Office with commercial, 7-19 stories
120 LEROY STREET
MANHATTAN · BIN 1010393
💬 Discuss this project
1920Year Built
9Stories
O6Building Class
M1-5Zoning
118,422 sfGross Floor Area
9Units
LL97 Covered4 Open Violations ▸FISP: SWARMP
Office with commercial, 7-19 stories · 13,157 sf lot · 9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Roof11p · 2 filings · 20 docs
Bulkhead4p · 1 filing · 20 docs
Floor 910p · 2 filings · 20 docs
Floor 82p · 1 filing · 20 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 37p · 2 filings · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 14p · 2 filings · 20 docs
Cellar7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WC 28 REALTY9707/08/2026
AP-TECH CONTRACTING407/08/2026
RELIABLE ENTERPRISES503/22/2026
ROYALTON REALTY ASSOCIATE103/22/2026
S&P GREENWOOD ASSOCIATES103/22/2026
ANDEN INTL CO103/22/2026
WEWORK103/22/2026
CENTAUR PROPERTIES603/21/2026
HKS CONSTRUCTION203/21/2026
B H B CONSTRUCTION303/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DVA Advisors1903/21/2026
RPO1603/21/2026
BAY RESTORATION1003/21/2026
ARCH-FORM DESIGN BUILD203/21/2026
LOMBARDO BUILDING CONSULTANTS403/21/2026
JP EXPEDITE203/21/2026
GLOBAL EXPEDITING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MANHATTAN CONSTRUCTORS*General Contractor1307/08/2026
OMUNDSEN CONSTRUCTION CORGeneral Contractor507/08/2026
AJC PLUMBING & HTG CORPPlumbing407/08/2026
BAY RESTORATION CORPGeneral Contractor307/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor303/21/2026
M&D FIRE SPRINKLER INCFire Protection307/08/2026
AP-TECH CONTRACTING CORPGeneral Contractor207/08/2026
BARONE STEEL INCGeneral Contractor203/21/2026
INTER CONNECTION ELETRICElectrical203/22/2026
CAD SIGNS NYCScaffold107/08/2026
PETER MILEVSKIElectrical103/21/2026
SHIMSHON FRIEDMANElectrical103/21/2026
BEST PLBG HTG & COOLINGFire Protection107/08/2026
CROSS CONSULTING INCGeneral Contractor107/08/2026
AMPERE ELECL SERVICES CORElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MOTTOLA RINI ENGINEERS, P3251708/20/2025
AA BUILDING & INSPECTION1519408/13/2025
HRF SERVICES CORP5616108/01/2024
C.M. TESTING LABORATORY,1352406/28/2022
NAVI STRUCTURAL ENGINEERI4624101/19/2022
RHL ENGINEERING, LLC712108/21/2020
Building Lifecycle
All (218)Filed (39)Permit Issued (32)Signed Off (21)Facade (FISP) (9)Violation (60)Inspection (13)Objection (14)Special Inspection (30)
05/11/2026
Signed off — Alteration
SPRINKLER WORK FILED HEREWITH AT 9TH FLOOR, ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00924645-S1
12/03/2025
Signed off — Alteration
SPRINKLER WORK FILED HEREWITH AT 9TH FLOOR, ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00924645-S7
11/24/2025
Signed off — Alteration
INSTALLATION AND USE OF TEMPORARY MINI CRANE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01246532-I1
11/18/2025
Signed off — Alteration
ELECTRIC MATERIAL HOIST
M01040673-I1
11/14/2025
Signed off — Alteration
M01047625-I1
11/05/2025
Signed off — Alteration
SPRINKLER WORK FILED HEREWITH AT 9TH FLOOR, ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00924645-S6
09/04/2025
Permit issued — Plumbing
M00924645-S6-PL
09/02/2025
Special inspection requirement — Public Assembly Emergency Lighting
Anthony Rini, III
08/27/2025
Signed off — Alteration
SPRINKLER WORK FILED HEREWITH AT 9TH FLOOR, ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00924645-I1
08/21/2025
Signed off — Alteration
SPRINKLER WORK FILED HEREWITH AT 9TH FLOOR, ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00924645-S8
08/21/2025
Signed off — Alteration
SPRINKLER WORK FILED HEREWITH AT 9TH FLOOR, ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00924645-S2
08/20/2025
Filed — Alteration
SPRINKLER WORK FILED HEREWITH AT 9TH FLOOR, ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00924645-P9
08/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
Anthony Rini, III
08/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Anthony Rini, III
08/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
Anthony Rini, III
08/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Anthony Rini, III
08/20/2025
Special inspection requirement — Maintenance information
