I1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026Q00577854-I1Open ↗
08/28/2026Q00577854-I1Open ↗
08/26/2026Q01148869-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026Q00577854-I1Open ↗
08/28/2026Q00577854-I1Open ↗
08/26/2026Q01148869-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/18/2026Q01148869-S1Open ↗
08/18/2026Q01148869-I1Open ↗
08/13/2026Q00585523-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/18/2026Q01148869-I1Open ↗
08/18/2026Q01148869-S1Open ↗
08/13/2026Q00577854-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00577854-I1Open ↗