← Back
Elevator cooperative
Coop City
120 ERSKINE PLACE · BIN 2093857
💬 Discuss this project
1969Year Built
33Stories
D4Building Class
R6Zoning
5,541,031 sfGross Floor Area
4,470Units
LL97 CoveredRent Stabilized1,578 Open Violations 1,575 unresolved · 3 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · 1,952,770 sf lot · 2.84 FAR built · Flood zone X500
Locations of Work
Structural
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RIVERBAY5409/30/2026
XINOS CONSTRUCTION1807/08/2026
RIVERBAY HOUSING703/22/2026
RIVERBAY MANAGEMENT.403/22/2026
ROCK GROUP NY CORP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FL&M ENGINEERING DESIGN &INSPECTION108/18/2026
NY RESTORATION TECHNOLOGY CORP307/23/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XINOS CONSTRUCTION603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINOS CONSTRUCTION CORPGeneral Contractor907/08/2026
G. C. PLBG & HTG INCPlumbing203/22/2026
CEPRINE CONSTRUCTION INCGeneral Contractor109/30/2026
Building Lifecycle
All (90)Filed (5)Permit Issued (9)Signed Off (1)Facade (FISP) (15)Violation (60)
09/29/2026
Permit issued — Sidewalk Shed
X01431800-I1-SH
08/18/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01431800-I1
06/16/2026
Permit issued — Suspended Scaffold
X01403260-I1-SC
06/04/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
X01403260-I1
06/03/2026
Violation issued (HPD, closed)
B
02/18/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00118345-I1
11/28/2025
Violation issued (HPD, closed)
C
11/28/2025
Violation issued (HPD, closed)
B
11/28/2025
Violation issued (HPD, closed)
A
11/28/2025
Violation issued (HPD, closed)
B
11/28/2025
Violation issued (HPD, closed)
B
11/28/2025
Violation issued (HPD, closed)
C
11/28/2025
Violation issued (HPD, closed)
B
04/11/2025
Violation issued (HPD, open)
B
04/11/2025
Violation issued (HPD, closed)
C
04/11/2025
Violation issued (HPD, closed)
A
09/24/2024
Violation issued (HPD, closed)
A
09/24/2024
Violation issued (HPD, open)
B
09/24/2024
Violation issued (HPD, closed)
B
09/24/2024
Violation issued (HPD, closed)
B
09/24/2024
Violation issued (HPD, closed)
B
09/24/2024
Violation issued (HPD, closed)
B
08/18/2024
Violation issued (HPD, closed)
A
08/18/2024
Violation issued (HPD, open)
C
08/18/2024
Violation issued (HPD, closed)
B
08/18/2024
Violation issued (HPD, open)
B
08/18/2024
Violation issued (HPD, closed)
B
08/18/2024
Violation issued (HPD, open)
B
08/18/2024
Violation issued (HPD, closed)
B
08/18/2024
Violation issued (HPD, closed)
B
07/06/2024
Violation issued (HPD, open)
C
07/06/2024
Violation issued (HPD, open)
C
07/06/2024
Violation issued (HPD, closed)
B
07/06/2024
Violation issued (HPD, closed)
B
07/06/2024
Violation issued (HPD, closed)
B
07/06/2024
Violation issued (HPD, closed)
B
07/06/2024
Violation issued (HPD, closed)
B
07/06/2024
Violation issued (HPD, closed)
C
04/16/2024
Violation issued (HPD, closed)
A
01/31/2024
Violation issued (HPD, closed)
B
08/01/2023
Violation issued (HPD, open)
B
07/24/2023
Violation issued (HPD, closed)
B
07/24/2023
Violation issued (HPD, open)
B
05/12/2023
Violation issued (HPD, closed)
B
05/12/2023
Violation issued (HPD, closed)
B
05/12/2023
Violation issued (HPD, closed)
C
03/08/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
A
08/14/2021
Violation issued (HPD, open)
A
04/16/2021
Violation issued (HPD, closed)
A
03/24/2021
Violation issued (HPD, open)
B
03/24/2021
Violation issued (HPD, closed)
A
03/24/2021
Violation issued (HPD, open)
B
03/24/2021
Violation issued (HPD, closed)
C
03/24/2021
Violation issued (HPD, open)
B
03/24/2021
Violation issued (HPD, open)
B
01/12/2021
Cycle 9 facade report submitted
12/14/2020
Cycle 9 facade inspection completed
12/14/2020
Cycle 9 facade report signed — SAFE
07/16/2020
Cycle 8 facade report submitted
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedCEPRINE CONSTRUCTION INC09/29/2026
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTURAL PRESERVATION S06/16/2026
DOB NOWSupported ScaffoldPermit IssuedXINOS CONSTRUCTION CORP03/05/2020
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP02/14/2020
DOB NOWSupported ScaffoldPermit IssuedXINOS CONSTRUCTION CORP02/13/2020
DOB NOWSupported ScaffoldPermit IssuedXINOS CONSTRUCTION CORP07/22/2019
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP05/23/2019
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP02/14/2019
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP01/11/2019
BISOTISSUEDXINOS CONSTRUCTION CORP02/19/2020
BISOTISSUEDXINOS CONSTRUCTION CORP05/02/2019
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT08/07/2018
BISEQISSUEDROCK GROUP NY CORP05/23/2018
BISEQISSUEDRIVERBAY CORPORATION05/03/2018
BISOTISSUEDIRW RESTORATION CORP10/23/2017
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT08/14/2017
BISOTISSUEDIRW RESTORATION CORP06/21/2017
BISEQISSUEDROCK GROUP NY CORP06/07/2017
BISOTISSUEDIRW RESTORATION CORP06/05/2017
BISEQISSUEDRIVERBAY CORPORATION05/25/2017
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT08/11/2016
BISEQISSUEDRIVERBAY CORPORATION05/03/2016
BISOTISSUEDIRW RESTORATION CORP04/15/2016
