← Back
Elevator cooperative
120 CABRINI BOULEVARD
MANHATTAN · BIN 1079989
💬 Discuss this project
1939Year Built
14Stories
D4Building Class
R7-2Zoning
890,134 sfGross Floor Area
594Units
LL97 CoveredRent Stabilized48 Open Violations 40 unresolved · 8 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · 382,704 sf lot · 2.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction22p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 8 docs
Floor 111p · 1 filing · 20 docs
Floor 101p · 1 filing · 20 docs
Floor 91p · 1 filing · 20 docs
Floor 81p · 1 filing · 20 docs
Floor 71p · 1 filing · 20 docs
Floor 61p · 1 filing · 20 docs
Floor 51p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar26p · 5 filings · 20 docs
1 job · most recent 12/17/2021
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
12/17/2021——Heating Systems
Heating
Weil-Mclain 1394 433,000 BTU · Boiler ×2
Ducts & Piping
Weil-Mclain 1394 433,000 BTU · Boiler ×2
1 job · most recent 11/01/2023
FiledStatusContractorScope
11/01/2023Signed-offUNIVERSAL FIRE SPR LLC3 heads
1 job · most recent 03/21/2023
Gas Water/Sanitary
FiledStatusContractorScope
03/21/2023Permit IssuedSTANDARD PLBG SVS LLCGas, Water/Sanitary
6 jobs · most recent 11/06/2025
General Wiring
FiledStatusContractorScope
11/06/2025Permit IssuedBOROWIDE ELECT'L CONTR'S—
05/29/2025CompleteEPC ELECTRICAL CORP.General Wiring
05/22/2024Permit IssuedDKNJ ELECTRIC LLCGeneral Wiring
01/12/2023CompleteE-J ELEC. INSTALLATION COGeneral Wiring
02/15/2022Permit IssuedILLUMINOUS ELECTRIC CORP.General Wiring
01/21/2021CompleteGEMINI ELECTRIC CO., INC.General Wiring
1 job · most recent 06/27/2025
Steel
FiledStatusContractorScope
06/27/2025Permit IssuedK.E.S CONSTRUCTION CO INCSteel
2 jobs · most recent 11/12/2025
Sidewalk Shed
FiledStatusContractorScope
11/12/2025Permit IssuedANDAMIO SCAFFOLDING LLCSidewalk Shed
11/09/2022Permit IssuedPLATINUM SERVICES NY LLCSidewalk Shed
1 job · most recent 06/27/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
06/27/2025Permit IssuedK.E.S CONSTRUCTION CO INCTenant Protection Plan 72 Hour
1 job · most recent 07/02/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/02/2026Permit IssuedK.E.S. CONSTRUCTION CO INSuspended Scaffold (SC)
Building Lifecycle
All (206)Filed (31)Permit Issued (30)Signed Off (7)Facade (FISP) (18)Violation (55)Inspection (12)Objection (23)Special Inspection (30)
08/12/2026
Violation issued (ECB, open)
Construction
07/10/2026
Objection raised — Other
07/10/2026
Objection resolved — Addressed
07/10/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MAHFUZAR RAHMAN
07/10/2026
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
07/02/2026
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK AND FACADE INSPECTION AT 200 CABRINI BOULEVARD, MANHATTAN.
M01314638-P1
07/02/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MAHFUZAR RAHMAN
07/02/2026
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
03/04/2026
Violation issued (ECB, open)
Cranes and Derricks
02/25/2026
Signed off — Alteration
M01196182-I1
12/04/2025
Permit issued — Suspended Scaffold
M00968047-I1-SC
12/03/2025
Permit issued — Structural
M01247812-S1-ST
11/27/2025
Permit issued — General Construction
M01247812-I1-GC
11/13/2025
Permit issued — Sidewalk Shed
M01315754-I1-SH
11/12/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01315754-I1
11/12/2025
Permit issued — Suspended Scaffold
M01314638-I1-SC
11/06/2025
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK AND FACADE INSPECTION AT 200 CABRINI BOULEVARD, MANHATTAN.
