Public elementary, junior or senior high
The New School for Leadership and Journalism
120 WEST 231 STREET · BIN 2015547
💬 Discuss this project
1957Year Built
3Stories
W1Building Class
R6Zoning
157,584 sfGross Floor Area
1Units
LL97 Covered17 Open Violations 4 unresolved · 13 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 95,778 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Roof1p · 1 filing · 10 docs
Floor 21p · 1 filing · 20 docs
Floor 1
Basement1p · 1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY PUBLIC SCHOOL109/13/2026
AMERESCO404/09/2026
NYC DEPARTMENT OF EDUCATION203/22/2026
DEPARTMENT OF EDUCATION603/22/2026
DOE I.S.143503/22/2026
DEPT. OF EDUCATION I.S. 1103/22/2026
DOE IS 143 040403/22/2026
DEPT OF EDUCATION/ IS 143403/22/2026
DOE 040203/22/2026
D.O.E 04103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EME GROUP/SALAS O'BRIEN208/27/2026
HOMERUN SOLAR108/01/2025
DMR ARCHITECTS710/31/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DO RITE MECHANICAL CORPPlumbing207/08/2026
THOMAS STONEElectrical203/21/2026
CHANDRAPAUL BHARRATTElectrical103/21/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
EVEREST ELECTRIC CORPElectrical103/22/2026
ANCO ELECTL CONTCTNG INCElectrical103/22/2026
TOTARO, CHRISTOPHERElectrical103/21/2026
SHAHEEN CONSTRUCTION CORPGeneral Contractor104/09/2026
SUNRISE ELECTRICAL SRVGeneral Contractor104/09/2026
BRIAN CHEBUSKEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351208/27/2026
HOMERUN SOLAR8772108/01/2025
FUTURE TECH CONSULTANTS O589610/31/2024
TWIN PEAKS INC.317104/01/2023
Building Lifecycle
All (109)Filed (10)Permit Issued (4)Signed Off (3)Violation (60)Inspection (2)Objection (6)Special Inspection (24)
09/14/2026
Objection raised — Other
09/14/2026
Objection raised — Other
08/27/2026
Filed — Alteration
THE SCOPE OF WORK INCLUDES ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO COMPLETE INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEM IN THE THIRD FLOOR SERVING LINE AREA AND KITCHEN.
X01446998-I1
08/17/2026
Special inspection requirement — Mechanical Systems
Asma Hashmi
08/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
08/17/2026
Special inspection requirement — Maintenance information
Asma Hashmi
08/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
08/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
08/17/2026
Special inspection requirement — Final
Asma Hashmi
08/17/2026
Special inspection requirement — Post-installed Anchors
Asma Hashmi
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
08/13/2026
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON ROOF INCLUDING ALL RELATED STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01230168-I1
08/04/2026
Filed — Alteration
THE SCOPE OF WORK INCLUDES ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO COMPLETE INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEM IN THE THIRD FLOOR SERVING LINE AREA AND KITCHEN.
X01437259-I1
12/23/2025
Violation issued (ECB, open)
Elevators
12/02/2025
Signed off — Alteration
REPLACE AUDITORIUM SEATING AND FLOOR FINISH. Remove and replace existing drinking fountain with new ADA compliant Drinking Fountain and repair related wall repair.
X00777228-S1
12/02/2025
Signed off — Alteration
REPLACE AUDITORIUM SEATING AND FLOOR FINISH. Remove and replace existing drinking fountain with new ADA compliant Drinking Fountain and repair related wall repair.
X00777228-I1
11/28/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/05/2025
Permit issued — Solar
X01230168-I1-SL
08/01/2025
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON ROOF INCLUDING ALL RELATED STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01230168-I1
05/22/2025
Special inspection requirement — Energy Code Compliance Inspections
RAYMOND PANCHARI
05/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAYMOND PANCHARI
05/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
RAYMOND PANCHARI
05/22/2025
Special inspection requirement — Final
RAYMOND PANCHARI
05/22/2025
Special inspection requirement — Air barrier - visual inspection
RAYMOND PANCHARI
04/02/2025
Violation issued (ECB, open)
Construction
04/02/2025
Violation issued (ECB, open)
Construction
04/02/2025
Violation issued (ECB, open)
Construction
04/02/2025
Violation issued (ECB, open)
Construction
03/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/23/2024
Permit issued — Plumbing
X00777228-S1-PL
11/04/2024
Special inspection requirement — Post-installed Anchors
Noel Tolentino
11/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
10/31/2024
Filed — Alteration
REPLACE AUDITORIUM SEATING AND FLOOR FINISH. Remove and replace existing drinking fountain with new ADA compliant Drinking Fountain and repair related wall repair.
X00777228-P5
10/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
10/31/2024
Special inspection requirement — Post-installed Anchors
Noel Tolentino
10/21/2024
Filed — Alteration
REPLACE AUDITORIUM SEATING AND FLOOR FINISH. Remove and replace existing drinking fountain with new ADA compliant Drinking Fountain and repair related wall repair.
X00777228-P4
07/29/2024
Violation issued (ECB, open)
Elevators
04/08/2024
Violation issued (ECB, open)
Construction
04/08/2024
Violation issued (ECB, open)
Construction
04/08/2024
Violation issued (ECB, closed)
Construction
04/08/2024
Violation issued (ECB, open)
Construction
04/08/2024
Violation issued (ECB, open)
Construction
12/27/2023
Permit issued — Plumbing
X00777228-S1-PL
12/20/2023
Permit issued — General Construction
X00777228-I1-GC
12/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
12/19/2023
Filed — Alteration
REPLACE AUDITORIUM SEATING AND FLOOR FINISH. Remove and replace existing drinking fountain with new ADA compliant Drinking Fountain and repair related wall repair.