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT09/14/2015
BISEQISSUEDRIVERBAY CORP11/06/2014
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT09/15/2014
BISEQISSUEDPERIMETER BRIDGE & SCAFFOLD07/25/2007
BISOTISSUEDPROTO CONSTRUCTION & DEVELOPMENT03/03/2006
BISEQISSUEDPROTO CONSTRUCTION & DEVELOPMENT02/28/2006
BISEQISSUEDRIVERBAY CORP01/20/2006
BISEQISSUEDRIVERBAY CORP01/20/2006
BISOTISSUEDPROTO CONSTRUCTION & DEVELOPMENT11/29/2005
BISEQISSUEDPROTO CONSTRUCTION & DEVELOPMENT07/22/2005
BISOTISSUEDPROTO CONSTRUCTION & DEVELOPMENT04/14/2005
BISEQISSUEDRIVERBAY CORP01/05/2005
BISEQISSUEDRIVERBAY CORP01/05/2005
BISOTISSUEDPROTO CONSTRUCTION & DEVELOPMENT05/07/2003
BISEQISSUEDRIVERBAY CORP02/26/2003
BISEQISSUEDRIVERBAY CORP02/26/2003
BISEQISSUEDPROTO CONSTRUCTION & DEVELOPMENT01/16/2003
+ 10 more permits on file
5 jobs · most recent 07/16/2026
FiledStatusContractorScope
07/16/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
10/31/2019Permit IssuedSTAR ELEC'L CONTRACTORS C—
05/23/2019Permit IssuedSTAR ELEC'L CONTRACTORS C—
05/23/2019Permit IssuedSTAR ELEC'L CONTRACTORS C—
01/10/2019Permit IssuedTOWER ELECTRIC INC.—
2 jobs · most recent 08/18/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
08/18/2026Permit IssuedCEPRINE CONSTRUCTION INCSidewalk Shed
07/22/2019Permit IssuedXINOS CONSTRUCTION CORPScaffold
1 job · most recent 06/04/2026
FiledStatusContractorScope
06/04/2026Permit IssuedSTRUCTURAL PRESERVATION S—
Nothing on file for this building.
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/26/2026X00118345-I1Request digital key ↗
08/15/2026X00118345-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/19/2026X01431800-I1Request digital key ↗
08/16/2026X01403260-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/26/2026X00197352-I1Request digital key ↗
▸Applications & Permits28
▸BISWORK PERMIT APPLICATION18
06/25/2019220414200Open ↗
05/02/2019220655976Open ↗
08/08/2018240072620Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
04/05/2019240251375Open ↗
03/25/2019220655976Open ↗
02/25/2019220655976Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications34
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
04/05/2019240251375Open ↗
02/25/2019220655976Open ↗
06/06/2017240184643Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
04/29/2019220655976Open ↗
02/25/2019220655976Open ↗
11/24/2017220474680Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
02/25/2019220655976Open ↗
05/24/2017220474680Open ↗
04/04/2016220524528Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
04/05/2019240251375Open ↗
06/06/2017240184643Open ↗
09/15/2014240072620Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026X00118345-I1Open ↗
08/19/2026X01431800-I1Open ↗
08/13/2026X00118345-P1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
04/05/2019240251375Open ↗
06/06/2017240184643Open ↗
09/15/2014240072620Open ↗
▸BISPC FULL REPORT1
07/23/2007210006321Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/23/2007210006321Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
06/06/2017240184643Open ↗
02/25/2019220655976Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/25/2019220655976Open ↗
08/21/2015220474680Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/23/2007210006321Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
02/25/2019220655976Open ↗
11/24/2017220474680Open ↗
08/21/2015220474680Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
06/06/2017240184643Open ↗
09/15/2014240072620Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/24/2017220474680Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/10/2020220655976Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/10/2020220655976Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
03/23/2022220414200Open ↗
03/23/2022220414200Open ↗
06/10/2020220655976Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
03/25/2022220414200Open ↗
06/10/2020220655976Open ↗
12/04/2017220474680Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER4
08/08/2018240072620Open ↗
05/29/2018240184643Open ↗
08/22/2016240072620Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/10/2020220655976Open ↗
▸BISSUPERSEDING LETTER1
06/13/2017220474680Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/23/2007210006321Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026X00197352-I1Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT5
04/05/2019240251375Open ↗
02/25/2019220655976Open ↗
11/24/2017220474680Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/10/2020220655976Open ↗
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET4
02/25/2019220655976Open ↗
04/04/2016220524528Open ↗
08/21/2015220474680Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
04/05/2019240251375Open ↗
06/06/2017240184643Open ↗
09/15/2014240072620Open ↗
▸BISADDITIONAL INFORMATION1
05/24/2017220474680Open ↗
▸BISBOROUGH INTAKE FORM1
11/24/2017220474680Open ↗
▸Other Documents3
▸DOB NOWBSA Meeting Minutes/BSA Resolution2
08/26/2026X00118345-I1Open ↗
08/13/2026X00118345-P1Open ↗
▸DOB NOWIRA Certification1
08/16/2026X01403260-I1Open ↗