Anthony Rini, III
08/20/2025
Special inspection requirement — Final
Anthony Rini, III
08/20/2025
Special inspection requirement — Mechanical Systems
Anthony Rini, III
08/15/2025
Filed — No Work
M01045457-P1
08/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Anthony Rini, III
08/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Anthony Rini, III
08/15/2025
Special inspection requirement — Maintenance information
Anthony Rini, III
08/15/2025
Special inspection requirement — Final
Anthony Rini, III
08/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
Anthony Rini, III
08/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
Anthony Rini, III
08/15/2025
Special inspection requirement — Emergency and Standby Power Systems (Generator)
Younes Abouyaala
08/15/2025
Special inspection requirement — Mechanical Systems
Anthony Rini, III
08/13/2025
Filed — Alteration
SPRINKLER WORK FILED HEREWITH AT 9TH FLOOR, ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00924645-P7
08/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Anthony Rini, III
08/13/2025
Special inspection requirement — Maintenance information
Anthony Rini, III
08/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Anthony Rini, III
08/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
Anthony Rini, III
08/13/2025
Special inspection requirement — Mechanical Systems
Anthony Rini, III
08/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
Anthony Rini, III
08/13/2025
Special inspection requirement — Final
Anthony Rini, III
08/11/2025
Special inspection requirement — Emergency and Standby Power Systems (Generator)
Younes Abouyaala
08/01/2025
Signed off — Alteration
LTERATION TYPE 3 - INSTALL SUPPORTED PIPE SCAFFOLDING AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
M01088391-I1
07/11/2025
Filed — Alteration
SPRINKLER WORK FILED HEREWITH AT 9TH FLOOR, ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00924645-P8
07/11/2025
Signed off — Alteration
SPRINKLER WORK FILED HEREWITH AT 9TH FLOOR, ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00924645-S4
07/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/07/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/01/2025
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY MINI CRANE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01246532-P1
06/27/2025
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY MINI CRANE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01246532-I1
06/27/2025
Permit issued — Suspended Scaffold
M01040673-I1-SC
06/27/2025
Permit issued — Protection and Mechanical Methods
M01246532-I1-PMM
06/26/2025
Permit issued — Structural
M00924645-S1-ST
06/26/2025
Permit issued — Plumbing
M00924645-S4-PL
06/25/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/24/2025
Special inspection requirement — Mechanical Systems
Anthony Rini, III
06/24/2025
Special inspection requirement — Maintenance information
Anthony Rini, III
06/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Anthony Rini, III
06/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
Anthony Rini, III
06/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
Anthony Rini, III
06/24/2025
Special inspection requirement — Final
Anthony Rini, III
06/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/06/2025
Signed off — Alteration
SPRINKLER WORK FILED HEREWITH AT 9TH FLOOR, ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00924645-S5
06/03/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/29/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/28/2025
Filed — Alteration
SPRINKLER WORK FILED HEREWITH AT 9TH FLOOR, ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00924645-P6
Latest 60 of 218 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAJC PLUMBING & HTG CORP09/04/2025
DOB NOWSuspended ScaffoldSigned-offBAY RESTORATION CORP06/27/2025
DOB NOWProtection and Mechanical MethodsSigned-offBARONE STEEL06/27/2025
DOB NOWStructuralSigned-offMANHATTAN CONSTRUCTORS*06/26/2025
DOB NOWPlumbingSigned-offAJC PLUMBING & HTG CORP06/26/2025
DOB NOWSidewalk ShedSigned-offBAY RESTORATION CORP05/20/2025
