← Back
Elevator apt, semi-fireproof with stores
120 LIBERTY STREET
MANHATTAN · Financial District-Battery Park City · BIN 1001040
💬 Discuss this project
1900Year Built
13Stories
D7Building Class
C5-5Zoning
57,945 sfGross Floor Area
22Units
LL97 CoveredRent Stabilized7 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 120 LIBERTY STREET ASSOCIATES, LLC · 5,166 sf lot · 11.22 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction18p · 3 filings · 20 docs
Penthouse3p · 1 filing
Floor 123p · 2 filings · 20 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 32p · 1 filing · 19 docs
Floor 21p · 1 filing · 19 docs
Floor 1Under Construction37p · 4 filings · 20 docs
CellarUnder Construction37p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAMSON MANAGEMENT7909/15/2026
MIKE3307/08/2026
PRAT ENTERPRISES CORP903/22/2026
120 LIBERTY STREET5603/22/2026
ARNOLD GOLDSTEIN C/O 120103/22/2026
120 LIBERTY STREET FOUNDATIO1103/22/2026
HARDEE'S FOOD SYSTEM103/22/2026
120 LIBERTY ST.REALTY CO.203/22/2026
DEPT OF DESIGN CONSTRUCTION303/21/2026
47-50 41ST STREET ASSOCIATES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOXTON1003/21/2026
COSTA ARCHITECTURE & ENGINEERING LL3003/21/2026
LOUIS STRIAR1203/21/2026
PRAT ENTERPRISES203/21/2026
Rigid Structural Design, LLC403/21/2026
J CALLAHAN CONSULTING403/21/2026
HH BUILDING CONSULTING & ARCHITECTU203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRAT ENTERPRISES CORPGeneral Contractor903/21/2026
ATLANTIC PAINTING LLCGeneral Contractor807/08/2026
SIGNSTAR NYCScaffold407/08/2026
INTERSYSTEM INSTALLATIONGeneral Contractor407/08/2026
JOHN EVAN CONTRACTING CORGeneral Contractor404/09/2026
SERVICE TECH MECHANICAL *General Contractor303/21/2026
ABR PLBG&HTG CONTR INCPlumbing307/08/2026
HARRY'S CONTRACTING INCGeneral Contractor303/21/2026
HUDSON RIVER MECH GROUP IPlumbing207/08/2026
VLASHAVA ELEC CONTR'G CORElectrical203/22/2026
ZATOS PLBG AND HTG INCPlumbing107/08/2026
IMPACT PLUMBING INCPlumbing107/08/2026
NEW YORK PARK PLBG&HTG COPlumbing107/08/2026
ALLTYPE FIRE PROTECT LLCFire Protection107/08/2026
TAKOS AND K ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MCHENERY TESTING LAB9181904/03/2026
BAZINI ENGINEERING, P.C.1808212/08/2025
KZ ENGINEERING, P.C.4665108/02/2024
COSTA ARCHITECTS & ENGINE13211307/30/2024
CROSSCHECK INSPECTION SER544105/31/2024
PACE ENGINEERING P.C.1679105/31/2024
CHARLOTTE DEWALD ARCHITEC7939104/02/2024
Building Lifecycle
All (202)Filed (37)Permit Issued (29)Signed Off (18)Facade (FISP) (16)Violation (60)Inspection (10)Objection (2)Special Inspection (30)
07/17/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/10/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
04/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TREVOR O. FLOWERS
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TREVOR O. FLOWERS
04/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/03/2026
Filed — Alteration
Modification of existing sprinkler system on the first floor and cellar as per plans
M01326835-P5
03/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TREVOR O. FLOWERS
03/19/2026
Filed — Alteration
Modification of existing sprinkler system on the first floor and cellar as per plans
M01326835-P4
02/18/2026
Permit issued — Plumbing
M01326835-S1-PL
02/18/2026
Permit issued — Sprinklers
M01326835-S3-EW-SP
01/20/2026
Permit issued — General Construction
M01315506-S1-GC
01/20/2026
Permit issued — Boiler Equipment
M01315506-I1-BE
01/09/2026
Permit issued — Mechanical Systems
