← Back
Elevator apt, fireproof without stores
The New Jewish Home, Manhattan
120 WEST 100 STREET · Upper West Side-Manhattan Valley · BIN 1055905
💬 Discuss this project
1958Year Built
16Stories
D3Building Class
R7-2Zoning
257,760 sfGross Floor Area
287Units
LL97 CoveredRent Stabilized59 Open Violations 57 unresolved · 2 paperwork only ▸FISP: UNSAFE
Elevator apt, fireproof without stores · Owner of record: CF PWV LLC · 24,757 sf lot · 10.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
Floor 162 filings · 15 docs
Floor 152 filings · 15 docs
Floor 14
Floor 13
Floor 124 filings · 15 docs
Floor 11
Floor 102 filings · 15 docs
Floor 93 filings · 15 docs
Floor 82 filings · 15 docs
Floor 7
Floor 6
Floor 5
Floor 42 filings · 15 docs
Floor 3
Floor 22 filings · 15 docs
Floor 11 filing · 4 docs
Cellar2 filings · 8 docs
Site & exteriorUnder Construction2 filings · 4 docs
Filed — no permit issued1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PWV ACQUISITIONS6703/22/2026
JUMEAUX MANAGEMENT1003/21/2026
COLUMBUS SQUARE MANAGEMENT803/21/2026
S P S NY CONSTRUCTION403/21/2026
PWW ACQUISITION303/21/2026
PWV MANAGEMENT303/21/2026
CF PWV LLC103/22/2026
RELATED103/22/2026
PWL AQUISITION LLC103/22/2026
JUMEAUX MANAGEMENT LCC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ATELIER NEW YORK ARCHITECTURE4003/21/2026
RIGGING CONSULTANTS403/21/2026
NEW YORK ENGINEERING ASSOCIATES P C403/21/2026
JM ZONING, LLC.203/21/2026
HLZAE103/21/2026
Rigid Structural Design, LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LUMA CONSTRUCTION LLCGeneral Contractor2807/08/2026
LAN RENOVATION LLCGeneral Contractor1707/08/2026
A.M. SAGE PLG & HTG LLCPlumbing1207/08/2026
OPTIMUM BUILDING RESTORATIONGeneral Contractor903/21/2026
CREATIVE PLUMBING INPlumbing807/08/2026
INTERSYSTEMS INSTAL S&SGeneral Contractor407/08/2026
BELL FUEL OIL, LLCPlumbing407/08/2026
L&J PLG & HTG CO OF NY INPlumbing307/08/2026
RJB CONTRACTING CARTING CORPGeneral Contractor303/21/2026
INTERSYSTEM CONSTRUCTIONGeneral Contractor208/13/2026
TROADIO MENENDEZElectrical103/21/2026
E-J ELEC. INSTALLATION COElectrical103/22/2026
YITZHAK ADIKAElectrical103/21/2026
MARIO CASTROElectrical103/21/2026
LAURA ELEC'L LIGHTING &Electrical103/22/2026
SUN ELECTRIC, INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HOWARD L ZIMMERMAN ARCHIT1712107/18/2023
NEW YORK ENGINEERING ASSO851206/06/2023
ATELIER NY ARCHITECTURE24381705/23/2023
Building Lifecycle
All (237)Filed (44)Permit Issued (63)Signed Off (2)Facade (FISP) (16)Violation (60)Inspection (18)Objection (4)Special Inspection (30)
08/12/2026
Permit issued — Sidewalk Shed
M00928538-I1-SH
06/28/2026
Violation issued (HPD, open)
A
06/28/2026
Violation issued (HPD, open)
A
06/28/2026
Violation issued (HPD, open)
B
06/28/2026
Violation issued (HPD, open)
C
06/28/2026
Violation issued (HPD, open)
B
06/28/2026
Violation issued (HPD, open)
B
06/23/2026
Violation issued (HPD, open)
C
06/23/2026
Violation issued (HPD, open)
B
06/23/2026
Violation issued (HPD, open)
A
06/23/2026
Violation issued (HPD, open)
A
06/23/2026
Violation issued (HPD, open)
B
06/17/2026
Violation issued (HPD, open)
B
06/17/2026
Violation issued (HPD, open)
A
06/17/2026
Violation issued (HPD, open)
A
06/17/2026
Violation issued (HPD, open)
B
05/22/2026
Violation issued (HPD, closed)
C
05/22/2026
Violation issued (HPD, closed)
C
05/22/2026
Violation issued (HPD, open)
B
05/22/2026
Violation issued (HPD, open)
A
05/22/2026
Violation issued (HPD, open)
C
05/13/2026
Violation issued (HPD, open)
B
05/13/2026
Violation issued (HPD, open)
B