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC04/08/2025
DOB NOWGeneral ConstructionSigned-offMANHATTAN CONSTRUCTORS*01/27/2025
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC01/24/2025
DOB NOWGeneral ConstructionSigned-offMANHATTAN CONSTRUCTORS*11/20/2024
DOB NOWSuspended ScaffoldPermit IssuedBAY RESTORATION CORP10/16/2024
DOB NOWSupported ScaffoldSigned-offBAY RESTORATION CORP10/01/2024
DOB NOWMechanical SystemsSigned-offMANHATTAN CONSTRUCTORS*09/05/2024
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC08/30/2024
DOB NOWPlumbingSigned-offAJC PLUMBING & HTG CORP08/29/2024
DOB NOWBoiler EquipmentSigned-offNEW YORK HEATING CORP08/28/2024
DOB NOWGeneral ConstructionSigned-offOMUNDSEN CONSTRUCTION COR08/12/2024
DOB NOWSuspended ScaffoldSigned-offBAY RESTORATION CORP06/28/2024
DOB NOWStructuralSigned-offMANHATTAN CONSTRUCTORS*06/04/2024
DOB NOWPlumbingSigned-offAJC PLUMBING & HTG CORP05/14/2024
DOB NOWSidewalk ShedSigned-offBAY RESTORATION CORP05/14/2024
DOB NOWSuspended ScaffoldSigned-offBAY RESTORATION CORP05/08/2024
DOB NOWGeneral ConstructionSigned-offCHARLES TROIANO03/26/2024
DOB NOWGeneral ConstructionSigned-offMANHATTAN CONSTRUCTORS*01/25/2024
DOB NOWGeneral ConstructionSigned-offOMUNDSEN CONSTRUCTION COR01/08/2024
DOB NOWGeneral ConstructionSigned-offAP-TECH CONTRACTING CORP09/01/2022
DOB NOWStructuralSigned-offOMUNDSEN CONSTRUCTION COR05/18/2022
DOB NOWGeneral ConstructionSigned-offOMUNDSEN CONSTRUCTION COR05/18/2022
DOB NOWGeneral ConstructionSigned-offAP-TECH CONTRACTING CORP01/24/2022
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC01/24/2022
DOB NOWSprinklersSigned-offBEST PLBG HTG & COOLING08/25/2020
DOB NOWSignSigned-offSIGNS CAD CORP10/15/2018
BIS—ISSUEDMANHATTAN CONSTRUCTORS*06/24/2025
BISOTISSUEDI.M.P. PLG & HTG CORP09/13/2022
BIS—ISSUEDOMUNDSEN CONSTRUCTION COR05/21/2019
BISSPISSUEDMETRO FIRE PROTECTION INC08/28/2018
BISPLISSUEDNY PLUMBING & HEATING COR08/27/2018
BISOTISSUEDPAUL M MAINTENANCE INC08/16/2018
BISOTISSUEDWEWORK CONSTRUCTION LLC08/06/2018
BISMHISSUEDWEWORK CONSTRUCTION LLC08/06/2018
+ 42 more permits on file
1 project · most recent 08/20/2025
Cooling Towers Generators Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/20/2025Signed-offMANHATTAN CONSTRUCTORS*Cooling Towers, Generators, Heating and Air Conditioning Systems, Ventilation Systems
Cooling Tower
Baltimore Aircoil PT2-1212A-201/X 6,372,000 BTU · Cooling Tower ×2
Generators
Kohler 230R0Z281 230 kW · Generator ×2
Heat / Cool
Daikin RXYQ216AATJA 216,000 BTU · Vrf Outdoor ×3
REYQ72AATJA 72,000 BTU · Vrf Outdoor ×1
RXYQ120AATJA 120,000 BTU · Vrf Outdoor ×1
Climatemaster SEL024AGK 25,000 CFM · Wshp ×1
Dectron NC-Z-1V-CUCSM0-V 101,700 BTU · Heat Pump Outdoor ×1
Ventilation
Greenheck DGX=P116-H22-MF 4,200 CFM · Makeup Air ×1
1 project · most recent 08/20/2025
Sprinkler System
FiledStatusContractorScope
08/20/2025Signed-offM&D FIRE SPRINKLER INCSprinkler System
1 project · most recent 08/20/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/20/2025Signed-offAJC PLUMBING & HTG CORPGas, Storm, Water/Sanitary
13 projects · most recent 12/09/2025
General Wiring HVAC Wiring
FiledStatusContractorScope
12/09/2025CompleteINTER CONNECTION ELETRICGeneral Wiring
11/21/2025CompleteERNE VALLEY ELECTRICAL INGeneral Wiring
10/30/2025CompleteDENALI ELECTRIC CORPGeneral Wiring
01/20/2025CompleteERNE VALLEY ELECTRICAL INGeneral Wiring
11/06/2024Permit IssuedC.FALCO ELETL CONT CORPGeneral Wiring
08/26/2024Permit IssuedC.FALCO ELETL CONT CORPGeneral Wiring
05/15/2024CompleteINTER CONNECTION ELETRIC—
05/14/2024CompleteVERTEX ELECTRIC CORP.—
01/24/2022CompleteRICHARD NEU—
02/05/2021CompleteTOWER ELECTRIC INC.—
09/18/2020CompleteTOWER ELECTRIC INC.HVAC Wiring
12/28/2018CompleteMIKOMA ELECTRIC LLCGeneral Wiring
10/02/2018CompleteAMPERE ELECL SERVICES COR—
1 project · most recent 08/20/2025
Steel Concrete
FiledStatusContractorScope
08/20/2025Signed-offAJC PLUMBING & HTG CORPSteel, Concrete
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
07/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/25/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/29/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/30/2025Pass-Final Boiler Equipment InspectionPassView ↗
