← Back
BuildNYC
Two family frame
120-43 NASHVILLE BOULEVARD
QUEENS · St. Albans · BIN 4273560
💬 Discuss this project
1964Year Built
2Stories
B2Building Class
R3AZoning
2,200 sfGross Floor Area
2Units
Two family frame · 4,500 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar panel installation2p · 1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/12/2020$750K—Private party → Private party$341/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering108/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunrun Installation ServiceGeneral Contractor109/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272108/21/2026
Building Lifecycle
08/31/2026
Permit issued — Solar
Q01447556-I1-SL
08/21/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01447556-I1
08/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/21/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
7 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service08/31/2026
1 project · most recent 10/30/2026
FiledStatusContractorScope
10/30/2026CompleteSunrun Solar Electl—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/21/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/21/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
08/18/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/18/2026Energy Code Compliance InspectionsWalid Abdullaprogress
08/18/2026FinalWalid Abdullaprogress
8 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account