120 CABRINI BOULEVARD
MANHATTAN · BIN 1079988
💬 Discuss this project
1939Year Built
14Stories
D4Building Class
R7-2Zoning
890,134 sfGross Floor Area
594Units
LL97 CoveredRent Stabilized45 Open Violations 37 unresolved · 8 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · 382,704 sf lot · 2.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction60p · 3 filings · 20 docs
Floor 126p · 2 filings · 11 docs
Floor 117p · 2 filings · 11 docs
Floor 107p · 2 filings · 11 docs
Floor 99p · 3 filings · 14 docs
Floor 87p · 2 filings · 11 docs
Floor 77p · 2 filings · 11 docs
Floor 67p · 2 filings · 11 docs
Floor 58p · 3 filings · 20 docs
Floor 47p · 2 filings · 11 docs
Floor 37p · 2 filings · 11 docs
Floor 210p · 3 filings · 20 docs
Floor 18p · 2 filings · 11 docs
Cellar32p · 8 filings · 20 docs
Sub-Basement6p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CASTLE VILLAGE OWNERS11108/25/2026
ORSID REALTY507/08/2026
CENTRAL CONSTRUCTION MANAGEMENT807/08/2026
PYRAMID RESTORATION NY407/08/2026
GOODSTEIN MANAGEMENT303/22/2026
OWNER OF 180 CABARINI BLV103/22/2026
LIZ RESTORATION CORP103/22/2026
FIRST SERVICE RESIDENTIAL103/21/2026
CASTLE HILL VILLAGE OWNERS203/21/2026
CASTEL VILLAGE 0WNERS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTRAL CONSTRUCTION MANAGEMENTGeneral Contractor1007/08/2026
L. GLASHOW, INCPlumbing407/08/2026
K.E.S CONSTRUCTION CO INCGeneral Contractor404/09/2026
G.B. & SON, INCPlumbing307/08/2026
ARTHUR CZECHGeneral Contractor307/08/2026
RD HOME CONSTRUCTION INCGeneral Contractor307/08/2026
SYSTEMS 2000 PLUMBING SERGeneral Contractor303/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor308/25/2026
ARISTON CHIMNEY LLCGeneral Contractor303/21/2026
ARIEL SERVICES INCPlumbing207/08/2026
SEROY INCGeneral Contractor204/09/2026
DJM NYC, LLCGeneral Contractor107/08/2026
MCMANUS MECHANICAL MAINTAGeneral Contractor107/08/2026
PYRAMID RESTORATION NY LLGeneral Contractor107/08/2026
ARANDA PLBG & HTG CORPPlumbing107/08/2026
MCMANUS MECH MAINT P&H INCPlumbing107/08/2026
STANDARD PLBG SVS LLCPlumbing107/08/2026
ANSHELEWITZ, ALVINElectrical103/21/2026
SYSTEMS 2000 PLBG SVCS LLPlumbing107/08/2026
DIAZ FRANCISCOElectrical103/21/2026
DIAZ, FRANCISCOElectrical103/21/2026
GEMINI ELECTRIC CO., INC.Electrical103/22/2026
KENNEDY, DANIELElectrical103/21/2026
LEONCIO REYESElectrical103/21/2026
POTTINGER, PATRICKElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JSPECS,INC9429103/10/2026
AK CONSULTING SERVICES, I6198409/11/2025
CROSSCHECK INSPECTION SER544205/13/2025
LOMBARDO PROF ENGINEERING8566102/06/2024
NY RESTORATION TECHNOLOGY6187201/29/2024
MVN ARCHITECT LLC5226101/23/2024
NEW AGE ENGINEERING PLLC7746312/21/2023
O'ROURKE ENGINEERING, LLC5873312/01/2023
MOORE ENG. OF NY, DPC9134109/11/2023
KIMOY STUDIOS3572107/24/2023
Building Lifecycle
All (246)Filed (38)Permit Issued (43)Signed Off (10)Facade (FISP) (14)Violation (49)Inspection (18)Objection (44)Special Inspection (30)
08/24/2026
Permit issued — Sidewalk Shed
M01225247-I1-SH
06/24/2026
Violation issued (ECB, closed)
Unknown
06/24/2026
Violation issued (ECB, open)
Construction
06/24/2026
Violation issued (ECB, open)
Unknown
06/16/2026
Permit issued — General Construction
M01363647-I1-GC
06/02/2026
Permit issued — Sidewalk Shed
M01225247-I1-SH
05/27/2026
Permit issued — General Construction
M01363647-I1-GC
04/24/2026
Permit issued — General Construction
M01363647-I1-GC
04/20/2026
Objection resolved — Addressed
04/17/2026
Objection resolved — Addressed
04/17/2026
Objection resolved — Addressed
04/17/2026
Objection resolved — Addressed
04/17/2026
Objection resolved — Addressed
04/17/2026
Objection resolved — Addressed
04/16/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/13/2026
Objection raised — Structural
03/13/2026
Objection raised — Structural
03/13/2026
Objection raised — Structural
03/13/2026
Objection raised — Scope
03/12/2026
Objection raised — Scope
03/11/2026
Objection raised — Scope
03/10/2026
Filed — Alteration
Minor interior renovation of apartment # 98 on the 9th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use egress or occupancy.