M01314638-I1
07/14/2025
Objection resolved — Addressed
07/11/2025
Objection raised — Admin
06/27/2025
Filed — Alteration
Application filed for facade and roof repairs as per drawings filed herewith.
M01247812-S1
06/27/2025
Filed — Alteration
Application filed for facade and roof repairs as per drawings filed herewith.
M01247812-I1
06/27/2025
Special inspection requirement — Preliminary
Michael Notaro
06/26/2025
Special inspection requirement — Structural Steel - Details
EUGENE BIFULCO
06/26/2025
Special inspection requirement — Final
Michael Notaro
06/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
06/26/2025
Special inspection requirement — Masonry
EUGENE BIFULCO
06/26/2025
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
06/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
06/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
06/26/2025
Special inspection requirement — Masonry
EUGENE BIFULCO
06/26/2025
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
06/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
06/26/2025
Special inspection requirement — Final
Michael Notaro
06/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
Michael Notaro
06/26/2025
Special inspection requirement — Preliminary
Michael Notaro
04/24/2025
Permit issued — General Construction
M01196182-I1-GC
04/09/2025
Filed — Alteration
M01196182-I1
03/26/2025
Cycle 9 facade report signed — SWARMP
03/06/2025
Violation issued (ECB, open)
Construction
02/24/2025
Signed off — Alteration
WATERPROOFING INSTALLATION, LINTEL REPLACEMENT, WINDOW SILL REPLACEMENT, MASONRY REPAIR AT ALL BUILDING ELEVATIONS, PARAPET REBUILDING AND STRING COURSE REPLACEMENT
M00768086-I1
02/04/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/04/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
01/24/2025
Permit issued — Sidewalk Shed
M00680578-I1-SH
12/18/2024
Cycle 9 facade report submitted
12/10/2024
Cycle 9 facade inspection completed
12/02/2024
Signed off — Alteration
This application is filed for the Combination and Interior Renovation of apartments 65/65 associated with the PL scope of work. No change in use, egress, or occupancy under this application. (TPPN #3/97)
M01004122-I1
12/02/2024
Signed off — Alteration
This application is filed for the Combination and Interior Renovation of apartments 65/65 associated with the PL scope of work. No change in use, egress, or occupancy under this application. (TPPN #3/97)
M01004122-S1
11/15/2024
Filed — Alteration
WATERPROOFING INSTALLATION, LINTEL REPLACEMENT, WINDOW SILL REPLACEMENT, MASONRY REPAIR AT ALL BUILDING ELEVATIONS, PARAPET REBUILDING AND STRING COURSE REPLACEMENT
M00768086-P1
11/04/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/30/2024
Permit issued — Plumbing
M00377960-I1-PL
10/08/2024
Signed off — Alteration
PLUMBING WORK IN THE CELLAR. PLUMBING WORK INCLUDES INSTALLATION OF NEW FIXTURES AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00622603-I1
10/04/2024
Permit issued — General Construction
M00768086-I1-GC
07/26/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/01/2024
Permit issued — Sprinklers
M00955842-I1-EW-SP
06/26/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/21/2024
Cycle 9 facade report signed — UNSAFE