M01326835-S4-MS
01/09/2026
Permit issued — Mechanical Systems
M01326835-S2-MS
12/22/2025
Filed — Alteration
Modification of existing sprinkler system on the first floor and cellar as per plans
M01326835-S2
12/22/2025
Filed — Alteration
Modification of existing sprinkler system on the first floor and cellar as per plans
M01326835-S4
12/22/2025
Special inspection requirement — Heating Systems
TREVOR O. FLOWERS
12/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
TREVOR O. FLOWERS
12/17/2025
Filed — Alteration
Modification of existing sprinkler system on the first floor and cellar as per plans
M01326835-S1
12/17/2025
Filed — Alteration
Modification of existing sprinkler system on the first floor and cellar as per plans
M01326835-S3
12/17/2025
Special inspection requirement — Energy Code Compliance Inspections
TREVOR O. FLOWERS
12/15/2025
Special inspection requirement — Final
TREVOR O. FLOWERS
12/15/2025
Special inspection requirement — Mechanical Systems
TREVOR O. FLOWERS
12/11/2025
Permit issued — General Construction
M01326835-I1-GC
12/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
TREVOR O. FLOWERS
12/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
TREVOR O. FLOWERS
12/08/2025
Filed — Alteration
INSTALL MASONRY WALLS AROUND PROPOSED REPLACEMENT FUEL OIL STORAGE TANK IN CELLAR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01315506-I1
12/08/2025
Filed — Alteration
INSTALL MASONRY WALLS AROUND PROPOSED REPLACEMENT FUEL OIL STORAGE TANK IN CELLAR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01315506-S1
12/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Bazini
12/05/2025
Special inspection requirement — Final
TREVOR O. FLOWERS
12/05/2025
Special inspection requirement — Mechanical Systems
TREVOR O. FLOWERS
12/05/2025
Special inspection requirement — Sprinkler Systems
TREVOR O. FLOWERS
12/04/2025
Filed — Alteration
Modification of existing sprinkler system on the first floor and cellar as per plans
M01326835-I1
12/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
TREVOR O. FLOWERS
12/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TREVOR O. FLOWERS
12/01/2025
Special inspection requirement — Final
TREVOR O. FLOWERS
11/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
11/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
11/07/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Joseph Bazini
11/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
Joseph Bazini
11/07/2025
Special inspection requirement — Final
Joseph Bazini
07/14/2025
Signed off — Alteration
M01090406-I1
07/11/2025
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01099150-I1
07/11/2025
Signed off — Alteration
M01192449-I1
07/10/2025
Permit issued — Mechanical Systems
M00212574-I1-MS
05/28/2025
Permit issued — Plumbing
M00193506-I1-PL
05/05/2025
Cycle 9 facade report signed — SAFE
04/24/2025
Signed off — Alteration
FACADE REPAIRS TO COMPLY WITH LL11/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01039077-I1
04/15/2025
Cycle 9 facade report submitted
03/21/2025
Cycle 9 facade inspection completed
03/10/2025
Filed — Alteration
M01192449-I1
03/10/2025
Permit issued — Supported Scaffold
M01192449-I1-SF
01/21/2025
Signed off — Alteration
M01032429-S1
01/21/2025
Signed off — Alteration
M01032429-I1
12/10/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/02/2024
Permit issued — Plumbing
M01032429-S1-PL
09/09/2024
Signed off — Alteration
Plumbing work proposed for an existing apartment. No change to use, occupancy or egress.