M01363647-I1
02/17/2026
Permit issued — Plumbing
M01308921-I1-PL
12/05/2025
Permit issued — Suspended Scaffold
M00998908-I1-SC
12/02/2025
Permit issued — Plumbing
M01308921-I1-PL
11/28/2025
Permit issued — General Construction
M01193107-I1-GC
11/28/2025
Permit issued — Structural
M01193107-S1-ST
11/28/2025
Permit issued — Suspended Scaffold
M01216206-I1-SC
11/26/2025
Permit issued — General Construction
M01308902-I1-GC
11/25/2025
Permit issued — General Construction
M01308902-I1-GC
10/30/2025
Filed — Alteration
CAP AND REMOVE 1 GAS RANGE. FILED IN CONJUNCTION WITH GC JOB M01308902-I1 TO COMBINE APARTMENTS. ALL AS PER PLANS FILED HEREWITH.
M01308921-I1
10/30/2025
Filed — Alteration
M01308902-I1
10/27/2025
Special inspection requirement — Final
David Jimenez
09/24/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01225247-P1
09/16/2025
Violation issued (ECB, closed)
Construction
09/11/2025
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE REPAIR WORK AND FACADE INSPECTION AT 180 CABRINI BOULEVARD, MANHATTAN.
M01216206-P3
09/11/2025
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
09/11/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MAHFUZAR RAHMAN
08/13/2025
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE REPAIR WORK AND FACADE INSPECTION AT 180 CABRINI BOULEVARD, MANHATTAN.
M01216206-P2
08/13/2025
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
08/13/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MAHFUZAR RAHMAN
07/22/2025
Objection raised — Other
07/22/2025
Objection resolved — Addressed
07/18/2025
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE REPAIR WORK AND FACADE INSPECTION AT 180 CABRINI BOULEVARD, MANHATTAN.
M01216206-P1
07/14/2025
Violation issued (ECB, closed)
Construction
06/26/2025
Permit issued — Structural
M01193107-S1-ST
06/25/2025
Permit issued — General Construction
M01193107-I1-GC
06/02/2025
Permit issued — Sidewalk Shed
M01225247-I1-SH
05/30/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01225247-I1
05/28/2025
Violation issued (ECB, open)
Construction
05/28/2025
Objection resolved — Addressed
05/22/2025
Objection raised — Energy
05/21/2025
Objection resolved — Addressed
05/13/2025
Filed — Alteration
subsequent ST filed to satisfy partial demo requirement for -I1 GC facade repair application (lintels and parapet).
