← Back
BuildNYC
Elevator cooperative
Coop City
120 ERSKINE PLACE · Co-op City · BIN 2128824
💬 Discuss this project
1969Year Built
33Stories
D4Building Class
R6Zoning
5,541,031 sfGross Floor Area
4,470Units
LL97 CoveredRent Stabilized1,531 Active Violations 1,527 unresolved · 4 paperwork only ▸
Elevator cooperative · 1,952,770 sf lot · 2.84 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFacade restoration3p · 1 filing · 4 docs
Site & exteriorSidewalk shed installation5p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Owner of 99 Erskine Place203/22/2026
River103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY Restoration Technology207/22/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Xinos Construction403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Xinos ConstructionScaffold404/09/2026
R.C.M. ElectricElectrical103/21/2026
Building Lifecycle
08/12/2026
Elevator Category 1 inspection report filed
02/17/2026
Signed off — Alteration
X00158951-I1
11/18/2025
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LEAKY RADIATOR AT NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 13A, 13th…
HPD violation · closed
11/18/2025
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10SQ.FT ( BEHIND RADIATOR) AT NORTH WALL IN THE…
HPD violation · open
11/18/2025
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LEAKY RADIATOR AT NORTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 13A, 13th…
HPD violation · closed
73 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offXinos Construction02/13/2020
DOB NOWSupported ScaffoldSigned-offXinos Construction07/22/2019
DOB NOWSidewalk ShedSigned-offXinos Construction04/25/2019
BISOTISSUEDJVS Restoration06/20/2019
BISOTISSUEDJVS Restoration04/18/2019
BISOTISSUEDJVS Restoration12/15/2018
BISOTISSUEDJVS Restoration07/27/2018
BISOTISSUEDRiverbay02/28/2005
2 projects · most recent 06/14/2024
FiledStatusContractorScope
06/14/2024Permit IssuedR.C.M. Electric—
04/22/2019Permit IssuedTower Electric—
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
07/19/2019FinalHamidreza Saghariprogress
43 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account