Roof3p · 2 filings · 20 docs
Architecture
Issued Permit Scope
General Construction
PROPOSED INTERIOR RENOVATION IN BASEMENT OF EXISTING 5 STORY BUILDING. INSTALL NEW H.V.A.C AND NEW VENTILATION SYSTEM. FLOORING, CEILING AND PAINTING THROUGHOUT, CONSTRUCTION AND MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
14 documents · 1 drawing sheet
STREET FRONT REPAIR WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
8 documents · 1 drawing sheet
Floor 36p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Plumbing application filed in conjunction to ALT II M00809507
On file for this project
4 documents
INTERIOR RENOVATION OF APARTMENTS 3A AND 3B AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
16 documents
Floor 2
Floor 1
Cellar3p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
INSTALL PEDICURE CHAIR IN BASEMENT OF THE EXISTING 5 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
6 documents
PROPOSED INTERIOR RENOVATION IN BASEMENT OF EXISTING 5 STORY BUILDING. INSTALL NEW H.V.A.C AND NEW VENTILATION SYSTEM. FLOORING, CEILING AND PAINTING THROUGHOUT, CONSTRUCTION AND MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
14 documents · 1 drawing sheet
Basement2p · 1 filing · 6 docs
Plumbing
INSTALL PEDICURE CHAIR IN BASEMENT OF THE EXISTING 5 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
Sub-Basement8p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
INSTALL PEDICURE CHAIR IN BASEMENT OF THE EXISTING 5 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
6 documents
PROPOSED INTERIOR RENOVATION IN BASEMENT OF EXISTING 5 STORY BUILDING. INSTALL NEW H.V.A.C AND NEW VENTILATION SYSTEM. FLOORING, CEILING AND PAINTING THROUGHOUT, CONSTRUCTION AND MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
14 documents
STREET FRONT REPAIR WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
8 documents
Site & exterior4p · 2 filings · 18 docs
ArchitectureEquipmentStructural
Issued Permit Scope
General Construction · Supported Scaffold
PROPOSED INTERIOR RENOVATION IN BASEMENT OF EXISTING 5 STORY BUILDING. INSTALL NEW H.V.A.C AND NEW VENTILATION SYSTEM. FLOORING, CEILING AND PAINTING THROUGHOUT, CONSTRUCTION AND MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
14 documents · 11 drawing sheets
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 3 drawing sheets