M01193107-S1
05/13/2025
Signed off — Alteration
ARCHITECTURAL SCOPE ASSOCIATED WITH INTERIOR RENOVATION OF APT.51, INCLUDING BATHROOM AND KITCHEN RENOVATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00891934-S1
05/13/2025
Objection resolved — Addressed
05/13/2025
Objection resolved — Addressed
05/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
Michael Notaro
05/08/2025
Objection raised — Scope
05/08/2025
Objection raised — Scope
Latest 60 of 246 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC08/24/2026
DOB NOWGeneral ConstructionSigned-offARTHUR CZECH06/16/2026
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC06/02/2026
DOB NOWGeneral ConstructionSigned-offARTHUR CZECH05/27/2026
DOB NOWGeneral ConstructionSigned-offARTHUR CZECH04/24/2026
DOB NOWPlumbingSigned-offL. GLASHOW, INC02/17/2026
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY12/05/2025
DOB NOWPlumbingSigned-offL. GLASHOW, INC12/02/2025
DOB NOWGeneral ConstructionPermit IssuedK.E.S CONSTRUCTION CO INC11/28/2025
DOB NOWStructuralPermit IssuedK.E.S CONSTRUCTION CO INC11/28/2025
DOB NOWSuspended ScaffoldPermit IssuedK.E.S. CONSTRUCTION CO IN11/28/2025
DOB NOWGeneral ConstructionSigned-offSEROY INC11/26/2025
DOB NOWGeneral ConstructionSigned-offSEROY INC11/25/2025
DOB NOWStructuralPermit IssuedK.E.S CONSTRUCTION CO INC06/26/2025
DOB NOWGeneral ConstructionPermit IssuedK.E.S CONSTRUCTION CO INC06/25/2025
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC06/02/2025
DOB NOWSuspended ScaffoldPermit IssuedK.E.S. CONSTRUCTION CO IN05/02/2025
DOB NOWPlumbingPermit IssuedA&H PLUMBING,LLC01/13/2025
DOB NOWSprinklersSigned-offUNIVERSAL FIRE SPR LLC05/31/2024
DOB NOWPlumbingPermit IssuedSYSTEMS 2000 PLBG SVCS LL04/09/2024
DOB NOWGeneral ConstructionPermit IssuedSYSTEMS 2000 PLUMBING SER04/05/2024
DOB NOWGeneral ConstructionSigned-offRD HOME CONSTRUCTION INC03/08/2024
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY03/01/2024
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP02/05/2024
DOB NOWGeneral ConstructionSigned-offPYRAMID RESTORATION NY LL01/30/2024
DOB NOWGeneral ConstructionSigned-offRD HOME CONSTRUCTION INC01/30/2024
DOB NOWPlumbingSigned-offARIEL SERVICES INC11/30/2023
DOB NOWBoiler EquipmentSigned-offCAM ENERGY HTG AND MECH04/21/2023
DOB NOWSprinklersSigned-offSTANDARD FIRE SUPP CORP11/04/2022
DOB NOWPlumbingPermit IssuedARIEL SERVICES INC05/24/2022
DOB NOWPlumbingSigned-offMCMANUS MECH MAINT P&H IN02/16/2022
DOB NOWGeneral ConstructionSigned-offMCMANUS MECHANICAL MAINTA02/11/2022
DOB NOWPlumbingPermit IssuedG.B. & SON, INC11/10/2021
DOB NOWPlumbingPermit IssuedG.B. & SON, INC10/13/2021
DOB NOWSidewalk ShedSigned-offCENTRAL CONSTRUCTION MANAGEMENT03/19/2021
DOB NOWSidewalk ShedSigned-offCENTRAL CONSTRUCTION MANAGEMENT01/11/2021
DOB NOWSidewalk ShedSigned-offDJM NYC, LLC10/21/2020
DOB NOWPlumbingPermit IssuedG.B. & SON, INC09/11/2020
DOB NOWSidewalk ShedSigned-offCENTRAL CONSTRUCTION MANAGEMENT08/20/2020
DOB NOWMechanical SystemsSigned-offARISTON CHIMNEY LLC07/08/2020
+ 53 more permits on file
1 project · most recent 12/16/2021
Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
12/16/2021——Associated Ducts and Piping, Heating Systems
Heating
Weil-Mclain 1394 430,000 BTU · Boiler ×2
Ducts & Piping
Weil-Mclain 1394 433,000 BTU · Boiler ×2
2 projects · most recent 12/01/2023
FiledStatusContractorScope