05/13/2026
Violation issued (HPD, open)
A
05/13/2026
Violation issued (HPD, open)
B
05/13/2026
Violation issued (HPD, open)
B
05/13/2026
Violation issued (HPD, open)
A
04/29/2026
Violation issued (HPD, open)
A
04/20/2026
Violation issued (ECB, open)
Local Law
04/07/2026
Violation issued (ECB, open)
Construction
03/19/2026
Permit issued — Sidewalk Shed
M00928538-I1-SH
01/27/2026
Permit issued — Sidewalk Shed
M00928538-I1-SH
01/27/2026
Objection resolved — Resolved
01/23/2026
Objection raised — Scope
01/21/2026
Filed — Alteration
Suspended Scaffold for Facade Restoration and Inspection as Shown on Plans
M01336024-I1
01/07/2026
Permit issued — Construction Fence
M08000830-I1-FN
12/31/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
11/28/2025
Violation issued (HPD, open)
B
11/28/2025
Violation issued (HPD, open)
B
11/28/2025
Violation issued (HPD, open)
B
11/28/2025
Violation issued (HPD, closed)
A
11/28/2025
Violation issued (HPD, open)
B
11/28/2025
Violation issued (HPD, open)
C
11/28/2025
Violation issued (HPD, open)
B
11/26/2025
Violation issued (HPD, open)
B
11/26/2025
Violation issued (HPD, open)
B
11/26/2025
Violation issued (HPD, open)
B
10/06/2025
Violation issued (HPD, closed)
A
10/06/2025
Violation issued (HPD, open)
B
10/06/2025
Violation issued (HPD, open)
B
10/06/2025
Violation issued (HPD, open)
B
08/21/2025
Permit issued — Sidewalk Shed
M00928538-I1-SH
07/01/2025
Violation issued (ECB, open)
Construction
06/04/2025
Violation issued (HPD, closed)
A
05/29/2025
Violation issued (HPD, closed)
I
05/21/2025
Violation issued (HPD, closed)
C
03/04/2025
Permit issued — General Construction
M00781659-I1-GC
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/25/2024
Signed off — Alteration
GAS CONNECTION TO GAS BURNER.
M00884581-I1
10/25/2024
Signed off — Alteration
M00884562-I1
Latest 60 of 237 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEM CONSTRUCTION08/12/2026
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEM CONSTRUCTION03/19/2026
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEMS INSTAL S&S01/27/2026
DOB NOWConstruction FencePermit IssuedLUMA CONSTRUCTION LLC01/07/2026
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEMS INSTAL S&S08/21/2025
DOB NOWGeneral ConstructionPermit IssuedOPTIMUM BUILDING RESTORAT03/04/2025
DOB NOWGeneral ConstructionPermit IssuedOPTIMUM BUILDING RESTORAT10/07/2024
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEMS INSTAL S&S09/06/2024
DOB NOWPlumbingSigned-offAPPROVED ENERGY LLC08/23/2024
DOB NOWBoiler EquipmentSigned-offAPPROVED ENERGY LLC08/23/2024
DOB NOWPlumbingPermit IssuedAB PLUMBING INC08/07/2024
DOB NOWSuspended ScaffoldPermit IssuedSPD CONSTRUCTION CORP04/02/2024
DOB NOWConstruction FencePermit IssuedLUMA CONSTRUCTION LLC02/29/2024
DOB NOWGeneral ConstructionPermit IssuedOPTIMUM BUILDING RESTORAT02/20/2024
DOB NOWGeneral ConstructionPermit IssuedRJB CONTRACTING CARTING C10/25/2023
DOB NOWGeneral ConstructionPermit IssuedLAN RENOVATION LLC10/23/2023
DOB NOWGeneral ConstructionPermit IssuedLAN RENOVATION LLC10/23/2023
DOB NOWGeneral ConstructionPermit IssuedLAN RENOVATION LLC10/23/2023
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEMS INSTAL S&S09/18/2023
DOB NOWPlumbingPermit IssuedAB PLUMBING INC07/12/2023
DOB NOWPlumbingPermit IssuedAB PLUMBING INC07/12/2023
DOB NOWPlumbingPermit IssuedAB PLUMBING INC07/12/2023
DOB NOWPlumbingPermit IssuedAB PLUMBING INC07/12/2023
DOB NOWGeneral ConstructionPermit IssuedLUMA CONSTRUCTION LLC06/29/2023
DOB NOWBoiler EquipmentSigned-offAPPROVED ENERGY LLC06/27/2023
