← Back
General warehouse
120 BRUCKNER BOULEVARD
BRONX · Mott Haven-Port Morris · BIN 2000137
💬 Discuss this project
1913Year Built
6Stories
E1Building Class
M1-5/R8AZoning
—Gross Floor Area
1Units
9 Open Violations ▸FDNY Report ↗
General warehouse · 5.49 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1 filing · 15 docs
Floor 6Under Construction1p · 2 filings · 20 docs
Floor 5Under Construction2 filings · 20 docs
Floor 4Under Construction2 filings · 20 docs
Floor 3Under Construction2 filings · 20 docs
Floor 2Under Construction2 filings · 20 docs
Floor 1Under Construction2 filings · 20 docs
Sub-Basement1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STANDARD CONSTRUCTION409/13/2026
LITTLE JOHN MOVING INC2207/08/2026
OWNER OF 120 BRUCKNER BLV103/22/2026
TIERA CONTRACTING INC103/21/2026
TRIERA CONTRACTING503/21/2026
UGB CONSTRUCTION503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EMPIRE DESIGN CORP208/24/2026
NEW YORK ENGINEERING ASSOC., P.C.209/18/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AIR EXTREME INCGeneral Contractor303/21/2026
JEFFREY SOLOMONElectrical303/21/2026
STANDARD CONSTRUCTION CORGeneral Contractor208/27/2026
A.R.L. PLUMBING & HTG LLCPlumbing107/08/2026
VINCENT LOGOZZOElectrical103/21/2026
JOHN AHRENSElectrical103/21/2026
SANKAR SHILElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EMPIRE DESIGN CORP5474108/24/2026
NEW YORK ENGINEERING ASSO851209/18/2019
Building Lifecycle
All (67)Filed (4)Permit Issued (4)Signed Off (1)Violation (46)Special Inspection (12)
08/26/2026
Permit issued — General Construction
X01449950-I1-GC
08/24/2026
Filed — Alteration
APPLICATION FILE FOR EXTERIOR FACADE REPAIR WORK AS PER PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01449950-I1
08/22/2026
Special inspection requirement — Final
Md Rashid
08/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Md Rashid
08/22/2026
Special inspection requirement — Masonry
Md Rashid
07/31/2026
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 120 BRUCKNER BOULEVARD, BRONX, AS PER PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01439136-I1
07/31/2026
Permit issued — Sidewalk Shed
X01439136-I1-SH
07/29/2026
Violation issued (ECB, open)
Construction
07/27/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/12/2024
Violation issued (FDNY_NOV, closed)
01/10/2020
Signed off — Alteration
REFILING APPLICATION # 220405372 FOR THE INSTALLATION OF HVAC EQUIPMENT THROUGHOUT THE BUILDING.
X00198517-S1
10/30/2019
Permit issued — Mechanical Systems
X00198517-S1-MS
10/09/2019
Permit issued — Plumbing
X00198517-I1-PL
09/18/2019
Filed — Alteration
REFILING APPLICATION # 220405372 FOR THE INSTALLATION OF HVAC EQUIPMENT THROUGHOUT THE BUILDING.
X00198517-S1
09/12/2019
Special inspection requirement — Maintenance information
LOUIS ARENA
09/12/2019
Special inspection requirement — HVAC insulation and sealing
LOUIS ARENA
09/12/2019
Special inspection requirement — HVAC and service water heating system controls
LOUIS ARENA
09/12/2019
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
09/12/2019
Special inspection requirement — HVAC and service water heating equipment
LOUIS ARENA
09/11/2019
Special inspection requirement — Mechanical Systems
LOUIS ARENA
09/11/2019
Special inspection requirement — Final
LOUIS ARENA
09/09/2019
Filed — Alteration
REFILING APPLICATION # 220405372 FOR THE INSTALLATION OF HVAC EQUIPMENT THROUGHOUT THE BUILDING.
