Elevator apt, miscellaneous
Public School 139
120 WEST 140 STREET · Harlem (North) · BIN 1060054
💬 Discuss this project
1939Year Built
3Stories
D9Building Class
R7-2Zoning
111,659 sfGross Floor Area
126Units
LL97 CoveredRent Stabilized0 Open Violations
Elevator apt, miscellaneous · Owner of record: PACT RENAISSANCE COLLABORATIVE LLC · 64,974 sf lot · 1.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneralOther
Roof29p · 4 filings · 20 docs
Floor 525p · 4 filings · 20 docs
Floor 424p · 4 filings · 20 docs
Floor 326p · 4 filings · 20 docs
Floor 226p · 4 filings · 20 docs
Floor 124p · 3 filings · 20 docs
Cellar26p · 4 filings · 20 docs
Site & exterior20p · 3 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KAJ NY CONSTRUCTION1307/08/2026
OWNERS REP807/08/2026
NYCHA CONST DEPT403/21/2026
NYCHA303/21/2026
MYC HOUSING AUTHORITY203/21/2026
1 FIFTH AV203/21/2026
NYC Housing Authority103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAGHER ENGINEERING PLLC2106/24/2024
SYED ENGINEERING, P.C.202/08/2022
PAUL PERDEK, PROF. ENG. PLLC310/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.4203/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
AE DESIGN SOLUTION603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor1007/08/2026
SUTHERTON CNSTRN CORPGeneral Contractor707/08/2026
DUAL FUEL PLUBING & HTINGPlumbing707/08/2026
DUAL FUEL COMPANY LLCGeneral Contractor603/21/2026
MONADNOCK CONSTRUCTION INGeneral Contractor507/08/2026
KAJ NY CONSTRUCTION INCGeneral Contractor407/08/2026
A & E PLUMBING CORPPlumbing307/08/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor107/08/2026
MORRIS HELLERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. HAMDI GUNAL, PE, P.C.30001706/24/2024
Building Lifecycle
All (155)Filed (26)Permit Issued (24)Signed Off (8)Violation (60)Inspection (7)Special Inspection (30)
04/29/2026
Violation issued (HPD, closed)
A
08/25/2025
Violation issued (HPD, closed)
C
08/25/2025
Violation issued (HPD, closed)
C
08/25/2025
Violation issued (HPD, closed)
C
08/05/2024
Violation issued (HPD, closed)
B
08/05/2024
Violation issued (HPD, closed)
B
07/01/2024
Signed off — Alteration
Plumbing work as per plans filed..
M00324191-I1
06/26/2024
Violation issued (HPD, closed)
C
06/26/2024
Violation issued (HPD, closed)
B
06/25/2024
Special inspection requirement — HVAC and service water heating system controls
Mehmet Gunal
06/25/2024
Special inspection requirement — Maintenance information
Mehmet Gunal
06/25/2024
Special inspection requirement — HVAC and service water heating equipment
Mehmet Gunal
06/25/2024
Special inspection requirement — Energy Code Compliance Inspections
Mehmet Gunal
06/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mehmet Gunal
06/25/2024
Special inspection requirement — HVAC insulation and sealing
Mehmet Gunal
06/24/2024
Filed — Alteration
Plumbing work as per plans filed..
M00324191-P8
06/04/2024
Special inspection requirement — HVAC insulation and sealing
Mehmet Gunal
06/04/2024
Special inspection requirement — Energy Code Compliance Inspections
Mehmet Gunal
06/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mehmet Gunal
06/04/2024
Special inspection requirement — Maintenance information
Mehmet Gunal
06/04/2024
Special inspection requirement — HVAC and service water heating equipment
Mehmet Gunal
06/04/2024
Special inspection requirement — HVAC and service water heating system controls
Mehmet Gunal
04/12/2024
Filed — Alteration
Plumbing work as per plans filed..
M00324191-P7
03/04/2024
Filed — Alteration
Plumbing work as per plans filed..
M00324191-P6
03/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mehmet Gunal
03/01/2024
Special inspection requirement — HVAC and service water heating equipment
Mehmet Gunal
03/01/2024
Special inspection requirement — Energy Code Compliance Inspections
Mehmet Gunal
03/01/2024
Special inspection requirement — HVAC insulation and sealing
Mehmet Gunal
03/01/2024
Special inspection requirement — Maintenance information
Mehmet Gunal
03/01/2024
Special inspection requirement — HVAC and service water heating system controls
Mehmet Gunal
02/15/2024
Signed off — Alteration
Boiler work as per plan.