DOB NOWPlumbingSigned-offAPPROVED ENERGY LLC06/22/2023
DOB NOWGeneral ConstructionPermit IssuedLUMA CONSTRUCTION LLC03/14/2023
DOB NOWGeneral ConstructionPermit IssuedLUMA CONSTRUCTION LLC03/14/2023
DOB NOWGeneral ConstructionPermit IssuedLUMA CONSTRUCTION LLC03/14/2023
DOB NOWGeneral ConstructionPermit IssuedLUMA CONSTRUCTION LLC03/14/2023
DOB NOWGeneral ConstructionPermit IssuedLUMA CONSTRUCTION LLC03/14/2023
DOB NOWPlumbingPermit IssuedA.M. SAGE PLG & HTG LLC03/10/2023
DOB NOWPlumbingPermit IssuedA.M. SAGE PLG & HTG LLC03/10/2023
DOB NOWPlumbingPermit IssuedA.M. SAGE PLG & HTG LLC03/10/2023
DOB NOWPlumbingPermit IssuedA.M. SAGE PLG & HTG LLC03/10/2023
DOB NOWPlumbingPermit IssuedA.M. SAGE PLG & HTG LLC03/10/2023
DOB NOWPlumbingPermit IssuedA.M. SAGE PLG & HTG LLC03/10/2023
DOB NOWConstruction FencePermit IssuedLUMA CONSTRUCTION LLC03/06/2023
DOB NOWPlumbingPermit IssuedA.M. SAGE PLG & HTG LLC12/01/2022
DOB NOWPlumbingPermit IssuedA.M. SAGE PLG & HTG LLC11/03/2022
+ 60 more permits on file
9 projects · most recent 07/17/2023
Gas Water/Sanitary
FiledStatusContractorScope
07/17/2023Permit IssuedCREATIVE PLUMBING INGas, Water/Sanitary
05/23/2023Permit IssuedA.M. SAGE PLG & HTG LLCGas, Water/Sanitary
03/14/2023Permit IssuedA.M. SAGE PLG & HTG LLCGas, Water/Sanitary
03/14/2023Permit IssuedA.M. SAGE PLG & HTG LLCGas, Water/Sanitary
03/14/2023Permit IssuedA.M. SAGE PLG & HTG LLCGas, Water/Sanitary
12/15/2022Permit IssuedCREATIVE PLUMBING INGas, Water/Sanitary
12/15/2022Permit IssuedCREATIVE PLUMBING INGas, Water/Sanitary
10/25/2022Permit IssuedA.M. SAGE PLG & HTG LLCGas, Water/Sanitary
10/01/2021Permit IssuedCREATIVE PLUMBING INGas, Water/Sanitary
17 projects · most recent 10/21/2023
General Wiring Lighting
FiledStatusContractorScope
10/21/2023CompleteSOURCE ELECTRIC INCGeneral Wiring
10/15/2023Permit IssuedAUR0RA ELECL CONTG INC—
06/14/2023Permit IssuedI.K.E. ELECTRICAL CORP.General Wiring
04/04/2023CompleteSOURCE ELECTRIC INCGeneral Wiring, Lighting
12/21/2022Permit IssuedI.K.E. ELECTRICAL CORP.General Wiring
12/01/2022CompleteLAURA ELEC'L LIGHTING &—
03/27/2020CompleteE-J ELEC. INSTALLATION COGeneral Wiring
11/20/2019Permit IssuedR & T ELECTRICAL CORPGeneral Wiring
09/19/2019CompleteI.K.E. ELECTRICAL CORP.General Wiring
09/10/2019CompleteI.K.E. ELECTRICAL CORP.General Wiring
06/06/2019Permit IssuedJLC ELEC'L CONTR'G INCGeneral Wiring
06/06/2019Permit IssuedJLC ELEC'L CONTR'G INCGeneral Wiring
02/26/2019CompleteSUN ELECTRIC, INC.General Wiring
01/16/2019Permit IssuedI.K.E. ELECTRICAL CORP.General Wiring
05/24/2018Permit IssuedSUN ELECTRIC, INC.General Wiring
1 project · most recent 03/15/2023
FiledStatusContractorScope
03/15/2023Permit IssuedLUMA CONSTRUCTION LLC1 scope_items
2 projects · most recent 01/21/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
01/21/2026——Suspended Scaffold (SC)
02/14/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
09/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/05/2024Pass-Final Boiler Equipment InspectionPassView ↗
04/30/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/13/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/07/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/24/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/09/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/03/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/11/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/11/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 107
DateRequirementInspectorRole
12/31/2025Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
