Elevator apt, fireproof without stores
Wyckoff Gardens (NYCHA)
120 3 AVENUE · BIN 3336055
💬 Discuss this project
1965Year Built
21Stories
D3Building Class
R6Zoning
509,151 sfGross Floor Area
709Units
LL97 Covered11 Open Violations ▸FISP: UNSAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 243,000 sf lot · 2.1 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof3p · 2 filings · 20 docs
Floor 212p · 1 filing · 20 docs
Floor 202p · 1 filing · 20 docs
Floor 192p · 1 filing · 20 docs
Floor 183p · 1 filing · 20 docs
Floor 173p · 1 filing · 20 docs
Floor 163p · 1 filing · 20 docs
Floor 153p · 1 filing · 20 docs
Floor 142p · 1 filing · 20 docs
Floor 132p · 1 filing · 20 docs
Floor 122p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Floor 102p · 1 filing · 20 docs
Floor 92p · 1 filing · 20 docs
Floor 82p · 1 filing · 20 docs
Floor 72p · 1 filing · 20 docs
Floor 62p · 1 filing · 20 docs
Floor 52p · 1 filing · 20 docs
Floor 42p · 1 filing · 20 docs
Floor 32p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA2809/07/2026
NEW YORK CITY HOUSING AUTHORITY403/22/2026
NYCHA-HOUSING AUTHORITY 9103/22/2026
NYC HOUSING AUTHORITY2003/22/2026
R.S.N. CONSTRUCTION CO IN103/22/2026
NYCHA 99403/22/2026
FRANCISCAN CONSTRUCTION103/21/2026
TECHNICO CONST SERVICES103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
QUEENS ENGINEERING308/18/2025
MAGNUSSON ARCHITECTURE AND PLANNING208/13/2025
LAKHANI & JORDAN207/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ASSOCIATES LLC403/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
TAREK M ZEID P E403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROMA SCAFFOLDING INCGeneral Contractor409/07/2026
TECHNICO CONSTRUCTIONGeneral Contractor203/21/2026
CASTILLO JR, JORGEElectrical103/21/2026
CHRYSSIADIS, NICOLASElectrical103/21/2026
CPH PIPELINE OF N Y INCElectrical103/21/2026
C SCHLOSBERG INCElectrical103/21/2026
FORD, GUYElectrical103/21/2026
GAMBINO, FERDINANDElectrical103/21/2026
GUY FORDElectrical103/21/2026
INGLESE, PASQUALEElectrical103/21/2026
JEFFREY, DARRINElectrical103/21/2026
ABE HIMELFARBElectrical103/21/2026
LAMPIRIS, DElectrical103/21/2026
LINES, EDWARDElectrical103/21/2026
MATHURA, MACLEANElectrical103/21/2026
MIRINO, MICHAELElectrical103/21/2026
ORTEGA-CEDENO, DAVIDElectrical103/21/2026
WRUBEL, CHAIMElectrical103/21/2026
CORTEZ NIEVES JEANGeneral Contractor103/21/2026
MEGA TECHNICO, JV INCGeneral Contractor104/09/2026
STRUCTUAL PRESV SYSTEMGeneral Contractor103/21/2026
KRSLOVIC, ANTEElectrical103/21/2026
BOILERMAKER LOCAL 5Electrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HUDSON PEAKS CONSULTING L8381408/13/2025
Building Lifecycle
All (98)Filed (8)Permit Issued (7)Signed Off (1)Facade (FISP) (17)Violation (34)Inspection (3)Special Inspection (28)
08/11/2026
Permit issued — Sidewalk Shed
B01267022-I1-SH
08/11/2026
Permit issued — Construction Fence
B01267026-I1-FN
04/30/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
B01180583-I1
04/30/2026
Permit issued — Suspended Scaffold
B01180583-I1-SC
02/19/2026
Permit issued — Construction Fence
B01273134-I1-FN
08/26/2025
Cycle 10 facade report signed — UNSAFE
08/19/2025
Permit issued — Construction Fence
B01273134-I1-FN
08/19/2025
Cycle 10 facade inspection completed
08/18/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION CHAIN LINK FENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01273134-I1
08/13/2025
Filed — Alteration
NYCHA/Wyckoff/ Bldg# 2- Proposed Plumbing to replace for all apts kitchen/bath fixtures, Replace kitchen waste risers & DHW riser shut-offs & Install fixture/riser leak detection. All as per plans filed herewith
B01230128-S1
08/12/2025
Special inspection requirement — Post-installed Anchors
GIORGI KHARDZEISHVILI
08/07/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION CHAIN LINK FENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01267026-I1
08/07/2025
Permit issued — Construction Fence
B01267026-I1-FN
08/07/2025
Permit issued — Sidewalk Shed
B01267022-I1-SH
08/06/2025
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01267022-I1
07/30/2025
Filed — Alteration