M01018722-I1
Latest 60 of 202 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedZATOS PLBG AND HTG INC02/18/2026
DOB NOWSprinklersPermit IssuedALLTYPE FIRE PROTECT LLC02/18/2026
DOB NOWGeneral ConstructionPermit IssuedSERVICE TECH MECHANICAL *01/20/2026
DOB NOWBoiler EquipmentSigned-offSERVICE TECH MECH&PLBG IN01/20/2026
DOB NOWMechanical SystemsPermit IssuedJOHN EVAN CONTRACTING COR01/09/2026
DOB NOWMechanical SystemsPermit IssuedJOHN EVAN CONTRACTING COR01/09/2026
DOB NOWGeneral ConstructionPermit IssuedJOHN EVAN CONTRACTING COR12/11/2025
DOB NOWMechanical SystemsPermit IssuedJOHN EVAN CONTRACTING COR07/10/2025
DOB NOWPlumbingPermit IssuedHUDSON RIVER MECH GROUP I05/28/2025
DOB NOWSupported ScaffoldSigned-offPRAT ENTERPRISES CORP03/10/2025
DOB NOWPlumbingSigned-offIMPACT PLUMBING INC10/02/2024
DOB NOWGeneral ConstructionSigned-offATLANTIC PAINTING LLC09/04/2024
DOB NOWSidewalk ShedSigned-offPRAT ENTERPRISES CORP08/26/2024
DOB NOWGeneral ConstructionSigned-offPRAT ENTERPRISES CORP08/19/2024
DOB NOWSuspended ScaffoldSigned-offPRATT CONSTRUCTION & RES08/14/2024
DOB NOWPlumbingSigned-offNEW YORK PARK PLBG&HTG CO04/26/2024
DOB NOWGeneral ConstructionSigned-offHARRY'S CONTRACTING INC04/09/2024
DOB NOWPlumbingSigned-offABR PLBG&HTG CONTR INC06/07/2021
DOB NOWGeneral ConstructionSigned-offATLANTIC PAINTING LLC05/26/2021
DOB NOWGeneral ConstructionSigned-offATLANTIC PAINTING LLC05/07/2021
DOB NOWGeneral ConstructionSigned-offATLANTIC PAINTING LLC03/05/2021
DOB NOWPlumbingSigned-offABR PLBG&HTG CONTR INC02/25/2021
DOB NOWPlumbingSigned-offABR PLBG&HTG CONTR INC12/14/2020
DOB NOWSignSigned-offSIGNSTAR NYC09/23/2019
DOB NOWSignSigned-offSIGNSTAR NYC09/23/2019
DOB NOWSignSigned-offSIGNSTAR NYC09/20/2019
DOB NOWSignSigned-offSIGNSTAR NYC09/20/2019
DOB NOWPlumbingPermit IssuedHUDSON RIVER MECH GROUP I09/12/2019
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION11/16/2018
BIS—ISSUEDEURO GROUP DESIGN GROUP08/02/2022
BIS—ISSUEDEURO GROUP DESIGN GROUP08/12/2021
BISOTISSUEDATLANTIC PAINTING LLC12/28/2020
BIS—ISSUEDEURO GROUP DESIGN GROUP11/23/2020
BIS—ISSUEDEURO GROUP DESIGN GROUP02/07/2020
BISEQISSUEDINTERSYSTEM INSTALLATION02/11/2019
BIS—ISSUEDEURO GROUP DESIGN GROUP11/21/2018
BISOTISSUEDPRATT CONSTRUCTION & REST05/17/2018
BISEQISSUEDINTERSYSTEM S&S CORP01/31/2018
BISPLISSUEDABR PLBG&HTG CONTR INC12/21/2017
BIS—ISSUEDEURO GROUP DESIGN GROUP11/22/2017
+ 39 more permits on file
2 projects · most recent 04/03/2026
Air Conditioning Systems Ventilation Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
04/03/2026Permit IssuedJOHN EVAN CONTRACTING CORAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
United Cool Air VAR15G3A 213,000 BTU · Rooftop Unit ×1
VAR8G3A 101,000 BTU ×1
Heating
__Junk__ A1-D.250-15D 114,374 BTU · Makeup Air ×1
A2-D.250-20D 205,201 BTU · Makeup Air ×1
D76 40,852 BTU · Makeup Air ×1
Ventilation
__Junk__ SIF13DD 750 CFM · Exhaust Fan ×1
SIF15DD 2,000 CFM · Exhaust Fan ×1
SIF20DD 3,700 CFM · Exhaust Fan ×1
09/24/2019Permit IssuedJOHN EVAN CONTRACTING CORAir Conditioning Systems, Ventilation Systems
Cooling
United Cool Air VAR15G3A 213,000 BTU · Rooftop Unit ×1
VAR8G3A 101,000 BTU ×1
Ventilation
Captiveaire A1-D.250-15D 114,374 BTU · Makeup Air ×1
A2-D.250-20D 205,201 BTU · Makeup Air ×1
D76 40,852 BTU · Makeup Air ×1
SIF13DD 750 CFM · Exhaust Fan ×1
SIF15DD 2,000 CFM · Exhaust Fan ×1
SIF20DD 3,700 CFM · Exhaust Fan ×1
1 project · most recent 04/03/2026
