← Back
BuildNYC
Elevator apt, fireproof without stores
120 EAST 123RD STREET
MANHATTAN · BIN 1054420
💬 Discuss this project
1970Year Built
6Stories
D3Building Class
R7BZoning
43,026 sfGross Floor Area
36Units
LL97 CoveredRent Stabilized0 Active Violations 6 likely answered ▸FISP: SAFE
Elevator apt, fireproof without stores · Owner of record: Pact Renaissance Collaborative · 16,904 sf lot · 2.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPlumbing work and renovation20p · 2 filings · 20 docs
Floor 6Plumbing work and renovation20p · 3 filings · 20 docs
Floor 5Plumbing work and renovation19p · 2 filings · 20 docs
Floor 4Plumbing work and renovation20p · 2 filings · 20 docs
Floor 3Plumbing work and renovation20p · 2 filings · 20 docs
Floor 2Plumbing work and renovation26p · 3 filings · 20 docs
Floor 1Plumbing work and renovation23p · 2 filings · 20 docs
CellarBoiler system replacement23p · 4 filings · 20 docs
Site & exteriorTemporary heavy duty sidewalk shed installation7p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority1103/21/2026
Pact Renaissance Collaborative1003/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Dagher Engineering1811/22/2024
Syed Engineering210/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning3603/21/2026
Consolidated Scaffold Bridge203/21/2026
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dual Fuel Plumbing & Heatingspecialty_contractor1207/08/2026
M Bhuiyan ConstructionGeneral Contractor403/21/2026
Consolidated ScaffoldingScaffold204/09/2026
Kaj NY ConstructionScaffold107/08/2026
A & E PlumbingPlumbing107/08/2026
Monadnock ConstructionGeneral Contractor103/21/2026
Pioneer General ConstructionGeneral Contractor103/21/2026
Anthony PataneGeneral Contractor106/11/1999
Daffodil Gene ContractingGeneral Contractor109/23/2003
Lilly ConstructionGeneral Contractor108/02/2002
Maximum MechanicalPlumbing106/11/1999
Pyramid Etc CompaniesGeneral Contractor311/08/2023
SSN General ConstructionGeneral Contractor108/04/1998
SSN General ConstructionPlumbing108/04/1998
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. Hamdi Gunal, PE30001303/20/2024
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
07/26/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · closed
07/08/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · closed
07/08/2026
§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY…
HPD violation · closed
07/04/2026
§ 27-2005, 27-2007, 27-2041.1 hmc, §238, § 309; § 107 (2) ( c) mdl and 28 rcny §25-171: replace or repair the self-closing doors that is missing or…
HPD violation · closed
230 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offDual Fuel Plumbing & Heating05/30/2024
DOB NOWPlumbingSigned-offA & E Plumbing02/20/2024
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating02/13/2024
DOB NOWMechanical SystemsSigned-offPyramid Etc Companies11/27/2023
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding10/04/2022
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating09/30/2022
DOB NOWBoiler EquipmentSigned-offDual Fuel Plumbing & Heating09/30/2022
DOB NOWSupported ScaffoldPermit IssuedKaj NY Construction01/06/2022
DOB NOWMechanical SystemsSigned-offDual Fuel Company11/16/2021
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding10/13/2021
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating09/21/2021
DOB NOWBoiler EquipmentSigned-offDual Fuel Plumbing & Heating09/21/2021
DOB NOWMechanical SystemsSigned-offDual Fuel Company08/13/2021
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating08/05/2021
DOB NOWBoiler EquipmentSigned-offDual Fuel Plumbing & Heating06/29/2021
BISOTISSUEDPyramid Etc Companies11/08/2023
