3 Open Violations 0 unresolved · 3 paperwork only▸
ECB05/17/2024REINSPECTION OF CONDITIONS AT GROUND FLOOR FOR GAS DRYER ) NEWLY INSTALLED GAS SHUT OFF VALVE FOR GAS DRYER AND NO PERMITS ON FILE FOR ANY WORK PERFORMED... WORK WAS 100% PERFORMED AT TIME OF INSPECTION OBSERVANothing owed — awaiting certificate of correction
ECB05/17/2024NEWLY INSTALLED GAS SHUT OFF VALVE FOR GAS DRYER AND NO PERMITS ON FILE FOR ANY WORK PERFORMED... WORK WAS 100% PERFORMED AT TIME OF INSPECTION WAS NOT COMPLIED WITH BY 10/31/2023 STILL NO PERMIT FILED TO MAKENothing owed — awaiting certificate of correction
ECB01/13/2003WORK WITHOUT A PERMIT. WORK NOTED: BASEMENT APT ERECTED INTERIOR A PARTITION AT VARIOUS LOCATION BATHROOM. NEW WALLS AND ALSO REPLACE FLOOR JOIST AND NEW SUBFLOORING. STOP ALL WORK. REMEDY: OBTAIN A PERMIT.Nothing owed — awaiting certificate of correction
Two family brick · 1,943 sf lot · 1.95 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.