12/01/2023Signed-offUNIVERSAL FIRE SPR LLC3 heads
01/06/2023Signed-offSTANDARD FIRE PROTECT LLC—
2 projects · most recent 10/30/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/30/2025Signed-offL. GLASHOW, INCGas
03/21/2023Permit IssuedSTANDARD PLBG SVS LLCGas, Water/Sanitary
9 projects · most recent 04/22/2026
General Wiring
FiledStatusContractorScope
04/22/2026Permit IssuedATLAS PRIME ELECTRIC LLCGeneral Wiring
06/05/2025Permit IssuedBOROWIDE ELECT'L CONTR'S—
04/09/2025Permit IssuedR-2 ELECTRIC INCGeneral Wiring
04/21/2023CompleteLAURA ELEC'L LIGHTING &—
09/30/2021CompleteGEMINI ELECTRIC CO., INC.General Wiring
04/09/2020CompleteE-J ELEC. INSTALLATION COGeneral Wiring
11/13/2019CompleteH.P. ELVTR AND ELCTL SVCSGeneral Wiring
07/19/2019CompleteEPC ELECTRICAL CORP.—
03/13/2019CompleteTOP SHELF ELECTRIC CORP—
1 project · most recent 05/13/2025
Steel
FiledStatusContractorScope
05/13/2025Permit IssuedK.E.S CONSTRUCTION CO INCSteel
1 project · most recent 09/24/2025
Sidewalk Shed
FiledStatusContractorScope
09/24/2025Permit IssuedANDAMIO SCAFFOLDING LLCSidewalk Shed
1 project · most recent 09/11/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/11/2025Permit IssuedK.E.S. CONSTRUCTION CO INSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
04/16/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/07/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
01/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/26/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/17/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/02/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
04/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/28/2023Pass-Final Boiler Equipment InspectionPassView ↗
03/01/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
11/21/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/09/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/09/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
10/27/2025FinalDavid Jimenezprogress
09/11/2025Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
09/11/2025Post-installed AnchorsMAHFUZAR RAHMANspecial
08/13/2025Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
08/13/2025Post-installed AnchorsMAHFUZAR RAHMANspecial
05/13/2025Fire-Resistance Rated ConstructionMichael Notaroprogress
03/11/2025Post-installed AnchorsEUGENE BIFULCOspecial
03/11/2025MasonryEUGENE BIFULCOspecial
03/11/2025Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
03/11/2025FinalMichael Notaroprogress
03/11/2025PreliminaryMichael Notaroprogress
03/11/2025Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
01/30/2024Tenant Protection Plan ComplianceHamidreza Sagharispecial
01/30/2024MasonryHamidreza Sagharispecial
01/30/2024Post-installed AnchorsMichael Notarospecial
01/30/2024Structural Stability – Alterations of existing buildingsHamidreza Sagharispecial
01/30/2024FinalMichael Notaroprogress
01/30/2024PreliminaryMichael Notaroprogress
01/29/2024Structural Stability – Alterations of existing buildingsHamidreza Sagharispecial
01/29/2024MasonryHamidreza Sagharispecial
01/29/2024PreliminaryMichael Notaroprogress
01/29/2024FinalMichael Notaroprogress
01/29/2024Fire-Resistant Penetrations and JointsStephen Shishkospecial
01/29/2024Tenant Protection Plan Compliance—special
01/29/2024Post-installed AnchorsHamidreza Sagharispecial
Latest 25 of 62.