06/20/2024
Cycle 9 facade report submitted
06/18/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
Latest 60 of 206 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CASTLE VILLAGE OWNER C11607/08/2026
PLATINUM SERVICES NY1207/08/2026
PYRAMID RESTORATION NY407/08/2026
C.V PARKING CORP103/22/2026
CASTLE HILL VILLAGE OWNER103/22/2026
GOODSTEIN MANAGEMENT403/22/2026
WLS ASSOCIATES503/21/2026
GARAGE MANAGEMENT203/21/2026
FIRSTSERVICE RESIDENTIAL203/21/2026
CASTLE VILLAGE OWNERS COPR303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS1203/21/2026
SOMMA DESIGN CONSULTING403/21/2026
NYCCODE403/21/2026
PLATINUM SERVICES NY403/21/2026
BG & ASSOCIATES203/21/2026
AK CONSULTING SERVICES203/21/2026
FRANKLYN ESTRELLA ARCHITECT PLLC103/21/2026
HIERARCH-E203/21/2026
NEW YORK ENGINEERING ASSOCIATES P203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM SERVICES NY LLCGeneral Contractor807/08/2026
PYRAMID RESTORATION NY LLGeneral Contractor707/08/2026
SYSTEMS 2000 PLBG SVCS LLPlumbing407/08/2026
ARISTON CHIMNEY LLCGeneral Contractor303/21/2026
MAGIC RENOVATIONS CORPGeneral Contractor303/21/2026
G.B. & SON, INCPlumbing307/08/2026
K.E.S CONSTRUCTION CO INCGeneral Contractor204/09/2026
ARIEL SERVICES INCPlumbing207/08/2026
STANDARD FIRE PROTECT LLCFire Protection107/08/2026
UNIVERSAL FIRE SPR LLCFire Protection107/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor104/09/2026
ANSHELEWITZ, ALVINElectrical103/21/2026
JDM CONTRACTING SERVICESGeneral Contractor104/09/2026
STANDARD PLBG SVS LLCPlumbing107/08/2026
GREGORY PAPANTONIOUElectrical103/21/2026
DIAZ, FRANCISCOElectrical103/21/2026
DIAZ FRANCISCOElectrical103/21/2026
PRACTICAL PLBG & HTG INCPlumbing107/08/2026
KENNEDY, DANIELElectrical103/21/2026
POTTINGER, PATRICKElectrical103/21/2026
LEONCIO REYESElectrical103/21/2026
REYES LEONCIOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK CONSULTING SERVICES, I6198207/02/2026
CROSSCHECK INSPECTION SER544206/27/2025
ETI CONSULTANTS LLC7694211/15/2024
KIMOY STUDIOS3572203/04/2024
O'ROURKE ENGINEERING, LLC5873111/01/2023
NEW AGE ENGINEERING PLLC7746104/18/2023
RICHARD H. BALSER ENGINEE3028703/21/2023
NEW YORK ENGINEERING ASSO851107/07/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY12/04/2025
DOB NOWStructuralPermit IssuedK.E.S CONSTRUCTION CO INC12/03/2025
DOB NOWGeneral ConstructionPermit IssuedK.E.S CONSTRUCTION CO INC11/27/2025
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC11/13/2025
DOB NOWSuspended ScaffoldPermit IssuedK.E.S. CONSTRUCTION CO IN11/12/2025
DOB NOWGeneral ConstructionSigned-offJDM CONTRACTING SERVICES04/24/2025
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC01/24/2025
DOB NOWPlumbingPermit IssuedA&H PLUMBING,LLC10/30/2024
DOB NOWGeneral ConstructionSigned-offPYRAMID RESTORATION NY LL10/04/2024
DOB NOWSprinklersSigned-offUNIVERSAL FIRE SPR LLC07/01/2024
DOB NOWPlumbingSigned-offPRACTICAL PLBG & HTG INC05/15/2024
DOB NOWGeneral ConstructionSigned-offMAGIC RENOVATIONS CORP05/07/2024
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC01/29/2024
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY01/19/2024
DOB NOWPlumbingSigned-offARIEL SERVICES INC10/20/2023
