Elevator apt, semi-fireproof without stores
The Darome
120 EAST 144 STREET · Concourse-Concourse Village · BIN 2130961
💬 Discuss this project
2024Year Built
13Stories
D1Building Class
M1-4/R8AZoning
366,596 sfGross Floor Area
452Units
LL97 Covered1 Open Violation ▸
Elevator apt, semi-fireproof without stores · Owner of record: 120 EAST 144 OWNER LLC · 44,541 sf lot · 8.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Roof4p · 4 filings
Floor 21p · 1 filing
Floor 11p · 1 filing
Cellar1 filing
Site & exterior4 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BESYATA INVESTMENT GROUP6007/08/2026
OWNERS REP1707/08/2026
120 EAST 144103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/30/2022$41.5M—TORI REALTY CORP → 120 EAST 144 LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES2403/21/2026
AE DESIGN SOLUTION1803/21/2026
A1 EXPEDITING SERVICE1003/21/2026
HOWARD I SHAPIRO ASSOCIATES403/21/2026
HIERARCH-E403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ON STAR MANAGEMENT LLCGeneral Contractor2607/08/2026
S&E BRIDGE & SCAFFOLD LLC.General Contractor1707/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor1507/08/2026
HERSHEL ELBAUMElectrical703/21/2026
SAFETY FIRE SPRINKLER CORPFire Protection607/08/2026
YNH CONSTRUCTION NY LLCGeneral Contractor303/21/2026
KMI INCGeneral Contractor207/08/2026
O'LEARY CONSTRUCTION INCGeneral Contractor203/21/2026
A. M. PLUMBING COMPANYPlumbing107/08/2026
NEWGRANGE ELECTRIC, INCElectrical103/22/2026
STAR ELEC'L CONTRACTORS CElectrical103/22/2026
CAPITAL CONCRETE NY INCGeneral Contractor107/08/2026
COSTELLO CONSTRUCTION GROGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161707/16/2026
BIG APPLE GROUP NY A RMA9168108/17/2023
A&B WORLD CONSULTING, INC5704302/09/2023
Building Lifecycle
All (267)Filed (46)Permit Issued (43)Signed Off (25)Violation (31)Inspection (25)Objection (64)Special Inspection (30)Tax Incentive (3)
07/16/2026
Filed — New Building
Support of Excavation application filed subsequent to NB GC, job number: X00648530-I1.
X00648530-A6
07/06/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/06/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
07/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
07/06/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
FAHAD FATEH
07/06/2026
Special inspection requirement — Luminous Exit Path Markings
FAHAD FATEH
07/06/2026
Special inspection requirement — Air barrier continuity plan testing
FAHAD FATEH
07/06/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
07/06/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
07/06/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
07/06/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
07/06/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
07/06/2026
Special inspection requirement — Metering
FAHAD FATEH
07/06/2026
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
07/06/2026
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
07/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
07/06/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
07/06/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
07/06/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
07/06/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
08/18/2025
Violation issued (ECB, closed)
Unknown
08/04/2025
Objection resolved — Addressed
06/09/2025
Objection raised — Other
05/27/2025
Objection resolved — Addressed
05/27/2025
Objection resolved — Addressed
05/21/2025
Objection raised — Admin
05/21/2025
Objection raised — Energy
05/05/2025
Filed — New Building
Support of Excavation application filed subsequent to NB GC, job number: X00648530-I1.
X00648530-A4
04/29/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
04/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/29/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
04/29/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
04/29/2025
Special inspection requirement — Luminous Exit Path Markings
FAHAD FATEH
04/29/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
04/29/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
FAHAD FATEH
04/29/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
04/29/2025
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
01/22/2025
Signed off — New Building
Support of Excavation application filed subsequent to NB GC, job number: X00648530-I1.
X00648530-S9
01/16/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/13/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/31/2024
Signed off — New Building
Support of Excavation application filed subsequent to NB GC, job number: X00648530-I1.
X00648530-Z1
12/31/2024
Signed off — New Building
Support of Excavation application filed subsequent to NB GC, job number: X00648530-I1.
X00648530-S7
12/12/2024
Filed — New Building
Support of Excavation application filed subsequent to NB GC, job number: X00648530-I1.
X00648530-A3
12/09/2024
Signed off — New Building
Support of Excavation application filed subsequent to NB GC, job number: X00648530-I1.
