← Back
BuildNYC
Two stories - detached, small or mid-size
120 NIXON AVENUE
STATEN ISLAND · BIN 5014660
💬 Discuss this project
2022Year Built
2Stories
A1Building Class
R1-2Zoning
3,058 sfGross Floor Area
1Units
1 Active Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 19,745 sf lot · 0.15 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 27p · 1 filing · 19 docs
Floor 16p · 1 filing · 19 docs
Cellar8p · 1 filing · 19 docs
Site & exteriorTemporary construction fence2p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ronald D.victorio R.A.410/28/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Raise the Roof GCScaffold207/08/2026
Alison Plumbing & HeatingPlumbing207/08/2026
Fichera ElectricElectrical103/22/2026
Raise the Roof GCGeneral Contractor103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738310/28/2022
Building Lifecycle
07/28/2025
Tree preservation, at time of inspection observed down hill at building 120 nixon avenue rear yard below and paxton street up hill in next to lot…
DOB violation · open
02/02/2023
Signed off — Alteration
Removal of all existing fixtures, at cellar and 1st floor level including water supply and drain lines. Existing water meter and house trap to remain. installation of new plumbing fixtures at cellar, 01 and 02, including water supply and drain lines.
S00327981-I1
12/08/2022
Objection resolved — Addressed
12/08/2022
Special inspection requirement — HVAC insulation and sealing
anthony santoro
12/08/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
49 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAlison Plumbing & Heating06/15/2022
DOB NOWConstruction FenceSigned-offRaise the Roof GC03/28/2022
DOB NOWPlumbingSigned-offAlison Plumbing & Heating10/13/2021
DOB NOWConstruction FenceSigned-offRaise the Roof GC04/02/2021
BIS—ISSUEDRaise the Roof GC01/13/2022
BIS—ISSUEDRaise the Roof GC12/06/2021
BIS—ISSUEDRaise the Roof GC08/03/2021
3 projects · most recent 02/03/2022
General Wiring
FiledStatusContractorScope
02/03/2022CompleteFichera ElectricGeneral Wiring
08/13/2021CompleteFichera Electric—
07/30/2021CompleteFichera ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/30/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/14/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
12/08/2022HVAC insulation and sealing anthony santoroenergy_progress
12/08/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
12/08/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
12/08/2022HVAC and service water heating system controls anthony santoroenergy_progress
12/08/2022Maintenance informationanthony santoroenergy_progress
12/08/2022HVAC and service water heating equipment anthony santoroenergy_progress
09/08/2022Maintenance informationanthony santoroenergy_progress
09/08/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
09/08/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
09/08/2022HVAC insulation and sealing anthony santoroenergy_progress
09/08/2022HVAC and service water heating system controls anthony santoroenergy_progress
09/08/2022HVAC and service water heating equipment anthony santoroenergy_progress
02/18/2020FinalRonald Victorioprogress
142 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account