← Back
Two stories - detached, small or mid-size
120-31 199 STREET
QUEENS · St. Albans · BIN 4273484
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R3AZoning
2,274 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,800 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingGeneral
Roof6p · 1 filing · 7 docs
Floor 27p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar6p · 1 filing · 20 docs
Site & exterior6p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KING DAVID ARCHITECTURE PC205/13/2025
TOM PETERSEN ARCHITECT, LLC204/23/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTURION SOLAR ENERGYGeneral Contractor303/21/2026
AMC PLBG, HTG & CLNG, INCPlumbing307/08/2026
OGC ELECTRICAL CONTRACTORElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252205/13/2025
THOMAS PETERSEN ARCHITECT7854204/23/2025
Building Lifecycle
All (31)Filed (4)Permit Issued (4)Signed Off (2)Violation (1)Inspection (2)Objection (2)Special Inspection (16)
07/08/2025
Signed off — Alteration
FILING FOR PLUMBING WORK TYPE IN CONJUNCTION WITH DOB # 421799502
Q00482133-I1
05/29/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
INDARDEO PARBHUNATH
05/29/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
05/29/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
INDARDEO PARBHUNATH
05/29/2025
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
05/29/2025
Special inspection requirement — Maintenance information
INDARDEO PARBHUNATH
05/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
INDARDEO PARBHUNATH
05/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
INDARDEO PARBHUNATH
05/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
INDARDEO PARBHUNATH
05/23/2025
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
Q01147618-I1
05/13/2025
Filed — Alteration
FILING FOR PLUMBING WORK TYPE IN CONJUNCTION WITH DOB # 421799502
Q00482133-P1
05/07/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
INDARDEO PARBHUNATH
05/07/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
INDARDEO PARBHUNATH
05/07/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
05/07/2025
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
05/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
INDARDEO PARBHUNATH
05/07/2025
Special inspection requirement — Maintenance information
INDARDEO PARBHUNATH
05/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
INDARDEO PARBHUNATH
05/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
INDARDEO PARBHUNATH
04/23/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
Q01147618-P1
01/14/2025
Permit issued — Plumbing
Q00482133-I1-PL
12/05/2024
Permit issued — Solar
Q01147618-I1-SL
12/02/2024
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
Q01147618-I1
12/07/2023
Permit issued — Plumbing
Q00482133-I1-PL
09/15/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/31/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/20/2023
Permit issued — Plumbing
Q00482133-I1-PL
06/21/2021
Objection raised — Other
06/21/2021
Objection resolved — Addressed
05/20/2021
Filed — Alteration
FILING FOR PLUMBING WORK TYPE IN CONJUNCTION WITH DOB # 421799502
Q00482133-I1
08/26/2019
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC01/14/2025
DOB NOWSolarSigned-offCENTURION SOLAR ENERGY12/05/2024
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC12/07/2023
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC06/20/2023
BISOTISSUEDEFFICIENT STRUCTURES CORP04/05/2023
2 projects · most recent 11/24/2024
General Wiring
FiledStatusContractorScope
11/24/2024CompleteBERGER QUALITY ELEC'L CON—
02/06/2024Permit IssuedOGC ELECTRICAL CONTRACTORGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
05/29/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationINDARDEO PARBHUNATHspecial
05/29/2025Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
05/29/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesINDARDEO PARBHUNATHspecial
05/29/2025Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
05/29/2025Maintenance informationINDARDEO PARBHUNATHenergy_progress
05/29/2025HVAC-R and service water piping design and insulationINDARDEO PARBHUNATHenergy_progress
05/29/2025HVAC-R and service water heating system controlsINDARDEO PARBHUNATHenergy_progress
05/29/2025HVAC-R and service water heating equipmentINDARDEO PARBHUNATHenergy_progress
05/07/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationINDARDEO PARBHUNATHspecial
05/07/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesINDARDEO PARBHUNATHspecial
05/07/2025Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
05/07/2025Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
05/07/2025HVAC-R and service water heating equipmentINDARDEO PARBHUNATHenergy_progress
05/07/2025Maintenance informationINDARDEO PARBHUNATHenergy_progress
05/07/2025HVAC-R and service water piping design and insulationINDARDEO PARBHUNATHenergy_progress
05/07/2025HVAC-R and service water heating system controlsINDARDEO PARBHUNATHenergy_progress
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026Q00482133-P1Request digital key ↗
08/21/2026Q01147618-I1Request digital key ↗
08/21/2026Q01147618-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION4
03/11/2024421799502Open ↗
03/08/2021421799502Open ↗
01/28/2021421799502Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
04/05/2023421799502Open ↗
03/29/2023421799502Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
09/08/2021421799502Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
09/08/2021421799502Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026Q00482133-P1Open ↗
08/13/2026Q00482133-I1Open ↗
▸BISZONING DIAGRAM1
03/09/2021421799502Open ↗
▸Seals & Professional Certifications15
▸DOB NOWSpecial Inspector Seal & Signature6
08/27/2026Q00482133-P1Open ↗
08/27/2026Q00482133-P1Open ↗
08/27/2026Q00482133-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00482133-I1Open ↗
08/27/2026Q00482133-P1Open ↗
08/21/2026Q01147618-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026Q00482133-P1Open ↗
08/27/2026Q00482133-P1Open ↗
08/27/2026Q00482133-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/03/2020421799502Open ↗
▸Trade Schedules & Equipment2
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/20/2025421799502Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
10/20/2025421799502Open ↗
▸Safety & Tenant Protection2
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
10/22/2025421799502Open ↗
▸BISSTREET TREE CHECKLIST1
02/03/2020421799502Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026Q00482133-P1Open ↗
08/21/2026Q01147618-I1Open ↗
08/21/2026Q01147618-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/03/2020421799502Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/05/2021421799502Open ↗
03/09/2021421799502Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
10/20/2025421799502Open ↗
▸BISFENESTRATION AIR LEAKAGE1
10/20/2025421799502Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
10/20/2025421799502Open ↗
▸BISINTERIOR LIGHTING POWER1
10/20/2025421799502Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
10/20/2025421799502Open ↗
▸BISFENESTRATION AREAS1
10/20/2025421799502Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
10/20/2025421799502Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/20/2025421799502Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/20/2025421799502Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/03/2020421799502Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00482133-I1Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY8
10/22/2025421799502Open ↗
10/21/2025421799502Open ↗
03/16/2023421799502Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSOIL REPORT2
08/13/2026Q00482133-P1Open ↗
08/13/2026Q00482133-I1Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
10/20/2025421799502Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
10/20/2025421799502Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
10/20/2025421799502Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/20/2025421799502Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
10/20/2025421799502Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
10/20/2025421799502Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
10/20/2025421799502Open ↗
▸BISSOIL REPORT1
12/16/2020421799502Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
10/20/2025421799502Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
12/16/2020421799502Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00482133-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION4
02/26/2021421799502Open ↗
12/16/2020421799502Open ↗
12/16/2020421799502Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL1
01/28/2026421799502Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01147618-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
02/26/2021421799502Open ↗
▸BISCOST AFFIDAVIT1
02/03/2020421799502Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/21/2026421799502Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
10/15/2025421799502Open ↗
▸BISEFILING COVER SHEET1
02/03/2020421799502Open ↗
▸Other Documents4
▸BISSUSTAINABLE ROOF ZONE FORM1
03/09/2021421799502Open ↗
▸BISPERMANENT CERTIFICATE1
10/20/2025421799502Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
10/20/2025421799502Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
10/20/2025421799502Open ↗