ECB10/20/2026At the time of inspection of an active 12 story building const site. Observed work contrary to the approved ssp. Ssp requires concrete barrier barricade at exposure #4; however, plastic barriers were installed$1K due
ECB10/16/2026At time of inspection, observed unsecured plywood formwork decking at the topmost working deck during a department issued 58 mph high-wind advisory, contrary to bc 3305.3.4, creating a hazard of plywood becomin$10K due
ECB10/16/2026At time of inspection, observed vertical safety netting not maintained loose and ripped netting, during a 58 mph weather advisory, contrary to bc 3308.5, creating a hazard of falling and flying materials striki$10K due
ECB10/16/2026At time of inspection, observed active jobsite. Upon request, no site safety manager was made available, contrary to bc 3310.5.2, creating a hazard due to lack of site safety monitoring. Stop all work under per$10K due
ECB10/16/2026At time of inspection, observed lack of guardrail systems around the access ladder opening, the only access point to the topmost working deck, contrary to bc 3308.7, creating a fall hazard to workers, visitors,$5K due
ECB11/29/2021BC3303.4.7 material storage not to code requirements.note at time of inspection i observed material storage over 3' exposed to the public. Remedy:comply w/ code- enclose storageNothing owed — awaiting certificate of correction