NYCHA/Wyckoff/ Bldg# 2- Proposed Plumbing to replace for all apts kitchen/bath fixtures, Replace kitchen waste risers & DHW riser shut-offs & Install fixture/riser leak detection. All as per plans filed herewith
B01230128-S3
07/29/2025
Filed — Alteration
NYCHA/Wyckoff/ Bldg# 2- Proposed Plumbing to replace for all apts kitchen/bath fixtures, Replace kitchen waste risers & DHW riser shut-offs & Install fixture/riser leak detection. All as per plans filed herewith
B01230128-S2
07/15/2025
Filed — Alteration
NYCHA/Wyckoff/ Bldg# 2- Proposed Plumbing to replace for all apts kitchen/bath fixtures, Replace kitchen waste risers & DHW riser shut-offs & Install fixture/riser leak detection. All as per plans filed herewith
B01230128-I1
07/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIORGI KHARDZEISHVILI
07/11/2025
Special inspection requirement — Post-installed Anchors
GIORGI KHARDZEISHVILI
07/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIORGI KHARDZEISHVILI
07/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
GIORGI KHARDZEISHVILI
07/11/2025
Special inspection requirement — Energy Code Compliance Inspections
GIORGI KHARDZEISHVILI
07/09/2025
Special inspection requirement — Energy Code Compliance Inspections
GIORGI KHARDZEISHVILI
07/07/2025
Special inspection requirement — Post-installed Anchors
GIORGI KHARDZEISHVILI
07/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
GIORGI KHARDZEISHVILI
07/07/2025
Special inspection requirement — Final
GIORGI KHARDZEISHVILI
07/07/2025
Special inspection requirement — Exterior lighting power
GIORGI KHARDZEISHVILI
07/07/2025
Special inspection requirement — Insulation placement and R values
GIORGI KHARDZEISHVILI
07/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
GIORGI KHARDZEISHVILI
07/07/2025
Special inspection requirement — Maintenance information
GIORGI KHARDZEISHVILI
07/07/2025
Special inspection requirement — Fenestration areas
GIORGI KHARDZEISHVILI
07/07/2025
Special inspection requirement — Lighting in dwelling units
GIORGI KHARDZEISHVILI
07/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIORGI KHARDZEISHVILI
07/07/2025
Special inspection requirement — Lighting controls
GIORGI KHARDZEISHVILI
07/07/2025
Special inspection requirement — Air barrier - visual inspection
GIORGI KHARDZEISHVILI
07/07/2025
Special inspection requirement — Fenestration air leakage
GIORGI KHARDZEISHVILI
07/07/2025
Special inspection requirement — Interior lighting power
GIORGI KHARDZEISHVILI
07/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
GIORGI KHARDZEISHVILI
07/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
GIORGI KHARDZEISHVILI
07/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
GIORGI KHARDZEISHVILI
06/30/2025
Special inspection requirement — Structural Cold-Formed Steel
GIORGI KHARDZEISHVILI
06/13/2025
Special inspection requirement — Final
GIORGI KHARDZEISHVILI
06/13/2025
Special inspection requirement — Mechanical Systems
GIORGI KHARDZEISHVILI
06/13/2025
Special inspection requirement — Final
GIORGI KHARDZEISHVILI
06/03/2025
Cycle 10 facade report submitted
05/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/10/2025
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
B01180583-I1
01/24/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/22/2023
Violation issued (FDNY_NOV, closed)
12/02/2022
Violation issued (ECB, closed)
Local Law
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/12/2019
Violation issued (ECB, closed)
Boilers
08/12/2019
Violation issued (ECB, closed)
Boilers
07/21/2016
Cycle 7 facade report submitted
07/21/2016
Cycle 6 facade report submitted
07/21/2016
Cycle 8 facade report submitted
07/21/2016
Cycle 8 facade report submitted
07/15/2016
Cycle 8 facade report signed — SAFE
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedROMA SCAFFOLDING INC08/11/2026
DOB NOWConstruction FencePermit IssuedROMA SCAFFOLDING INC08/11/2026
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM04/30/2026
DOB NOWConstruction FencePermit IssuedMEGA TECHNICO, JV INC02/19/2026
DOB NOWConstruction FencePermit IssuedTECHNICO CONSTRUCTION08/19/2025
DOB NOWConstruction FencePermit IssuedROMA SCAFFOLDING INC08/07/2025
DOB NOWSidewalk ShedPermit IssuedROMA SCAFFOLDING INC08/07/2025