▾Documents — 479 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch28
09/03/2026M00625410-P1Request digital key ↗
09/03/2026M00625410-I1Request digital key ↗
09/03/2026M00634416-S1Request digital key ↗
Showing 3 of 28 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
08/31/2026M00377939-I1Request digital key ↗
08/31/2026M00377939-P3Request digital key ↗
08/31/2026M00377939-P5Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/05/2026M00142646-I1Request digital key ↗
09/05/2026M00260166-I1Request digital key ↗
08/15/2026M00142646-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00361697-I1Request digital key ↗
▸Applications & Permits80
▸BISPLAN / WORK APPROVAL APPLICATION45
07/21/2023120047715Open ↗
02/21/2023120047715Open ↗
02/06/2023120047715Open ↗
Showing 3 of 45 on file for this type
▸BISWORK PERMIT APPLICATION35
11/02/2020123574872Open ↗
04/19/2019123574872Open ↗
12/11/2018123534586Open ↗
Showing 3 of 35 on file for this type
▸Seals & Professional Certifications135
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION44
08/16/2019120669446Open ↗
08/16/2019120669446Open ↗
08/07/2019120669446Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature33
09/04/2026M00361697-I1Open ↗
09/03/2026M00625938-I1Open ↗
09/03/2026M00625410-P1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature28
09/19/2026M00991723-P1Open ↗
09/01/2026M00926432-I1Open ↗
09/01/2026M00926432-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/19/2026M00991723-P1Open ↗
09/01/2026M00926432-I1Open ↗
09/01/2026M00891934-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
09/27/2018123468372Open ↗
10/21/2015122545718Open ↗
Showing 2 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
09/27/2018123468372Open ↗
03/28/2018140752273Open ↗
10/21/2015122545718Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
03/28/2018140752273Open ↗
10/13/2015140415575Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
03/28/2018140752273Open ↗
10/13/2015140415575Open ↗
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING10
03/28/2018140752273Open ↗
Showing 1 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
09/27/2018123468372Open ↗
02/27/2018123435577Open ↗
▸Safety & Tenant Protection14
▸DOB NOWTenant Protection Plan8
09/04/2026M00361697-I1Open ↗
08/13/2026M00260166-I1Open ↗
08/13/2026M00377939-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTenant Protection Plan and Notes5
11/21/2018123534586Open ↗
09/28/2018123468372Open ↗
06/21/2018123574872Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/16/2018123574872Open ↗
▸Environmental & Asbestos41
▸DOB NOWDEP ACP-5: Asbestos Assessment Report28
09/04/2026M00361697-I1Open ↗
09/03/2026M00625410-I1Open ↗
09/03/2026M00625410-P1Open ↗
Showing 3 of 28 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
09/27/2018123468372Open ↗
06/21/2018123574872Open ↗
03/28/2018140752273Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
04/01/2019123435577Open ↗
03/28/2019123435577Open ↗
02/19/2019140752273Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
08/15/2022123574872Open ↗
04/01/2019123435577Open ↗
03/28/2019123435577Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/16/2022123574872Open ↗
08/15/2022123574872Open ↗
03/28/2018140752273Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/28/2018140752273Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/13/2015140415575Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00634416-I1Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY10
07/19/2023120047715Open ↗
08/16/2022123574872Open ↗
08/16/2022123574872Open ↗
Showing 3 of 10 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/19/2023120047715Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
07/19/2023120047715Open ↗
▸Approvals, Objections & Sign-offs32
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
08/17/2022123574872Open ↗
08/16/2019120669446Open ↗
08/07/2019120669446Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSUPERSEDING LETTER3
11/02/2020123574872Open ↗
10/29/2018101891598Open ↗
07/11/2018101891598Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
11/29/2018123534586Open ↗
10/18/2016140415575Open ↗
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL1
07/19/2023120047715Open ↗
▸Cost, Insurance & Ownership28
▸BISCOST AFFIDAVIT27
08/16/2022123574872Open ↗
08/15/2022123574872Open ↗
08/16/2019120669446Open ↗
Showing 3 of 27 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/19/2023120047715Open ↗
▸Filing & Intake Forms45
▸BISBOROUGH INTAKE FORM19
08/16/2019120669446Open ↗
08/07/2019120669446Open ↗
07/25/2019120669446Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET13
11/21/2018123534586Open ↗
09/27/2018123468372Open ↗
06/21/2018123574872Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION11
02/06/2019123435577Open ↗
06/21/2018123574872Open ↗
06/21/2018123574872Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
03/28/2018140752273Open ↗
10/13/2015140415575Open ↗
▸Other Documents14
▸DOB NOWCalculations5
08/13/2026M01216206-P1Open ↗
08/13/2026M01216206-P3Open ↗
08/13/2026M01216206-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWManufacturer's Specifications5
08/13/2026M01216206-P3Open ↗
08/13/2026M01216206-P2Open ↗
08/13/2026M01216206-P1Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
03/28/2018140752273Open ↗
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
10/13/2015140415575Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
04/19/2019123574872Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M01193107-S1Open ↗