X00198517-I1
08/12/2019
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
07/23/2019
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
09/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/17/2013
Violation issued (ECB, closed)
Construction
01/18/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/18/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/11/2012
Violation issued (ECB, closed)
Construction
01/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/28/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/23/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/23/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2009
Violation issued (ECB, closed)
Elevators
09/23/2009
Violation issued (ECB, closed)
Elevators
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/04/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/04/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/18/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/18/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/01/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/01/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/30/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/30/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/01/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/29/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/12/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/12/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/13/2004
Violation issued (ECB, closed)
Construction
02/26/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/26/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/26/2004
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/26/2004
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/21/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/19/2003
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/25/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/25/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/27/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSTANDARD CONSTRUCTION COR08/26/2026
DOB NOWSidewalk ShedPermit IssuedSTANDARD CONSTRUCTION COR07/31/2026
DOB NOWMechanical SystemsSigned-offAIR EXTREME INC10/30/2019
DOB NOWPlumbingPermit IssuedA.R.L. PLUMBING & HTG LLC10/09/2019
BISMHISSUEDAIR EXTREME INC08/29/2018
BISOTISSUEDABILENE INC08/13/2018
BISOTISSUEDBENSOL TECH LLC06/29/2018
BISFBISSUEDABILENE, INC06/13/2018
BISMHISSUEDAIR EXTREME INC08/09/2017
BISEQISSUEDTRIERA CONTRACTING INC06/08/2017
BISOTISSUEDBENSOL TECH LLC05/23/2017
BISOTISSUEDBENSOL TECH LLC05/23/2017
BISEQISSUEDTRIERA CONTRACTING INC01/11/2017
BISOTISSUEDBENSOL TECH LLC09/30/2016
BISPLISSUEDA.R.L. PLUMBING & HTG LLC11/10/2015
BISMHISSUEDAIR EXTREME INC10/29/2015
BISOTISSUEDUSMAN G. BHUTTA03/22/2013
BISOTISSUEDUSMAN G. BHUTTA03/22/2013
BISEQISSUEDUSMAN G. BHUTTA02/04/2013
BISEQISSUEDCOLGATE SCAFFOLDING03/30/2005
BISOTISSUEDMB CONTRACTING CORP11/26/2004
BISEQISSUEDCOLGATE SCAFFOLDING09/30/2004
BISEQISSUEDCITY SCAFFOLDING CORP.01/16/2001
BISEQISSUEDM.B. WATERPROOFING, INC.09/28/2000
BISEQISSUEDCITY SCAFFOLDING CORP.07/13/2000
BISFBISSUEDRICHARD MORTMAN01/04/1996
BIS—ISSUEDLITTLE JOHN'S MOVING04/05/1995
BIS—ISSUEDFORT CICA FOOFING & GENERAL CONT10/20/1993
1 project · most recent 09/18/2019
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
09/18/2019Signed-offAIR EXTREME INCAir Conditioning Systems, Heating Systems
Cooling
Trane 4TXCD061BC3HCBA 2,033 CFM · Condensing Unit ×4
4TTA3060D3000CA 60,000 BTU · Condensing Unit ×1
4TXCD010DS3HCAA 333 CFM · Condensing Unit ×1
UNKNOWN ×1
Fujitsu AOU12RLS2 12,000 BTU · Condensing Unit ×2
ASU12RLS2 400 CFM · Ahu ×2
American Standard 4TTA3060D3000CA 60,000 BTU · Condensing Unit ×3
Abcoolair ABVAP10N3 ×1
Heating
Trane AUH1D120A9601AA 110,000 BTU · Furnace ×4
AUH1D120A9601CB 110,000 BTU · Furnace ×2
SD-255A-D 255,000 BTU · Furnace ×1
1 project · most recent 09/18/2019
Gas
FiledStatusContractorScope
09/18/2019Permit IssuedA.R.L. PLUMBING & HTG LLCGas
3 projects · most recent 07/28/2026
Boiler Controls
FiledStatusContractorScope
07/28/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
07/07/2020CompleteGT ELECTRICAL COMPANY INC—
08/20/2018CompleteABILENE ELECTRIC INCBoiler Controls
1 project · most recent 07/31/2026
Sidewalk Shed
FiledStatusContractorScope
07/31/2026Permit IssuedSTANDARD CONSTRUCTION CORSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
08/22/2026FinalMd Rashidprogress
08/22/2026Structural Stability – Alterations of existing buildingsMd Rashidspecial
08/22/2026MasonryMd Rashidspecial
09/12/2019Maintenance informationLOUIS ARENAenergy_progress
09/12/2019HVAC insulation and sealing LOUIS ARENAenergy_progress
09/12/2019HVAC and service water heating system controls LOUIS ARENAenergy_progress
09/12/2019Energy Code Compliance InspectionsLOUIS ARENAprogress
09/12/2019HVAC and service water heating equipment LOUIS ARENAenergy_progress