M00385130-I1
02/13/2024
Permit issued — Plumbing
M00324191-I1-PL
02/09/2024
Filed — Alteration
Plumbing work as per plans filed..
M00324191-P5
02/08/2024
Signed off — Alteration
Plumbing work being filed in conjunction with Alteration 2 application number 140942719 for interior renovation throughout. NO change to use, egress or occupancy.
M00525973-I1
02/01/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mehmet Gunal
01/30/2024
Special inspection requirement — HVAC and service water heating equipment
Mehmet Gunal
01/30/2024
Special inspection requirement — HVAC insulation and sealing
Mehmet Gunal
01/30/2024
Special inspection requirement — Energy Code Compliance Inspections
Mehmet Gunal
01/30/2024
Special inspection requirement — HVAC and service water heating system controls
Mehmet Gunal
01/30/2024
Special inspection requirement — Maintenance information
Mehmet Gunal
01/26/2024
Signed off — Alteration
M00375454-I1
01/25/2024
Signed off — Alteration
Mechanical work being filed in conjunction with Alteration 2 application number 140942719 for interior renovation throughout. NO change to use, egress or occupancy.
M00521772-I1
01/25/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/23/2024
Filed — Alteration
Plumbing work being filed in conjunction with Alteration 2 application number 140942719 for interior renovation throughout. NO change to use, egress or occupancy.
M00525973-P3
01/11/2024
Special inspection requirement — Heating Systems
Mehmet Gunal
01/11/2024
Special inspection requirement — HVAC and service water heating equipment
Mehmet Gunal
01/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mehmet Gunal
01/11/2024
Special inspection requirement — HVAC and service water heating system controls
Mehmet Gunal
01/11/2024
Special inspection requirement — Maintenance information
Mehmet Gunal
01/10/2024
Filed — Alteration
Boiler work as per plan.
M00385130-P4
01/08/2024
Special inspection requirement — Maintenance information
Mehmet Gunal
12/28/2023
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
11/28/2023
Permit issued — Boiler Equipment
M00385130-I1-BE
11/20/2023
Filed — Alteration
Boiler work as per plan.
M00385130-P3
10/30/2023
Permit issued — Mechanical Systems
M00521772-I1-MS
09/07/2023
Permit issued — Mechanical Systems
M00375454-I1-MS
08/30/2023
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
08/04/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING02/13/2024
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING11/28/2023
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL10/30/2023
DOB NOWMechanical SystemsSigned-offMONADNOCK CONSTRUCTION IN09/07/2023
DOB NOWPlumbingSigned-offA & E PLUMBING CORP06/27/2023
DOB NOWMechanical SystemsSigned-offMONADNOCK CONSTRUCTION IN10/05/2022
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING09/30/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC08/17/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/17/2022
DOB NOWSupported ScaffoldPermit IssuedSUTHERTON CNSTRN CORP07/13/2022
DOB NOWSupported ScaffoldPermit IssuedSUTHERTON CNSTRN CORP01/13/2022
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC11/17/2021
DOB NOWPlumbingSigned-offA & E PLUMBING CORP11/10/2021
DOB NOWSupported ScaffoldPermit IssuedSUTHERTON CNSTRN CORP11/04/2021
DOB NOWSupported ScaffoldPermit IssuedKAJ NY CONSTRUCTION INC10/28/2021
DOB NOWMechanical SystemsSigned-offMONADNOCK CONSTRUCTION IN10/04/2021
DOB NOWSupported ScaffoldPermit IssuedKAJ NY CONSTRUCTION INC09/23/2021
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING09/21/2021
DOB NOWGeneral ConstructionSigned-offCORE SCAFFOLD SYSTEMS INC08/18/2021