DOB NOWGeneral ConstructionSigned-offPYRAMID RESTORATION NY LL08/21/2023
DOB NOWBoiler EquipmentSigned-offCAM ENERGY HTG AND MECH04/21/2023
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC02/14/2023
DOB NOWSprinklersSigned-offSTANDARD FIRE SUPP CORP11/04/2022
DOB NOWGeneral ConstructionSigned-offPYRAMID RESTORATION NY LL08/17/2022
DOB NOWPlumbingPermit IssuedARIEL SERVICES INC05/24/2022
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC02/22/2022
DOB NOWPlumbingPermit IssuedG.B. & SON, INC11/10/2021
DOB NOWPlumbingPermit IssuedG.B. & SON, INC10/13/2021
DOB NOWPlumbingSigned-offSYSTEMS 2000 PLBG SVCS LL08/05/2021
DOB NOWPlumbingSigned-offSYSTEMS 2000 PLBG SVCS LL03/29/2021
DOB NOWPlumbingSigned-offSYSTEMS 2000 PLBG SVCS LL01/14/2021
DOB NOWPlumbingSigned-offSYSTEMS 2000 PLBG SVCS LL01/14/2021
DOB NOWPlumbingPermit IssuedG.B. & SON, INC10/01/2020
DOB NOWMechanical SystemsSigned-offARISTON CHIMNEY LLC07/08/2020
BISOTISSUEDSYSTEMS 2000 PLUMBING SER02/24/2021
BISSPISSUEDPRECISION PLBG SVCS., INC06/08/2017
BISOTISSUEDAMERICAN C CONST INC04/28/2017
BISPLISSUEDINNOVATIVE HEATING SOLUTI04/19/2017
BISOTISSUEDJDM CONTRACTING SERVICES03/16/2017
BISPLISSUEDWILLIAM J. CORCORAN,INC01/13/2017
BISOTISSUEDAMERICAN C CONST INC12/07/2016
BISPLISSUEDM C M PLBG & HTG, INC12/01/2016
BISOTISSUEDJDM CONTRACTING SERVICES11/22/2016
BISEQISSUEDEVEREST SCAFFOLDING INC10/04/2016
+ 40 more permits on file
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
02/04/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/04/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
11/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/26/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/08/2023Pass-Final Boiler Equipment InspectionPassView ↗
03/01/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
11/21/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
07/10/2026Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
07/10/2026Post-installed AnchorsMAHFUZAR RAHMANspecial
07/02/2026Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
07/02/2026Post-installed AnchorsMAHFUZAR RAHMANspecial
06/27/2025PreliminaryMichael Notaroprogress
06/26/2025Structural Steel - DetailsEUGENE BIFULCOspecial
06/26/2025FinalMichael Notaroprogress
06/26/2025Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
06/26/2025MasonryEUGENE BIFULCOspecial
06/26/2025Post-installed AnchorsEUGENE BIFULCOspecial
06/26/2025Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
06/26/2025Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
06/26/2025MasonryEUGENE BIFULCOspecial
06/26/2025Post-installed AnchorsEUGENE BIFULCOspecial
06/26/2025Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
06/26/2025FinalMichael Notaroprogress
06/26/2025Fire-Resistance Rated ConstructionMichael Notaroprogress
06/26/2025PreliminaryMichael Notaroprogress
06/10/2024Fire-Resistant Penetrations and Joints—special
02/22/2024Fire-Resistant Penetrations and JointsJohn Kimspecial
02/15/2024Lighting in dwelling unitsJohn Kimenergy_progress
02/15/2024Fire-Resistant Penetrations and JointsJohn Kimspecial
02/15/2024FinalJohn Kimprogress
10/31/2023Sprinkler SystemsBRIAN O'ROURKEspecial
10/31/2023Tenant Protection Plan ComplianceBRIAN O'ROURKEspecial
Latest 25 of 43.