FiledStatusContractorScope
04/03/2026Permit IssuedROLANDO FIRE SUPP MECH IN72 heads
2 projects · most recent 04/03/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/03/2026Permit IssuedZATOS PLBG AND HTG INCGas, Water/Sanitary
08/27/2019Permit IssuedHUDSON RIVER MECH GROUP IGas, Water/Sanitary
13 projects · most recent 03/11/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
03/11/2026Permit IssuedWCK ELECTRIC CORP.General Wiring
12/05/2025Permit IssuedWCK ELECTRIC CORP.General Wiring
09/12/2024CompleteVLASHAVA ELEC CONTR'G COR—
04/22/2024CompleteNY CITY ELECTRIC INC—
04/08/2024CompleteVLASHAVA ELEC CONTR'G COR—
08/29/2023CompleteTAKOS AND K ELECTRIC INCGeneral Wiring
04/11/2023Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
12/07/2021CompleteVLASHAVA ELEC CONTR'G COR—
03/12/2021CompleteVLASHAVA ELEC CONTR'G COR—
01/18/2021CompleteVLASHAVA ELEC CONTR'G COR—
07/26/2019Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
01/11/2018CompleteVLASHAVA ELEC CONTR'G COR—
12/26/2017CompleteTRIBORO ELEC'L CONTR'G COHVAC Wiring
1 project · most recent 11/15/2018
Scaffold
FiledStatusContractorScope
11/15/2018Signed-offINTERSYSTEM INSTALLATIONScaffold
2 projects · most recent 04/03/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
04/03/2026Permit IssuedZATOS PLBG AND HTG INCTenant Protection Plan 72 Hour
12/08/2025Signed-offSERVICE TECH MECH&PLBG INTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/17/2026Pass-Final Boiler Equipment InspectionPassView ↗
06/10/2026Fail-Final Boiler Equipment InspectionFailView ↗
12/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/14/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/19/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/26/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/26/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/30/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 72
DateRequirementInspectorRole
04/15/2026Tenant Protection Plan Compliance—special
04/15/2026Fire-Resistant Penetrations and JointsTREVOR O. FLOWERSspecial
04/06/2026Fire-Resistant Penetrations and JointsTREVOR O. FLOWERSspecial
04/06/2026Tenant Protection Plan Compliance—special
03/23/2026Fire-Resistant Penetrations and JointsTREVOR O. FLOWERSspecial
03/23/2026Tenant Protection Plan Compliance—special
12/22/2025Tenant Protection Plan ComplianceTREVOR O. FLOWERSspecial
12/22/2025Heating SystemsTREVOR O. FLOWERSspecial
12/17/2025Energy Code Compliance InspectionsTREVOR O. FLOWERSprogress
12/15/2025Mechanical SystemsTREVOR O. FLOWERSspecial
12/15/2025FinalTREVOR O. FLOWERSprogress
12/10/2025Tenant Protection Plan ComplianceTREVOR O. FLOWERSspecial
12/10/2025Tenant Protection Plan ComplianceTREVOR O. FLOWERSspecial
12/08/2025Fire-Resistant Penetrations and JointsJoseph Bazinispecial
12/05/2025FinalTREVOR O. FLOWERSprogress
12/05/2025Sprinkler SystemsTREVOR O. FLOWERSspecial
12/05/2025Mechanical SystemsTREVOR O. FLOWERSspecial
12/03/2025Tenant Protection Plan ComplianceTREVOR O. FLOWERSspecial
12/03/2025Fire-Resistant Penetrations and JointsTREVOR O. FLOWERSspecial
12/01/2025FinalTREVOR O. FLOWERSprogress
11/07/2025FinalJoseph Baziniprogress
11/07/2025Tenant Protection Plan ComplianceJoseph Bazinispecial
11/07/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsJoseph Bazinispecial
11/07/2025Tenant Protection Plan ComplianceJoseph Bazinispecial
11/07/2025Fire-Resistance Rated ConstructionJoseph Baziniprogress
Latest 25 of 72.