X00648530-Z2
12/06/2024
Signed off — New Building
Support of Excavation application filed subsequent to NB GC, job number: X00648530-I1.
X00648530-S8
12/03/2024
Signed off — New Building
Support of Excavation application filed subsequent to NB GC, job number: X00648530-I1.
X00648530-Z3
12/01/2024
421-a(16) construction completed
11/27/2024
Signed off — New Building
Support of Excavation application filed subsequent to NB GC, job number: X00648530-I1.
X00648530-S4
11/25/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/14/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/13/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/12/2024
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
11/12/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/12/2024
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
11/12/2024
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
11/11/2024
Signed off — New Building
Support of Excavation application filed subsequent to NB GC, job number: X00648530-I1.
X00648530-S5
11/08/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/06/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 267 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offON STAR MANAGEMENT LLC09/26/2024
DOB NOWCurb CutSigned-offON STAR MANAGEMENT LLC09/26/2024
DOB NOWMechanical SystemsSigned-offON STAR MANAGEMENT LLC09/26/2024
DOB NOWMechanical SystemsSigned-offON STAR MANAGEMENT LLC09/26/2024
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC08/30/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC08/19/2024
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC08/15/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/15/2024
DOB NOWGeneral ConstructionPermit IssuedON STAR MANAGEMENT LLC08/13/2024
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP05/21/2024
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP05/21/2024
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP05/21/2024
DOB NOWProtection and Mechanical MethodsSigned-offKMI05/16/2024
DOB NOWProtection and Mechanical MethodsSigned-offKMI04/18/2024
DOB NOWGeneral ConstructionPermit IssuedON STAR MANAGEMENT LLC04/04/2024
DOB NOWStructuralSigned-offON STAR MANAGEMENT LLC03/08/2024
DOB NOWFoundationSigned-offON STAR MANAGEMENT LLC03/08/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC03/04/2024
DOB NOWPlumbingSigned-offA. M. PLUMBING COMPANY02/22/2024
DOB NOWSupport of ExcavationSigned-offON STAR MANAGEMENT LLC01/25/2024
DOB NOWEarth WorkSigned-offON STAR MANAGEMENT LLC01/23/2024
DOB NOWSupport of ExcavationSigned-offON STAR MANAGEMENT LLC01/23/2024
DOB NOWConstruction FenceSigned-offON STAR MANAGEMENT LLC01/23/2024
DOB NOWSidewalk ShedSigned-offS&E BRIDGE & SCAFFOLD LLC12/05/2023
DOB NOWConstruction FenceSigned-offS&E BRIDGE & SCAFFOLD LLC12/04/2023
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP11/30/2023
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC09/27/2023
DOB NOWConstruction FenceSigned-offS&E BRIDGE & SCAFFOLD LLC09/27/2023
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC09/27/2023
DOB NOWSidewalk ShedSigned-offS&E BRIDGE & SCAFFOLD LLC09/27/2023
DOB NOWConstruction FenceSigned-offYNH CONSTRUCTION NY LLC09/05/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC08/21/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/21/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC08/21/2023
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC05/09/2023
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC05/09/2023
DOB NOWGeneral ConstructionSigned-offO'LEARY CONSTRUCTION INC04/17/2023
DOB NOWSidewalk ShedSigned-offS&E BRIDGE & SCAFFOLD LLC03/02/2023
DOB NOWConstruction FenceSigned-offS&E BRIDGE & SCAFFOLD LLC03/01/2023
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP12/23/2022
+ 10 more permits on file
1 project · most recent 07/16/2026
Air Conditioning Systems Generators Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/16/2026Signed-offON STAR MANAGEMENT LLCAir Conditioning Systems, Generators, Heating and Air Conditioning Systems, Ventilation Systems
Generators
Gillette SPJD-2100-60 210 kW · Generator ×2
Cooling
Mitsubishi Electric PURY-EP96TNU-A1 12,000 BTU · Vrf Outdoor ×2
Heat / Cool
Amana HEH073H25 7,700 BTU · Heat Pump Outdoor ×523
HEH153H50 14,700 BTU · Heat Pump Outdoor ×439
HEH123H35 12,000 BTU · Heat Pump Outdoor ×54
Mitsubishi Electric PUHY-EP120TNU-A1 120,000 BTU · Vrf Outdoor ×7