01/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/31/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/04/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
09/02/2025Public Assembly Emergency LightingAnthony Rini, IIIprogress
08/20/2025HVAC-R and service water heating system controlsAnthony Rini, IIIenergy_progress
08/20/2025Maintenance informationAnthony Rini, IIIenergy_progress
08/20/2025HVAC-R and service water piping design and insulationAnthony Rini, IIIenergy_progress
08/20/2025HVAC-R and service water heating equipmentAnthony Rini, IIIenergy_progress
08/20/2025Mechanical SystemsAnthony Rini, IIIspecial
08/20/2025Energy Code Compliance InspectionsAnthony Rini, IIIprogress
08/20/2025FinalAnthony Rini, IIIprogress
08/15/2025HVAC-R and service water piping design and insulationAnthony Rini, IIIenergy_progress
08/15/2025HVAC-R and service water heating system controlsAnthony Rini, IIIenergy_progress
08/15/2025Maintenance informationAnthony Rini, IIIenergy_progress
08/15/2025Energy Code Compliance InspectionsAnthony Rini, IIIprogress
08/15/2025FinalAnthony Rini, IIIprogress
08/15/2025Emergency and Standby Power Systems (Generator)Younes Abouyaalaspecial
08/15/2025Mechanical SystemsAnthony Rini, IIIspecial
08/15/2025HVAC-R and service water heating equipmentAnthony Rini, IIIenergy_progress
08/13/2025Maintenance informationAnthony Rini, IIIenergy_progress
08/13/2025HVAC-R and service water heating equipmentAnthony Rini, IIIenergy_progress
08/13/2025HVAC-R and service water piping design and insulationAnthony Rini, IIIenergy_progress
08/13/2025Mechanical SystemsAnthony Rini, IIIspecial
08/13/2025Energy Code Compliance InspectionsAnthony Rini, IIIprogress
08/13/2025FinalAnthony Rini, IIIprogress
08/13/2025HVAC-R and service water heating system controlsAnthony Rini, IIIenergy_progress
08/11/2025Emergency and Standby Power Systems (Generator)Younes Abouyaalaspecial
06/24/2025Energy Code Compliance InspectionsAnthony Rini, IIIprogress
Latest 25 of 67.
▾Documents — 1,022 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch34
09/06/2026M00082730-I1Request digital key ↗
09/03/2026M00635061-I1Request digital key ↗
09/03/2026M00666438-I1Request digital key ↗
Showing 3 of 34 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/27/2026M01045457-I1Request digital key ↗
08/27/2026M01045457-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00379440-I1Request digital key ↗
▸Applications & Permits189
▸BISPLAN / WORK APPROVAL APPLICATION116
11/26/2025123534407Open ↗
11/17/2025123534407Open ↗
06/23/2025123534407Open ↗
Showing 3 of 116 on file for this type
▸BISWORK PERMIT APPLICATION70
06/24/2025123534407Open ↗
09/14/2022121801540Open ↗
09/08/2022121801540Open ↗
Showing 3 of 70 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION3
03/09/2020121189365Open ↗
11/12/2019123534407Open ↗
Showing 2 of 3 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISVERIFY TAX LOT1
12/03/2025123534407Open ↗
▸Seals & Professional Certifications256
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION101
05/20/2020123534407Open ↗
02/26/2020121189365Open ↗
12/16/2019121189365Open ↗
Showing 3 of 101 on file for this type
▸DOB NOWProgress Inspector Seal & Signature35
09/28/2026M00082730-I1Open ↗
09/23/2026M00924645-P9Open ↗
09/23/2026M00924645-P9Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature34
09/04/2026M00379440-I1Open ↗
09/03/2026M00635061-I1Open ↗
09/03/2026M00666438-I1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
09/23/2026M00924645-S3Open ↗
09/23/2026M00924645-P9Open ↗
09/18/2026M00733251-P2Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment66
▸BISSCHEDULE B - PLUMBING16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSELF-CERT PLUMBING NOTICE13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISEQUIPMENT USE PERMITS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA9
08/07/2020123383141Open ↗
12/05/2019123176703Open ↗
Showing 2 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
07/05/2022121351722Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN BOILER VIOLATIONS1