07/18/2023Tenant Protection Plan ComplianceJon Colatrellaspecial
06/02/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
06/02/2023Energy Code Compliance InspectionsLOUIS ARENAprogress
05/26/2023Fenestration and door U-factor and product ratingsAnatole Plotkinenergy_progress
05/26/2023Lighting in dwelling unitsAnatole Plotkinenergy_progress
05/26/2023Fenestration areasAnatole Plotkinenergy_progress
05/26/2023Air barrier - visual inspectionAnatole Plotkinenergy_progress
05/26/2023Fenestration air leakageAnatole Plotkinenergy_progress
05/26/2023Fire-Resistant Penetrations and JointsAnatole Plotkinspecial
05/26/2023Energy Code Compliance InspectionsAnatole Plotkinprogress
05/26/2023FinalAnatole Plotkinprogress
05/26/2023Fire-Resistance Rated ConstructionAnatole Plotkinprogress
05/23/2023FinalAnatole Plotkinprogress
05/23/2023Energy Code Compliance InspectionsAnatole Plotkinprogress
05/23/2023Fire-Resistant Penetrations and JointsAnatole Plotkinspecial
05/23/2023Fenestration areasAnatole Plotkinenergy_progress
05/23/2023Air barrier - visual inspectionAnatole Plotkinenergy_progress
05/23/2023Fenestration air leakageAnatole Plotkinenergy_progress
05/23/2023Fenestration and door U-factor and product ratingsAnatole Plotkinenergy_progress
05/23/2023Lighting in dwelling unitsAnatole Plotkinenergy_progress
05/23/2023Fire-Resistance Rated ConstructionAnatole Plotkinprogress
03/15/2023Energy Code Compliance InspectionsAnatole Plotkinprogress
03/15/2023Fire-Resistance Rated ConstructionAnatole Plotkinprogress
03/15/2023Lighting in dwelling unitsAnatole Plotkinenergy_progress
Latest 25 of 107.
▾Documents — 1,000 on file (BIS + DOB NOW)
▸Plans & Drawings44
▸DOB NOWPlans/Sketch40
09/03/2026M00585382-I1Request digital key ↗
09/01/2026M08000830-I1Request digital key ↗
09/01/2026M00789493-I1Request digital key ↗
Showing 3 of 40 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/29/2026M00360137-I1Request digital key ↗
08/29/2026M00360137-P1Request digital key ↗
Showing 2 of 4 on file for this type
▸Applications & Permits171
▸BISWORK PERMIT APPLICATION85
05/08/2023140844843Open ↗
12/09/2022140930642Open ↗
10/19/2022140844843Open ↗
Showing 3 of 85 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION80
07/19/2023140930642Open ↗
07/18/2023140930642Open ↗
12/13/2022140844843Open ↗
Showing 3 of 80 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
08/12/2020140930731Open ↗
08/12/2020140930731Open ↗
08/12/2020140930731Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLL114/19 PERMIT RESTRICTION1
12/08/2020140970091Open ↗
▸Seals & Professional Certifications279
▸DOB NOWProgress Inspector Seal & Signature89
09/01/2026M00584685-I1Open ↗
09/01/2026M00584685-I1Open ↗
09/01/2026M00584685-I1Open ↗
Showing 3 of 89 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature42
09/04/2026M00360159-I1Open ↗
09/03/2026M00377279-I1Open ↗
09/03/2026M00585382-I1Open ↗
Showing 3 of 42 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION41
09/16/2019140847038Open ↗
09/10/2019140847706Open ↗
09/05/2019140847706Open ↗
Showing 3 of 41 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT25
07/27/2020140930642Open ↗
07/27/2020140930731Open ↗
05/09/2019140847706Open ↗
Showing 3 of 25 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION25
07/27/2020140930642Open ↗
07/27/2020140930731Open ↗
05/09/2019140847706Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY25
07/27/2020140930642Open ↗
07/27/2020140930731Open ↗
05/09/2019140847706Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/02/2026M01336024-I1Open ↗