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC08/18/2021
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC08/13/2021
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING06/28/2021
DOB NOWPlumbingSigned-offA & E PLUMBING CORP03/05/2021
DOB NOWMechanical SystemsSigned-offMONADNOCK CONSTRUCTION IN02/18/2021
BISOTISSUEDMONADNOCK CONSTRUCTION IN11/07/2023
BISOTISSUEDMONADNOCK CONSTRUCTION IN11/07/2023
BISOTISSUEDMONADNOCK CONSTRUCTION IN11/17/2022
BISOTISSUEDMONADNOCK CONSTRUCTION IN11/17/2022
BISOTISSUEDPYRAMID ETC COMPANIES, LL06/29/2022
BISOTISSUEDPYRAMID ETC COMPANIES, LL01/25/2022
BISOTISSUEDMONADNOCK CONSTRUCTION IN10/04/2021
BISOTISSUEDMONADNOCK CONSTRUCTION IN10/04/2021
BISOTISSUEDMONADNOCK CONSTRUCTION IN10/01/2021
BISOTISSUEDMONADNOCK CONSTRUCTION IN10/01/2021
BISOTISSUEDMONADNOCK CONSTRUCTION IN02/03/2021
BISOTRE-ISSUEDMONADNOCK CONSTRUCTION IN02/01/2021
BISFPISSUEDALLIED FIRE CONTROL SVCS04/30/2018
BISFPISSUEDALLIED FIRE CONTROL SVCS05/29/2012
BISPLISSUEDDUAL FUEL PLUBING & HTING11/25/2009
BISPLISSUEDDUAL FUEL PLUBING & HTING11/28/2006
+ 7 more permits on file
4 projects · most recent 09/24/2025
General Wiring Boiler Controls
FiledStatusContractorScope
09/24/2025Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
09/21/2021CompleteITKIN ELECTRIC CORP.Boiler Controls
08/17/2021CompleteV. VASS ELECTRIC CORP—
03/08/2021CompleteANGLER ELECTRICGeneral Wiring
1 project · most recent 02/08/2022
Scaffold
FiledStatusContractorScope
02/08/2022Permit IssuedSUTHERTON CNSTRN CORPScaffold
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/01/2024Pass-Final Boiler Equipment InspectionPassView ↗
01/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/28/2023Fail-Final Boiler Equipment InspectionFailView ↗
08/30/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
08/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
06/25/2024Fire-Resistant Penetrations and JointsMehmet Gunalspecial
06/25/2024HVAC and service water heating equipment Mehmet Gunalenergy_progress
06/25/2024HVAC and service water heating system controls Mehmet Gunalenergy_progress
06/25/2024HVAC insulation and sealing Mehmet Gunalenergy_progress
06/25/2024Maintenance informationMehmet Gunalenergy_progress
06/25/2024Energy Code Compliance InspectionsMehmet Gunalprogress
06/04/2024Maintenance informationMehmet Gunalenergy_progress
06/04/2024HVAC insulation and sealing Mehmet Gunalenergy_progress
06/04/2024HVAC and service water heating system controls Mehmet Gunalenergy_progress
06/04/2024Energy Code Compliance InspectionsMehmet Gunalprogress
06/04/2024Fire-Resistant Penetrations and JointsMehmet Gunalspecial
06/04/2024HVAC and service water heating equipment Mehmet Gunalenergy_progress
03/01/2024Maintenance informationMehmet Gunalenergy_progress
03/01/2024HVAC and service water heating equipment Mehmet Gunalenergy_progress
03/01/2024HVAC and service water heating system controls Mehmet Gunalenergy_progress
03/01/2024Energy Code Compliance InspectionsMehmet Gunalprogress
03/01/2024Fire-Resistant Penetrations and JointsMehmet Gunalspecial
03/01/2024HVAC insulation and sealing Mehmet Gunalenergy_progress
01/30/2024Maintenance informationMehmet Gunalenergy_progress
01/30/2024Fire-Resistant Penetrations and JointsMehmet Gunalspecial
01/30/2024Energy Code Compliance InspectionsMehmet Gunalprogress
01/30/2024HVAC and service water heating equipment Mehmet Gunalenergy_progress
01/30/2024HVAC insulation and sealing Mehmet Gunalenergy_progress
01/30/2024HVAC and service water heating system controls Mehmet Gunalenergy_progress
01/11/2024HVAC and service water heating equipment Mehmet Gunalenergy_progress
Latest 25 of 82.