MXZSM36NAM2-U1 36,000 BTU · Split System ×6
PUHY-EP96TNU-A1 192,000 BTU · Vrf Outdoor ×2
MXZSM48NAM 48,000 BTU · Split System ×1
PUHY-EP120TNU-A 120,000 BTU · Vrf Outdoor ×1
PUHY-EP144TNU-A1 144,000 BTU · Vrf Outdoor ×1
PUHY-EP96TNU-A 96,000 BTU · Vrf Outdoor ×1
Ventilation
Renewaire EV300 200 CFM · Erv ×2
HE2XRT 1,300 CFM · Erv ×2
HE1XINX 500 CFM · Erv ×1
1 project · most recent 07/16/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/16/2026Signed-offA. M. PLUMBING COMPANYGas, Storm, Water/Sanitary
8 projects · most recent 06/02/2026
General Wiring
FiledStatusContractorScope
06/02/2026Permit IssuedMAN POWER ELECTRIC INC11 meters, 11 new_meters
06/18/2024Permit IssuedSTAR ELEC'L CONTRACTORS C—
05/01/2024CompleteMAN POWER ELECTRIC INC1 meters, 1 new_meters
04/15/2024CompleteMAN POWER ELECTRIC INCGeneral Wiring
08/22/2023CompleteSOLAS ELECTRICAL CORP—
08/22/2023CompleteSOLAS ELECTRICAL CORP—
04/10/2023CompleteNEWGRANGE ELECTRIC, INC—
03/02/2023CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 07/16/2026
Concrete Masonry
FiledStatusContractorScope
07/16/2026Signed-offON STAR MANAGEMENT LLCConcrete, Masonry
1 project · most recent 07/16/2026
Earthwork
FiledStatusContractorScope
07/16/2026Signed-offON STAR MANAGEMENT LLCEarthwork
▾Field Inspections (DOB CAP) — 25
DateTypeResultReport
01/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/13/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/25/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
11/14/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/13/2024Pass-Final Boiler Equipment InspectionPassView ↗
11/12/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
11/12/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/12/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
11/12/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
11/08/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
11/06/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/06/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/21/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
05/21/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
05/21/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
04/11/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
04/03/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/29/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/29/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/22/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/22/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/26/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/18/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/15/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/01/2023Pass-Final SP - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 123
DateRequirementInspectorRole
07/06/2026Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
07/06/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/06/2026Luminous Exit Path MarkingsFAHAD FATEHspecial
07/06/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
07/06/2026Exterior lighting powerFAHAD FATEHenergy_progress
07/06/2026MeteringFAHAD FATEHenergy_progress
07/06/2026Protection of exposed foundation insulationFAHAD FATEHenergy_progress
07/06/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
07/06/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
07/06/2026Fenestration areasFAHAD FATEHenergy_progress
07/06/2026Electrical motors and elevatorsFAHAD FATEHenergy_progress
07/06/2026Lighting controlsFAHAD FATEHenergy_progress
07/06/2026Maintenance informationFAHAD FATEHenergy_progress
07/06/2026Air barrier continuity plan testingFAHAD FATEHenergy_progress
07/06/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
07/06/2026Interior lighting powerFAHAD FATEHenergy_progress
07/06/2026Fenestration air leakageFAHAD FATEHenergy_progress
07/06/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
07/06/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
07/06/2026Wall Panels, Curtain Walls, and VeneersFAHAD FATEHspecial
04/29/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
04/29/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
04/29/2025Interior lighting powerFAHAD FATEHenergy_progress
04/29/2025Exterior lighting powerFAHAD FATEHenergy_progress
04/29/2025Maintenance informationFAHAD FATEHenergy_progress
Latest 25 of 123.