BISOTISSUEDMonadnock Construction11/07/2023
BISOTISSUEDMonadnock Construction11/17/2022
BISOTISSUEDPyramid Etc Companies06/29/2022
BISOTISSUEDMonadnock Construction02/04/2022
BISOTISSUEDPyramid Etc Companies10/05/2021
BISEQISSUEDM. Bhuiyan Construction04/14/2016
BISEQISSUEDM. Bhuiyan Construction04/12/2016
BISEQISSUEDM. Bhuiyan Construction04/12/2016
BISOTISSUEDM. Bhuiyan Construction04/12/2016
BISOTISSUEDM. Bhuiyan Construction06/10/2015
BISOTISSUEDM. Bhuiyan Construction06/03/2015
BISEQISSUEDM. Bhuiyan Construction05/14/2015
BISEQISSUEDM. Bhuiyan Construction05/12/2015
BISEQISSUEDM. Bhuiyan Construction05/07/2015
BISEQISSUEDPioneer General Construction03/01/2007
BISEQISSUEDDaffodil Gene Contracting09/23/2003
BISEQISSUEDLilly Construction08/02/2002
BISFSISSUEDEfficient Comb & Cooling04/26/2000
BISFSISSUEDEfficient Comb & Cooling12/28/1999
BISPLRE-ISSUEDMaximum Mechanical06/11/1999
BISOTISSUEDAnthony Patane06/11/1999
BISPLISSUEDNationwide Mechanical08/04/1998
BISOTRE-ISSUEDSSN General Construction08/04/1998
4 projects · most recent 11/16/2021
Boiler Controls
FiledStatusContractorScope
11/16/2021CompleteItkin ElectricBoiler Controls
10/18/2021Permit IssuedStar Electrical Contractors—
10/08/2021CompleteV. Vass Electric—
08/04/2021Permit IssuedRobert Chimenti—
1 project · most recent 10/11/2021
Scaffold
FiledStatusContractorScope
10/11/2021Permit IssuedKaj NY ConstructionScaffold
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/18/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/31/2024Pass-Final Boiler Equipment InspectionPassView ↗
03/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/01/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/21/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
08/31/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2023Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
11/22/2024HVAC-R and service water piping design and insulationMehmet Gunalenergy_progress
11/21/2024HVAC-R and service water piping design and insulationMehmet Gunalenergy_progress
09/20/2024HVAC-R and service water piping design and insulationMehmet Gunalenergy_progress
03/20/2024Energy Code Compliance InspectionsMehmet Gunalprogress
03/20/2024Maintenance informationMehmet Gunalenergy_progress
03/20/2024HVAC insulation and sealing Mehmet Gunalenergy_progress
03/20/2024Fire-Resistant Penetrations and JointsMehmet Gunalspecial
02/06/2024HVAC insulation and sealing Mehmet Gunalenergy_progress
02/06/2024Maintenance informationMehmet Gunalenergy_progress
02/06/2024Fire-Resistant Penetrations and JointsMehmet Gunalspecial
02/06/2024Energy Code Compliance InspectionsMehmet Gunalprogress
01/29/2024Fire-Resistant Penetrations and JointsMehmet Gunalspecial
01/29/2024HVAC and service water heating system controls Mehmet Gunalenergy_progress
01/29/2024Maintenance informationMehmet Gunalenergy_progress
01/29/2024HVAC and service water heating equipment Mehmet Gunalenergy_progress
01/29/2024Heating SystemsMehmet Gunalspecial
01/24/2024HVAC-R and service water piping design and insulationMehmet Gunalenergy_progress
01/08/2024HVAC-R and service water piping design and insulationMehmet Gunalenergy_progress
09/05/2023Fire-Resistant Penetrations and JointsMehmet Gunalspecial
09/05/2023Energy Code Compliance InspectionsMehmet Gunalprogress
09/05/2023HVAC insulation and sealing Mehmet Gunalenergy_progress
09/05/2023Maintenance informationMehmet Gunalenergy_progress
09/05/2023Fire-Resistant Penetrations and JointsMehmet Gunalspecial
09/05/2023Heating SystemsMehmet Gunalspecial
09/05/2023HVAC and service water heating system controls Mehmet Gunalenergy_progress
Latest 25 of 52.
290 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account