▾Documents — 263 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch - Plumbing13
08/27/2026M00324191-P2Request digital key ↗
08/27/2026M00324191-P7Request digital key ↗
08/27/2026M00324191-P3Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch11
09/03/2026M00521772-I1Request digital key ↗
09/03/2026M00525973-P1Request digital key ↗
09/03/2026M00525973-P3Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment5
08/28/2026M00385130-I1Request digital key ↗
08/28/2026M00385130-P4Request digital key ↗
08/28/2026M00385130-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00375454-I1Request digital key ↗
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION10
09/21/2022140953715Open ↗
09/20/2022140953715Open ↗
10/22/2021140953715Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION5
01/25/2022140953715Open ↗
02/03/2021140942719Open ↗
02/01/2021140966079Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications97
▸DOB NOWProgress Inspector Seal & Signature41
09/02/2026M00385130-P1Open ↗
09/02/2026M00385130-P1Open ↗
09/02/2026M00385130-P1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
09/03/2026M00525973-P1Open ↗
09/03/2026M00525973-P2Open ↗
09/03/2026M00525973-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/02/2026M00385130-P1Open ↗
09/02/2026M00385130-P1Open ↗
09/01/2026M00521772-I1Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/16/2020140966079Open ↗
09/21/2020140953715Open ↗
09/10/2020140942719Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/31/2012121057131Open ↗
04/26/2012121057131Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/21/2020140953715Open ↗
09/10/2020140942719Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/21/2020140953715Open ↗
09/10/2020140942719Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/16/2020140966079Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
04/26/2012121057131Open ↗
▸Safety & Tenant Protection17
▸DOB NOWTenant Protection Plan14
08/27/2026M00324191-P3Open ↗
08/27/2026M00324191-P2Open ↗
08/27/2026M00324191-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES3
10/16/2020140966079Open ↗
09/21/2020140953715Open ↗
09/10/2020140942719Open ↗
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
09/03/2026M00525973-P2Open ↗
09/03/2026M00525973-P1Open ↗
09/03/2026M00525973-I1Open ↗
Showing 3 of 20 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
01/25/2022140953715Open ↗
02/03/2021140942719Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
04/26/2012121057131Open ↗
04/26/2012121057131Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00375454-I1Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
02/05/2024140966079Open ↗
02/02/2024140966079Open ↗
01/23/2024140942719Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
10/16/2020140966079Open ↗
09/21/2020140953715Open ↗
09/10/2020140942719Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
02/02/2024140966079Open ↗
01/23/2024140942719Open ↗
03/30/2023140953715Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026M00375454-I1Open ↗
08/13/2026M00385130-I1Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/30/2023140953715Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/30/2023140953715Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00521772-I1Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY9
02/05/2024140966079Open ↗
02/02/2024140966079Open ↗
01/23/2024140942719Open ↗
Showing 3 of 9 on file for this type
▸BISMASONRY1
03/30/2023140953715Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
03/30/2023140953715Open ↗
▸Approvals, Objections & Sign-offs32
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter23
09/03/2026M00525973-I1Open ↗
09/03/2026M00525973-P1Open ↗
09/03/2026M00525973-P2Open ↗
Showing 3 of 23 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
02/06/2024140966079Open ↗
01/24/2024140942719Open ↗
03/31/2023140953715Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)2
09/21/2020140953715Open ↗
09/10/2020140942719Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
09/02/2026M00597355-I1Open ↗
08/13/2026M00597355-P1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/26/2012121057131Open ↗
▸BISFINAL1
03/30/2023140953715Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT4
10/16/2020140966079Open ↗
09/21/2020140953715Open ↗
09/10/2020140942719Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
02/06/2024140966079Open ↗
01/23/2024140942719Open ↗
03/30/2023140953715Open ↗
▸Filing & Intake Forms6
▸BISEFILING JOB APPLICATION COVER SHEET3
10/16/2020140966079Open ↗
09/21/2020140953715Open ↗
09/10/2020140942719Open ↗
▸BISADDITIONAL INFORMATION2
08/17/2021140942719Open ↗
10/22/2020140966079Open ↗
▸BISEFILING COVER SHEET1
04/26/2012121057131Open ↗
▸Other Documents3
▸BISFEE EXEMPTION DOCUMENTATION2
09/21/2020140953715Open ↗
09/10/2020140942719Open ↗
▸BISLOCAL LAW - SUPPORTING DOCUMENTATION1
09/21/2020140953715Open ↗