▾Documents — 574 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch22
09/06/2026M00098825-I1Request digital key ↗
09/03/2026M00493730-P1Request digital key ↗
09/03/2026M00493730-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Sign6
09/05/2026M00209759-I1Request digital key ↗
09/05/2026M00209732-I1Request digital key ↗
09/05/2026M00209608-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/05/2026M00193506-I1Request digital key ↗
09/04/2026M00427717-I1Request digital key ↗
09/03/2026M00453404-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00448480-I1Request digital key ↗
09/04/2026M00448480-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00218220-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00212574-I1Request digital key ↗
▸Applications & Permits81
▸BISWORK PERMIT APPLICATION44
12/28/2020140986459Open ↗
02/10/2020122891442Open ↗
08/14/2019123693253Open ↗
Showing 3 of 44 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION36
12/16/2022120699823Open ↗
08/24/2022123693253Open ↗
08/23/2022122891442Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWState DEC Permit1
08/13/2026M00193506-I1Open ↗
▸Seals & Professional Certifications163
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION43
12/20/2019140608073Open ↗
12/20/2019140608073Open ↗
08/14/2019123693253Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWProgress Inspector Seal & Signature39
10/01/2026M00453404-I1Open ↗
10/01/2026M00453404-I1Open ↗
09/23/2026M01326835-S2Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature36
09/05/2026M00218220-I1Open ↗
09/05/2026M00209759-I1Open ↗
09/05/2026M00209732-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
10/01/2026M00453404-I1Open ↗
09/23/2026M01326835-P6Open ↗
09/23/2026M01326835-S3Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
08/13/2019123693253Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
08/13/2019123693253Open ↗
11/14/2017123145211Open ↗
Showing 2 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/07/2020140986459Open ↗
Showing 1 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
12/07/2020140986459Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment22
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
11/06/2017122900290Open ↗
09/11/2017123011052Open ↗
06/26/2017123011034Open ↗
Showing 3 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Safety & Tenant Protection22
▸BISTenant Protection Plan and Notes10
08/13/2019123693253Open ↗
11/14/2017123145211Open ↗
09/11/2017123011052Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWTenant Protection Plan10
09/05/2026M00209759-I1Open ↗
09/05/2026M00209732-I1Open ↗
09/04/2026M00427717-I1Open ↗
Showing 3 of 10 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
12/07/2020140986459Open ↗
▸Environmental & Asbestos52
▸DOB NOWDEP ACP-5: Asbestos Assessment Report34
09/05/2026M00218220-I1Open ↗
09/05/2026M00209759-I1Open ↗
09/05/2026M00209732-I1Open ↗
Showing 3 of 34 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)15
12/07/2020140986459Open ↗
08/14/2019123693253Open ↗
11/14/2017123145211Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance57
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS26
08/13/2019123693253Open ↗
03/23/2018122900290Open ↗
01/23/2018123011052Open ↗
Showing 3 of 26 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
05/04/2021140986459Open ↗
11/06/2020140422978Open ↗
06/01/2020140422978Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
08/17/2022123693253Open ↗
05/04/2021140986459Open ↗
05/04/2021140986459Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/04/2026M00448480-I1Open ↗
09/03/2026M00514192-I1Open ↗
08/13/2026M00453404-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/07/2020140986459Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY12
12/19/2022120699823Open ↗
12/19/2022120699823Open ↗
12/16/2022120699823Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
04/02/2018122900290Open ↗
▸Approvals, Objections & Sign-offs43
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
05/04/2021140986459Open ↗
11/06/2020140422978Open ↗
05/22/2020140422978Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
02/07/2020122891442Open ↗
01/08/2018123011034Open ↗
05/17/2017122605485Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSHED LETTER3
02/12/2019140608073Open ↗
02/05/2018140608073Open ↗
Showing 2 of 3 on file for this type
▸BISSUPERSEDING LETTER3
02/12/2019140608073Open ↗
06/15/2017140422978Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
08/23/2022122891442Open ↗
Showing 1 of 2 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
04/02/2018122900290Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership38
▸BISCOST AFFIDAVIT31
05/04/2021140986459Open ↗
12/07/2020140986459Open ↗
11/06/2020140422978Open ↗
Showing 3 of 31 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT7
09/11/2017123011052Open ↗
05/10/2017123011034Open ↗
04/20/2017123036669Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms42
▸BISEFILING COVER SHEET15
08/13/2019123693253Open ↗
11/14/2017123145211Open ↗
09/11/2017123011052Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM13
02/14/2020140422978Open ↗
01/31/2020122891442Open ↗
12/20/2019140608073Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION11
12/22/2020140986459Open ↗
12/07/2020140986459Open ↗
12/07/2020140986459Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
12/07/2020140986459Open ↗
Showing 1 of 3 on file for this type
▸Other Documents4
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDHCR DOCUMENT1
06/03/2020140422978Open ↗
▸DOB NOWCalculations1
08/13/2026M01090406-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01090406-I1Open ↗