09/01/2026M00584685-I1Open ↗
08/29/2026M00789586-P1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/26/2020140970091Open ↗
▸Trade Schedules & Equipment53
▸BISSCHEDULE B - PLUMBING26
12/13/2022140844843Open ↗
10/21/2020140847038Open ↗
10/19/2020140847038Open ↗
Showing 3 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE23
04/24/2020140844843Open ↗
03/12/2020140844843Open ↗
09/16/2019140847038Open ↗
Showing 3 of 23 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
08/12/2020140930731Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection30
▸BISTENANT PROTECTION PLAN AND NOTES25
10/26/2020140970091Open ↗
07/27/2020140930642Open ↗
07/27/2020140930731Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWTenant Protection Plan4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos77
▸DOB NOWDEP ACP-5: Asbestos Assessment Report40
09/04/2026M00360159-I1Open ↗
09/03/2026M00377279-I1Open ↗
09/03/2026M00585382-I1Open ↗
Showing 3 of 40 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)34
10/26/2020140970091Open ↗
07/27/2020140930642Open ↗
07/27/2020140930731Open ↗
Showing 3 of 34 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance92
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY28
12/08/2020140970091Open ↗
11/13/2020140970091Open ↗
10/30/2020140847706Open ↗
Showing 3 of 28 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS26
06/12/2019140844843Open ↗
06/05/2019140844843Open ↗
03/13/2019140703488Open ↗
Showing 3 of 26 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS25
07/27/2020140930642Open ↗
07/27/2020140930731Open ↗
05/09/2019140847706Open ↗
Showing 3 of 25 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
10/30/2020140847706Open ↗
10/30/2020140847038Open ↗
03/13/2019140703488Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports29
▸BISTECHNICAL REPORT: RESPONSIBILITY29
12/08/2020140970091Open ↗
11/13/2020140970091Open ↗
10/30/2020140847706Open ↗
Showing 3 of 29 on file for this type
▸Approvals, Objections & Sign-offs45
▸BISLETTERS - SUPPORTING DOCUMENTATION16
10/24/2022140930642Open ↗
07/06/2022140844843Open ↗
10/29/2020140970091Open ↗
Showing 3 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
10/30/2020140847706Open ↗
10/30/2020140847038Open ↗
03/13/2019140703488Open ↗
Showing 3 of 14 on file for this type
▸BISSUPERSEDING LETTER7
05/08/2023140844843Open ↗
10/19/2022140844843Open ↗
Showing 2 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership83
▸BISCOST AFFIDAVIT46
10/30/2020140847706Open ↗
10/30/2020140847038Open ↗
10/26/2020140970091Open ↗
Showing 3 of 46 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT24
07/27/2020140930642Open ↗
07/27/2020140930731Open ↗
05/09/2019140847706Open ↗
Showing 3 of 24 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸Filing & Intake Forms86
▸BISADDITIONAL INFORMATION32
07/19/2023140930642Open ↗
12/13/2022140844843Open ↗
10/29/2020140970091Open ↗
Showing 3 of 32 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET27
10/26/2020140970091Open ↗
07/27/2020140930642Open ↗
07/27/2020140930731Open ↗
Showing 3 of 27 on file for this type
▸BISBOROUGH INTAKE FORM22
11/24/2021140930731Open ↗
10/29/2021140930642Open ↗
10/29/2021140930642Open ↗
Showing 3 of 22 on file for this type
▸BISEFILING COVER SHEET5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
11/24/2021140930731Open ↗
08/12/2020140930731Open ↗
08/12/2020140930731Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
10/29/2020140970091Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type