09/15/2023121189365Open ↗
▸DOB NOWFDNY: Letter of No Objection1
08/13/2026M00924645-S4Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST4
11/18/2019121189365Open ↗
04/25/2019123534407Open ↗
Showing 2 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSITE SAFETY PLAN: BEST APPROVAL REQUIRED1
01/17/2025123534407Open ↗
▸Environmental & Asbestos59
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
09/04/2026M00379440-I1Open ↗
09/03/2026M00635061-I1Open ↗
09/02/2026M00733251-P1Open ↗
Showing 3 of 22 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)20
09/26/2019121189365Open ↗
05/21/2019123534407Open ↗
05/20/2019123534407Open ↗
Showing 3 of 20 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/22/2026M00924645-S1Open ↗
08/22/2026M00924645-S6Open ↗
▸Energy Compliance80
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS29
04/25/2019123534407Open ↗
Showing 1 of 29 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
12/15/2022121326537Open ↗
11/22/2021121801540Open ↗
Showing 2 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY14
12/02/2025123534407Open ↗
11/25/2025123534407Open ↗
11/24/2025123534407Open ↗
Showing 3 of 14 on file for this type
▸BISTR8: Energy Code Progress Inspections7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)5
01/06/2026123534407Open ↗
12/12/2022121326537Open ↗
09/19/2022121801540Open ↗
Showing 3 of 5 on file for this type
▸BISINTERIOR LIGHTING POWER2
12/16/2025123534407Open ↗
12/16/2025123534407Open ↗
▸BISEXTERIOR LIGHTING POWER2
12/16/2025123534407Open ↗
12/16/2025123534407Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
07/05/2022121351722Open ↗
12/20/2021121398996Open ↗
▸BISLIGHTING CONTROLS2
12/16/2025123534407Open ↗
12/16/2025123534407Open ↗
▸BIS* HVAC INSULATION AND SEALING1
07/05/2022121351722Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/20/2021121398996Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY17
09/08/2023123534407Open ↗
07/12/2023123534407Open ↗
08/31/2022110177399Open ↗
Showing 3 of 17 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
07/05/2022121351722Open ↗
12/20/2021121398996Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
09/13/2022110177399Open ↗
▸Approvals, Objections & Sign-offs98
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST48
09/20/2022121801540Open ↗
09/14/2022110177399Open ↗
12/27/2021121398996Open ↗
Showing 3 of 48 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE20
11/17/2025123534407Open ↗
11/20/2024123534407Open ↗
10/24/2024123534407Open ↗
Showing 3 of 20 on file for this type
▸BISADMINISTRATIVE OBJECTIONS18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
11/18/2019121189365Open ↗
09/26/2019121189365Open ↗
09/26/2019121189365Open ↗
Showing 3 of 9 on file for this type
▸BISSUPERSEDING LETTER1
06/24/2025123534407Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL1
07/05/2022121351722Open ↗
▸Cost, Insurance & Ownership73
▸BISCOST AFFIDAVIT67
12/10/2024123534407Open ↗
12/10/2024123534407Open ↗
11/15/2024123534407Open ↗
Showing 3 of 67 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
01/23/2026123534407Open ↗
09/19/2022121801540Open ↗
07/05/2022121351722Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/24/2025123534407Open ↗
▸Filing & Intake Forms105
▸BISEFILING COVER SHEET38
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 38 on file for this type
▸BISADDITIONAL INFORMATION35
05/02/2025123534407Open ↗
01/08/2025123534407Open ↗
02/10/2023121326537Open ↗
Showing 3 of 35 on file for this type
▸BISBOROUGH INTAKE FORM31
06/13/2025123534407Open ↗
10/26/2023121351722Open ↗
10/26/2023121351722Open ↗
Showing 3 of 31 on file for this type
▸BISeFiling Job Application Cover Sheet1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
08/12/2020121189365Open ↗
08/12/2020121189365Open ↗
08/12/2020121189365Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWManufacturer's Specifications3
08/25/2026M01040673-I1Open ↗
08/13/2026M01040673-P2Open ↗
08/13/2026M01040673-P1Open ↗
▸DOB NOWCalculations3
08/25/2026M01040673-I1Open ↗
08/13/2026M01040673-P1Open ↗
08/13/2026M01040673-P2Open ↗
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type