09/11/2019Mechanical SystemsLOUIS ARENAspecial
09/11/2019FinalLOUIS ARENAprogress
08/12/2019Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
07/23/2019Energy Code Compliance InspectionsLOUIS ARENAprogress
▾Documents — 192 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch2
08/25/2026X01449950-I1Request digital key ↗
08/16/2026X01439136-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/26/2026X00198517-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026X00198517-S1Request digital key ↗
▸Applications & Permits45
▸BISPLAN / WORK APPROVAL APPLICATION21
09/10/2021220482494Open ↗
08/30/2021220405390Open ↗
06/17/2021220482494Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION21
10/08/2019220405372Open ↗
08/29/2018220405372Open ↗
07/09/2018220482494Open ↗
Showing 3 of 21 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1133
09/24/2012220079894Open ↗
09/24/2012220079876Open ↗
09/24/2012220079885Open ↗
▸Seals & Professional Certifications48
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
01/15/2019240225270Open ↗
03/20/2017220482494Open ↗
06/02/2016220405390Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/29/2026X00198517-I1Open ↗
09/23/2026X01449950-I1Open ↗
08/31/2026X00198517-S1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
06/12/2018240225270Open ↗
06/07/2017240186062Open ↗
03/20/2017220482494Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
04/07/2017220482494Open ↗
06/02/2016220405390Open ↗
08/31/2015220405372Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026X01449950-I1Open ↗
08/16/2026X01439136-I1Open ↗
08/13/2026X00198517-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/29/2026X00198517-I1Open ↗
09/23/2026X01449950-I1Open ↗
09/23/2026X01449950-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
03/14/2013220256746Open ↗
03/14/2013220256737Open ↗
01/18/2013220248337Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
06/12/2018240225270Open ↗
06/07/2017240186062Open ↗
01/07/2017240169045Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
06/12/2018240225270Open ↗
06/07/2017240186062Open ↗
01/07/2017240169045Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/31/2015220405372Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
06/12/2018240225270Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
03/18/2013220256746Open ↗
03/14/2013220256737Open ↗
01/18/2013220248337Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES2
06/07/2017240186062Open ↗
01/07/2017240169045Open ↗
▸Environmental & Asbestos20
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
06/12/2018240225270Open ↗
06/07/2017240186062Open ↗
03/20/2017220482494Open ↗
Showing 3 of 8 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED5
06/12/2018240225270Open ↗
06/07/2017240186062Open ↗
04/07/2017220482494Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
08/27/2010220079876Open ↗
08/27/2010220079885Open ↗
08/27/2010220079894Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
08/26/2021220405390Open ↗
08/26/2021220482494Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/25/2026X01449950-I1Open ↗
▸DOB NOWOER: Notice to Proceed1
08/13/2026X00198517-I1Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
01/15/2019240225270Open ↗
03/20/2017220482494Open ↗
08/31/2015220405372Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/12/2018240225270Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/15/2019240225270Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00198517-S1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
06/17/2021220482494Open ↗
06/17/2021220405390Open ↗
06/07/2017240186062Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs22
▸BISLETTERS - SUPPORTING DOCUMENTATION9
10/23/2020220482494Open ↗
10/23/2020220405390Open ↗
10/06/2020220482494Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
03/20/2017220482494Open ↗
03/14/2013220256746Open ↗
03/14/2013220256737Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
01/15/2019240225270Open ↗
01/06/2014220256737Open ↗
07/26/2013220256737Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER2
06/17/2021220482494Open ↗
06/17/2021220405390Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT13
01/15/2019240225270Open ↗
06/12/2018240225270Open ↗
03/20/2017220482494Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET9
03/20/2017220482494Open ↗
06/02/2016220405390Open ↗
08/31/2015220405372Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
06/12/2018240225270Open ↗
06/07/2017240186062Open ↗
01/07/2017240169045Open ↗
▸BISADDITIONAL INFORMATION2
09/10/2021220482494Open ↗
08/30/2021220405390Open ↗
▸BISBOROUGH INTAKE FORM1
01/15/2019240225270Open ↗
▸Other Documents5
▸BISENVIRONMENTAL 'E' DEP NOTICE TO PROCEED3
03/21/2013220256737Open ↗
03/21/2013220256746Open ↗
02/05/2013220248337Open ↗
▸BISENVIRONMENTAL -E- DEP NOTICE OF SATIS2
03/25/2013220256746Open ↗
03/25/2013220256737Open ↗