BISEQISSUEDR.S.N. CONSTRUCTION CO IN05/27/2016
BISOTISSUEDR.S.N. CONSTRUCTION CO IN05/16/2016
BISOTISSUEDR.S.N. CONSTRUCTION CO IN03/29/2016
BISEQISSUEDR.S.N. CONSTRUCTION CO IN03/14/2016
BISEQISSUEDR.S.N. CONSTRUCTION CO IN06/05/2015
BISOTISSUEDR.S.N. CONSTRUCTION CO IN06/02/2015
BISEQISSUEDR.S.N. CONSTRUCTION CO IN03/12/2015
BISEQISSUEDSKYWORX CONTRACTING INC03/12/2015
BISEQISSUEDVIKRANT CONTRACTING & BUILDER05/22/2014
BISEQISSUEDTECHNICO CONSTRUCTION02/21/2014
BISEQISSUEDTECHNICO CONSTRUCTION02/22/2013
BISEQISSUEDTECHNICO CONSTRUCTION03/01/2012
BISEQISSUEDTECHNICO CONSTRUCTION05/18/2011
BISEQISSUEDAKRO GENERAL CONTR. INC03/25/2010
BISEQISSUEDAKRO GENERAL CONTR. INC10/28/2009
BISEQISSUEDMBR CONTRACTING INC10/09/2009
BISOTISSUEDV.C. VITANZA SONS INC09/14/2005
BISPLISSUEDV. C. VITANZA SONS INC09/14/2005
BISPLISSUEDA.M.K CONTRACTING CORP04/18/2002
BISOTISSUEDA.M.K. CONTRACTING CORP03/22/2002
BISPLISSUEDA M K CONTRACTING COORP06/14/2001
BISPLISSUEDG.C.J. CONSTRUCTION INC.05/10/2001
BISOTISSUEDGCJ CONSTRUCTION INC.05/09/2001
BISOTISSUEDGCJ CONSTRUCTION INC.05/10/2000
BISOTISSUEDWDF INC02/18/2000
BISPLISSUEDWDF INC02/18/2000
BISPLISSUEDALASIA CO JV10/26/1999
BISOTISSUEDALASIA CO JV10/13/1999
BISPLISSUEDGCJ CONSTRUCTION INC.08/02/1999
BISOTISSUEDGCJ CONSTRUCTION INC.08/02/1999
BISOTISSUEDDOUGLAS SIMMONS/A/L/ EASTMOND05/20/1999
BISPLISSUEDGBE CONSTRACT CORP08/28/1998
BISOTISSUEDGBE CONSTRACT CORP08/28/1998
+ 5 more permits on file
1 project · most recent 08/13/2025
Water/Sanitary
FiledStatusContractorScope
08/13/2025——Water/Sanitary
7 projects · most recent 07/02/2025
General Wiring Boiler Controls
FiledStatusContractorScope
07/02/2025Permit IssuedAUJLA ELECTRIC CORP—
03/22/2024CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
09/06/2023CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
07/07/2022CompleteEIA ELECTRIC, INCGeneral Wiring
06/19/2022CompleteEIA ELECTRIC, INCGeneral Wiring
11/13/2019Permit IssuedN.Y.C. HOUSING AUTHORITYBoiler Controls
04/22/2019Permit IssuedN.Y.C. HOUSING AUTHORITYBoiler Controls
3 projects · most recent 08/18/2025
Fence Sidewalk Shed
FiledStatusContractorScope
08/18/2025Permit IssuedMEGA TECHNICO, JV INCFence
08/07/2025Permit IssuedROMA SCAFFOLDING INCFence
08/06/2025Permit IssuedROMA SCAFFOLDING INCSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/24/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/12/2025Post-installed AnchorsGIORGI KHARDZEISHVILIspecial
07/11/2025Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
07/11/2025Post-installed AnchorsGIORGI KHARDZEISHVILIspecial
07/11/2025Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
07/11/2025Tenant Protection Plan ComplianceGIORGI KHARDZEISHVILIspecial
07/11/2025Energy Code Compliance InspectionsGIORGI KHARDZEISHVILIprogress
07/09/2025Energy Code Compliance InspectionsGIORGI KHARDZEISHVILIprogress
07/07/2025Post-installed AnchorsGIORGI KHARDZEISHVILIspecial
07/07/2025Fire-Resistance Rated ConstructionGIORGI KHARDZEISHVILIprogress
07/07/2025FinalGIORGI KHARDZEISHVILIprogress
07/07/2025Exterior lighting powerGIORGI KHARDZEISHVILIenergy_progress
07/07/2025Insulation placement and R valuesGIORGI KHARDZEISHVILIenergy_progress
07/07/2025Fenestration and door U-factor and product ratingsGIORGI KHARDZEISHVILIenergy_progress
07/07/2025Maintenance informationGIORGI KHARDZEISHVILIenergy_progress
07/07/2025Fenestration areasGIORGI KHARDZEISHVILIenergy_progress
07/07/2025Lighting in dwelling unitsGIORGI KHARDZEISHVILIenergy_progress
07/07/2025Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
07/07/2025Lighting controlsGIORGI KHARDZEISHVILIenergy_progress
07/07/2025Air barrier - visual inspectionGIORGI KHARDZEISHVILIenergy_progress
07/07/2025Fenestration air leakageGIORGI KHARDZEISHVILIenergy_progress
07/07/2025Interior lighting powerGIORGI KHARDZEISHVILIenergy_progress
07/03/2025Tenant Protection Plan ComplianceGIORGI KHARDZEISHVILIspecial
07/01/2025Tenant Protection Plan ComplianceGIORGI KHARDZEISHVILIspecial
07/01/2025Tenant Protection Plan ComplianceGIORGI KHARDZEISHVILIspecial
06/30/2025Structural Cold-Formed SteelGIORGI KHARDZEISHVILIspecial
Latest 25 of 28.