▾Documents — 303 on file (BIS + DOB NOW)
▸Plans & Drawings46
▸DOB NOWPlans/Sketch46
08/23/2026X08016261-P1Request digital key ↗
08/23/2026X08016261-I1Request digital key ↗
08/23/2026X08038364-I1Request digital key ↗
Showing 3 of 46 on file for this type
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION14
11/04/2024200437465Open ↗
10/15/2024240340546Open ↗
10/09/2024200437465Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWHPD - Permit Notice5
08/22/2026X00648530-I1Open ↗
08/22/2026X00648530-A6Open ↗
08/13/2026X00648530-I1Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
09/18/2024240340546Open ↗
01/04/2023240340546Open ↗
▸BISWORK PERMIT APPLICATION1
09/15/2017220613405Open ↗
▸Zoning, Tax Lot & Property Records17
▸DOB NOWZD1: DOB Zoning Diagram6
08/22/2026X00648530-A6Open ↗
08/13/2026X00648530-I1Open ↗
08/13/2026X00648530-A4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/22/2026X00648530-A6Open ↗
08/13/2026X00648530-I1Open ↗
08/13/2026X00648530-A4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWRestrictive Declaration/Easement 22
08/22/2026X00648530-I1Open ↗
08/22/2026X00648530-A6Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/22/2026X00648530-I1Open ↗
08/22/2026X00648530-A6Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00648530-I1Open ↗
▸Seals & Professional Certifications92
▸DOB NOWDPL-1: Design Professional Seal & Signature46
08/23/2026X08016261-I1Open ↗
08/23/2026X08016261-P1Open ↗
08/23/2026X00836463-I1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/23/2026X00648530-Z3Open ↗
09/23/2026X00648530-Z3Open ↗
09/01/2026X00648530-Z1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026X00648530-Z3Open ↗
08/30/2026X00648530-A4Open ↗
08/30/2026X00648530-A4Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
08/30/2017220613405Open ↗
08/30/2017220608670Open ↗
08/30/2017220608670Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
08/30/2017220613405Open ↗
08/30/2017220608670Open ↗
05/08/2017220595746Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
08/30/2017220613405Open ↗
08/30/2017220608670Open ↗
05/08/2017220595746Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/04/2023240340546Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/04/2023240340546Open ↗
▸Trade Schedules & Equipment9
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026X00648530-P1Open ↗
Showing 1 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/27/2018220608670Open ↗
08/30/2017220608670Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
09/27/2017220613405Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026X00648530-I1—
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist6
08/22/2026X00648530-A6Open ↗
08/13/2026X00648530-P9Open ↗
08/13/2026X00648530-P5Open ↗
Showing 3 of 6 on file for this type
▸BISTenant Protection Plan and Notes1
08/30/2017220608670Open ↗
▸BISBPP: STREET TREES SITE PLAN1
01/10/2023240340546Open ↗
▸BISSTREET TREE CHECKLIST1
01/04/2023240340546Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00648530-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00648530-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00648530-I1Open ↗
▸Environmental & Asbestos53
▸DOB NOWOER: Notice to Proceed28
08/22/2026X00648530-I1Open ↗
08/22/2026X00648530-A6Open ↗
08/22/2026X00648530-A6Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWOER: Notice of Satisfaction15
08/22/2026X00648530-I1Open ↗
08/22/2026X00648530-A6Open ↗
08/13/2026X00648530-A4Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026X08016261-I1Open ↗
08/23/2026X08016261-P1Open ↗
08/13/2026X08038364-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/05/2017220608670Open ↗
05/08/2017220595746Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
01/04/2023240340546Open ↗
09/20/2017220608670Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
12/03/2024240340546Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/30/2017220608670Open ↗
08/30/2017220608670Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT5
08/13/2026X00648530-P2Open ↗
08/13/2026X00648530-S2Open ↗
08/13/2026X00648530-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026X00648530-S2Open ↗
08/13/2026X00648530-S1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026X00648530-S1Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026X00648530-S1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/18/2024240340546Open ↗
05/07/2024240340546Open ↗
01/20/2023240340546Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
08/30/2017220613405Open ↗
08/30/2017220608670Open ↗
05/08/2017220595746Open ↗
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION4
10/29/2024240340546Open ↗
03/15/2024240340546Open ↗
01/10/2023240340546Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
08/30/2017220613405Open ↗
08/30/2017220608670Open ↗
05/08/2017220595746Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/04/2023240340546Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
01/04/2023240340546Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026X00871751-P1Open ↗
▸Other Documents23
▸DOB NOWSite Survey: Initial6
08/22/2026X00648530-A6Open ↗
08/13/2026X00648530-I1Open ↗
08/13/2026X00648530-P5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/22/2026X00648530-A6Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWProperty Ownership Certification6
08/22/2026X00648530-P1Open ↗
08/22/2026X00648530-A6Open ↗
08/22/2026X00648530-A4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026X00648530-S1Open ↗
08/13/2026X00648530-S2Open ↗
▸BISBPP: DOT PERMISSION TO MOVE FRANCHISE1
05/07/2024240340546Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00648530-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00648530-I1Open ↗