▾Documents — 486 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch18
09/03/2026M00625429-I1Request digital key ↗
09/02/2026M00768086-I1Request digital key ↗
09/02/2026M00768086-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Plumbing11
09/03/2026M00377960-P5Request digital key ↗
09/03/2026M00377960-I1Request digital key ↗
09/03/2026M00377960-P3Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00361773-I1Request digital key ↗
▸Applications & Permits84
▸BISPLAN / WORK APPROVAL APPLICATION45
02/10/2021140993281Open ↗
12/24/2020140993281Open ↗
07/21/2017122855963Open ↗
Showing 3 of 45 on file for this type
▸BISWORK PERMIT APPLICATION39
02/24/2021140993281Open ↗
05/09/2017122951886Open ↗
04/27/2017122951886Open ↗
Showing 3 of 39 on file for this type
▸Seals & Professional Certifications123
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION47
06/12/2018120669437Open ↗
06/12/2018120669437Open ↗
06/12/2018120669437Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
09/03/2026M00625888-I1Open ↗
09/03/2026M00625429-I1Open ↗
09/03/2026M00430148-P4Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/26/2026M01247812-S1Open ↗
09/24/2026M01314638-P1Open ↗
09/24/2026M01314638-P1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
11/29/2016122913721Open ↗
08/22/2016122855963Open ↗
08/12/2016122855963Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
11/29/2016122913721Open ↗
05/12/2016122722642Open ↗
04/14/2016122754652Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/26/2026M01247812-S1Open ↗
09/18/2026M01247812-I1Open ↗
08/30/2026M01004122-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/24/2020140993281Open ↗
10/13/2015140415584Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/13/2015140415584Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/24/2020140993281Open ↗
▸Trade Schedules & Equipment26
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE15
07/21/2017122855963Open ↗
07/21/2017122855963Open ↗
12/28/2016122855963Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Safety & Tenant Protection19
▸DOB NOWTenant Protection Plan12
08/13/2026M00377960-P4Open ↗
08/13/2026M00377960-P5Open ↗
08/13/2026M00430148-P3Open ↗
Showing 3 of 12 on file for this type
▸BISTenant Protection Plan and Notes6
12/01/2016122951886Open ↗
11/29/2016122913721Open ↗
08/22/2016122855963Open ↗
Showing 3 of 6 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
02/24/2021140993281Open ↗
▸Environmental & Asbestos45
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
09/03/2026M00625429-I1Open ↗
09/03/2026M00430148-P4Open ↗
09/03/2026M00430148-P3Open ↗
Showing 3 of 24 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
12/24/2020140993281Open ↗
12/08/2016122951886Open ↗
11/29/2016122913721Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance27
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
03/15/2018120910238Open ↗
03/15/2018120910238Open ↗
10/03/2017122855963Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
03/15/2018120910238Open ↗
10/03/2017122855963Open ↗
07/06/2017122545727Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
02/08/2024140993281Open ↗
02/08/2024140993281Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/24/2020140993281Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/13/2015140415584Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/24/2020140993281Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00768086-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY3
01/27/2021140993281Open ↗
12/24/2020140993281Open ↗
10/13/2015140415584Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
02/09/2024140993281Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/09/2024140993281Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
02/08/2024140993281Open ↗
▸Approvals, Objections & Sign-offs32
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
02/09/2024140993281Open ↗
06/12/2018120669437Open ↗
03/15/2018120910238Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/18/2016140415584Open ↗
07/14/2016122638850Open ↗
▸BISSUPERSEDING LETTER1
04/27/2017122951886Open ↗
▸BISFINAL1
02/09/2024140993281Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership40
▸BISCOST AFFIDAVIT37
01/27/2021140993281Open ↗
06/12/2018120669437Open ↗
03/15/2018120910238Open ↗
Showing 3 of 37 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/08/2024140993281Open ↗
▸Filing & Intake Forms40
▸BISEFILING COVER SHEET18
12/01/2016122951886Open ↗
11/29/2016122913721Open ↗
08/12/2016122855963Open ↗
Showing 3 of 18 on file for this type
▸BISADDITIONAL INFORMATION15
02/22/2021140993281Open ↗
02/22/2021140993281Open ↗
02/19/2021140993281Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM4
06/12/2018120669437Open ↗
03/15/2018120910238Open ↗
10/17/2017140415584Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
12/24/2020140993281Open ↗
10/13/2015140415584Open ↗
Showing 2 of 3 on file for this type
▸Other Documents14
▸DOB NOWCalculations4
08/21/2026M01314638-I1Open ↗
08/15/2026M01314638-P1Open ↗
08/13/2026M01314638-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications3
08/15/2026M01314638-P1Open ↗
08/13/2026M00968047-I1Open ↗
08/13/2026M01314638-I1Open ↗
▸DOB NOWDHCR Document2
08/13/2026M00430148-P1Open ↗
08/13/2026M00430148-I1Open ↗
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
10/13/2015140415584Open ↗
▸BISSupporting Document: Fee Exempt1
11/29/2016122913721Open ↗
▸BISSupporting Document: Fee Deferment1
03/04/2016120910238Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M01247812-S1Open ↗