Two family converted from one family
120-17 142 PLACE
QUEENS · Baisley Park · BIN 4261282
💬 Discuss this project
1915Year Built
2.75Stories
B3Building Class
R3AZoning
2,398 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Two family converted from one family · 4,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
Architecture
Floor 25p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar6p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/28/2022$1.3M—— → —$523/sf building
08/18/2021$425K—Private party → 12017 142 CORP.$177/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN502/22/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORELL BUILDERS INCGeneral Contractor407/08/2026
DOUG'S PLBG & HTG SERV COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781402/22/2022
TRIANGLE INSPECTION & TES7495202/22/2022
Building Lifecycle
All (52)Filed (5)Permit Issued (3)Signed Off (2)Violation (2)Inspection (6)Objection (4)Special Inspection (30)
12/28/2023
Violation issued (ECB, open)
Construction
10/05/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/07/2022
Signed off — Alteration
installation of new gas fired equipment,and plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling. Filed in conjunction with ALT I app#Q00559133-I1
Q00631663-I1
03/24/2022
Signed off — Alteration
Installation of a temporary construction fence,filed in conjunction with ALT CO app.# Q00559133.
Q00577923-I1
03/04/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/22/2022
Filed — Alteration CO
Existing one family dwelling to be horizontally enlarged and converted into a two family dwellings. New drywall partitions ,and plumbing fixtures as per plans.
Q00559133-P1
02/22/2022
Filed — Alteration
installation of new gas fired equipment,and plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling. Filed in conjunction with ALT I app#Q00559133-I1
Q00631663-P1
02/22/2022
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
02/22/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Final
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Footing and Foundation
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Structural Wood Frame
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Shutoff dampers
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
02/22/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
02/22/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
12/10/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/10/2021
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/10/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/10/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/10/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/27/2021
Permit issued — Plumbing
Q00631663-I1-PL
11/17/2021
Filed — Alteration
installation of new gas fired equipment,and plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling. Filed in conjunction with ALT I app#Q00559133-I1
Q00631663-I1
10/07/2021
Permit issued — General Construction
Q00559133-I1-GC-CX
09/27/2021
Objection resolved — Addressed
09/27/2021
Objection resolved — Addressed
09/15/2021
Objection raised — Block/lot missing from Topogra
09/15/2021
Objection raised — 2014-AN BC 501.3-Fire Code-14A
09/11/2021
Filed — Alteration CO
Existing one family dwelling to be horizontally enlarged and converted into a two family dwellings. New drywall partitions ,and plumbing fixtures as per plans.
Q00559133-I1
08/23/2021
Permit issued — Construction Fence
Q00577923-I1-FN
08/18/2021
Filed — Alteration
Installation of a temporary construction fence,filed in conjunction with ALT CO app.# Q00559133.
Q00577923-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDOUG'S PLBG & HTG SERV CO11/27/2021
DOB NOWGeneral ConstructionPermit IssuedMORELL BUILDERS INC10/07/2021
DOB NOWConstruction FenceSigned-offMORELL BUILDERS INC08/23/2021
1 project · most recent 02/22/2022
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
02/22/2022Permit IssuedMORELL BUILDERS INCAir Conditioning Systems, Heating Systems
Cooling
Carrier 48KCEA060A2A5 58,500 BTU · Furnace ×10
Heating
Carrier 48KCEA060A2A5 65,000 BTU · Furnace ×10
1 project · most recent 08/30/2021
General Wiring
FiledStatusContractorScope
08/30/2021CompleteWCK ELECTRIC CORP.General Wiring
1 project · most recent 02/22/2022
Concrete Wood
FiledStatusContractorScope
02/22/2022Permit IssuedMORELL BUILDERS INCConcrete, Wood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/04/2022Pass-Final CND-Occupancy InspectionPassView ↗
12/10/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/10/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/10/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/10/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/10/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
02/22/2022Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
02/22/2022Excavations - Sheeting, Shoring, and BracingCHRISTIAN LOZADAspecial
02/22/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
02/22/2022Mechanical SystemsCHRISTIAN LOZADAspecial
02/22/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
02/22/2022Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
02/22/2022Subgrade InspectionsCHRISTIAN LOZADAspecial
02/22/2022Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
02/22/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
02/22/2022FinalCHRISTIAN LOZADAprogress
02/22/2022Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
02/22/2022Footing and FoundationCHRISTIAN LOZADAprogress
02/22/2022Structural Wood FrameCHRISTIAN LOZADAprogress
02/22/2022Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
02/22/2022Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
02/22/2022HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
02/22/2022Fenestration air leakageCHRISTIAN LOZADAenergy_progress
02/22/2022Fenestration areasCHRISTIAN LOZADAenergy_progress
02/22/2022HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
02/22/2022HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
02/22/2022Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
02/22/2022Interior lighting powerCHRISTIAN LOZADAenergy_progress
02/22/2022Shutoff dampersCHRISTIAN LOZADAenergy_progress
02/22/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
02/22/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
Latest 25 of 41.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026Q00577923-I1Request digital key ↗
08/27/2026Q00631663-I1Request digital key ↗
08/27/2026Q00631663-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026Q00559133-I1Open ↗
08/13/2026Q00559133-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026Q00559133-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature9
09/19/2026Q00631663-I1Open ↗
09/19/2026Q00631663-I1Open ↗
08/28/2026Q00577923-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/19/2026Q00631663-I1Open ↗
09/19/2026Q00631663-I1Open ↗
08/24/2026Q00631663-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00631663-P1Open ↗
08/27/2026Q00631663-I1Open ↗
08/26/2026Q00559133-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/26/2026Q00559133-P1Open ↗
08/15/2026Q00559133-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026Q00559133-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/15/2026Q00559133-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026Q00559133-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026Q00631663-P1Open ↗
08/27/2026Q00631663-I1Open ↗
08/26/2026Q00559133-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00631663-I1Open ↗
08/15/2026Q00559133-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/15/2026Q00559133-I1Open ↗
08/13/2026Q00559133-P1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/15/2026Q00559133-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026Q00559133-I1Open ↗
▸Other Documents5
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026Q00559133-I1Open ↗
08/13/2026Q00559133-P1Open ↗
▸DOB NOWPlot Diagram2
08/15/2026Q00559133-I1Open ↗
08/13/2026Q00559133-P1Open ↗
▸DOB NOWFinal Survey1
08/15/2026Q00559133-I1Open ↗