▾Documents — 147 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/22/2026B01180583-I1Request digital key ↗
08/21/2026B01230128-I1Request digital key ↗
08/21/2026B01230128-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits23
▸BISWORK PERMIT APPLICATION14
06/14/2016340238442Open ↗
03/19/2016340232625Open ↗
06/12/2015340238442Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
03/21/2017340129006Open ↗
03/11/2015340232625Open ↗
03/11/2015340238442Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications47
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
05/18/2017340129006Open ↗
03/22/2017340129006Open ↗
03/22/2017340129006Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026B01267022-I1Open ↗
08/13/2026B01230128-S3Open ↗
08/13/2026B01230128-S2Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
07/10/2014320924354Open ↗
05/19/2011320310356Open ↗
03/25/2010320140833Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B01230128-S1Open ↗
08/28/2026B01230128-S3Open ↗
08/26/2026B01230128-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
05/19/2011320310356Open ↗
03/25/2010320140833Open ↗
10/08/2009320077778Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01230128-S1Open ↗
08/28/2026B01230128-S3Open ↗
08/26/2026B01230128-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
03/11/2015340232625Open ↗
03/11/2015340238442Open ↗
04/07/2014340129006Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/11/2015340232625Open ↗
03/11/2015340238442Open ↗
04/07/2014340129006Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
03/11/2015340232625Open ↗
03/11/2015340238442Open ↗
04/07/2014340129006Open ↗
▸Environmental & Asbestos8
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
05/19/2011320310356Open ↗
10/08/2009320077778Open ↗
09/25/2009320075397Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
03/22/2017340129006Open ↗
03/22/2017340129006Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/25/2010320140833Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
04/07/2014340129006Open ↗
▸BISDEP ASBESTOS PROJECT CONDITIONAL COMPLETION FORM1
06/02/2015340129006Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/07/2014340129006Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/22/2017340129006Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/22/2017340129006Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/07/2014340129006Open ↗
▸BISNYCECC ANALYSIS1
04/07/2014340129006Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/11/2015340232625Open ↗
03/11/2015340238442Open ↗
04/07/2014340129006Open ↗
▸Approvals, Objections & Sign-offs41
▸BISLETTERS - SUPPORTING DOCUMENTATION8
03/22/2017340129006Open ↗
02/25/2014320310356Open ↗
02/25/2014320310356Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
05/18/2017340129006Open ↗
05/18/2017340129006Open ↗
03/06/2017340238442Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/13/2026B01180583-I1Open ↗
08/13/2026B01267022-I1Open ↗
08/13/2026B01267026-I1Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
07/10/2014320924354Open ↗
05/19/2011320310356Open ↗
03/25/2010320140833Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)5
08/13/2026B01273134-I1Open ↗
08/13/2026B01230128-I1Open ↗
08/13/2026B01230128-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/13/2026B01230128-I1Open ↗
08/13/2026B01230128-S2Open ↗
08/13/2026B01230128-S1Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER2
06/14/2016340238442Open ↗
06/12/2015340238442Open ↗
▸BISSUPERSEDING LETTER1
06/12/2015340238442Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/22/2017340129006Open ↗
04/07/2014340129006Open ↗
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET5
07/10/2014320924354Open ↗
05/19/2011320310356Open ↗
03/25/2010320140833Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
03/11/2015340232625Open ↗
03/11/2015340238442Open ↗
04/07/2014340129006Open ↗
▸BISADDITIONAL INFORMATION1
06/02/2015340129006Open ↗
▸Other Documents1
▸DOB NOWIRA Certification1
08/13/2026B01180583-I1Open ↗