X00777228-P3
12/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
12/13/2023
Filed — Alteration
REPLACE AUDITORIUM SEATING AND FLOOR FINISH. Remove and replace existing drinking fountain with new ADA compliant Drinking Fountain and repair related wall repair.
X00777228-P2
12/13/2023
Special inspection requirement — Post-installed Anchors
Noel Tolentino
12/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
11/15/2023
Objection resolved — Addressed
11/15/2023
Objection resolved — Addressed
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/10/2023
Objection raised — Other
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRISE ELECTRICAL SRV08/05/2025
DOB NOWPlumbingSigned-offDO RITE MECHANICAL CORP12/23/2024
DOB NOWPlumbingSigned-offDO RITE MECHANICAL CORP12/27/2023
DOB NOWGeneral ConstructionSigned-offSHAHEEN CONSTRUCTION CORP12/20/2023
BISPLISSUEDROCON CORP06/09/2022
BISMHISSUEDROCON CORP03/21/2022
BISMHISSUEDROCON CORP03/21/2022
BISOTISSUEDROCON CORP03/21/2022
BISOTISSUEDROCON CORP03/21/2022
BISOTISSUEDROCON CORP03/21/2022
BISEQISSUEDROCON CORP04/20/2021
BISOTISSUEDROCON CORP03/25/2021
BISOTISSUEDROCON CORP03/24/2021
BISMHISSUEDROCON CORP03/24/2021
BISOTISSUEDROCON CORP03/24/2021
BISBLISSUEDROCON CORP03/24/2021
BISOTISSUEDROCON CORP03/24/2021
BISEQISSUEDROCON CORP10/22/2020
BISPLISSUEDROCON CORP05/18/2020
BISEQISSUEDROCON CORP04/22/2020
BISOTISSUEDROCON CORP03/19/2020
BISBLISSUEDROCON CORP03/19/2020
BISOTISSUEDROCON CORP03/19/2020
BISMHISSUEDROCON CORP03/18/2020
BISOTISSUEDROCON CORP03/18/2020
BISOTISSUEDROCON CORP03/18/2020
BISEQISSUEDROCON CORP10/31/2019
BISPLISSUEDROCON CORP06/03/2019
BISOTISSUEDROCON CORP03/18/2019
BISOTISSUEDROCON CORP03/18/2019
BISMHRE-ISSUEDROCON CORP03/18/2019
BISOTISSUEDROCON CORP03/18/2019
BISOTISSUEDROCON CORP03/18/2019
BISEQISSUEDROCON CORP10/24/2018
BISEQISSUEDROCON CORP10/24/2018
BISOTISSUEDKOKO CONTRACTING INC05/18/2018
BISOTISSUEDROCON CORP04/25/2018
BISOTISSUEDROCON CORP04/25/2018
BISOTISSUEDROCON CORP04/25/2018
BISMHISSUEDROCON CORP04/25/2018
+ 14 more permits on file
2 projects · most recent 08/27/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/27/2026——Air Conditioning Systems
Cooling
Lg LG ZRNU363SRAA 35,000 BTU · Fan Coil Indoor ×4
LG ZRUM060GSS0 60,000 BTU · Condensing Unit ×2
LG ZRNU243SKSA 35,000 BTU · Vrf Indoor ×1
LG ZRUN024GSS0 24,000 BTU · Vrf Outdoor ×1
08/04/2026——Air Conditioning Systems
Cooling
Lg LG ZRNU363SRAA 35,000 BTU · Fan Coil Indoor ×4
LG ZRUM060GSS0 60,000 BTU · Condensing Unit ×2
LG ZRNU243SKSA 35,000 BTU · Vrf Indoor ×1
LG ZRUN024GSS0 24,000 BTU · Vrf Outdoor ×1
21 projects · most recent 02/11/2026
General Wiring
FiledStatusContractorScope
02/11/2026CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
09/11/2025Permit IssuedARCADIA ELECT'L CO. INC.General Wiring
07/30/2025CompleteSUNRISE ELEC'L SERVICES—
07/14/2025CompleteEVEREST ELECTRIC CORPGeneral Wiring
01/15/2025CompleteANCO ELECTL CONTCTNG INC—
12/02/2024CompleteEVEREST ELECTRIC CORP—
01/24/2024CompletePRECISION ELECL CONT CORPGeneral Wiring
11/16/2023CompleteANCO ELECTL CONTCTNG INC—
10/16/2023CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
10/05/2023CompleteMNBC ELECTRICAL CORPGeneral Wiring
08/07/2023CompleteANCO ELECTL CONTCTNG INC—
10/18/2021CompleteCHARAN ELEC'L ENTERP'S IN—
06/28/2021CompleteCHARAN ELEC'L ENTERP'S IN—
09/16/2020CompleteCHARAN ELEC'L ENTERP'S IN—
01/31/2020CompleteCHARAN ELEC'L ENTERP'S IN—
1 project · most recent 08/01/2025
FiledStatusContractorScope
08/01/2025Signed-offSUNRISE ELECTRICAL SRV473 panels, 274.34 kw, 11,825 roof_area_sqft
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/28/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
08/17/2026Mechanical SystemsAsma Hashmispecial
08/17/2026HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
08/17/2026Maintenance informationAsma Hashmienergy_progress
08/17/2026HVAC-R and service water heating equipmentAsma Hashmienergy_progress
08/17/2026HVAC-R and service water heating system controlsAsma Hashmienergy_progress
08/17/2026Energy Code Compliance InspectionsAsma Hashmiprogress
08/17/2026FinalAsma Hashmiprogress
08/17/2026Post-installed AnchorsAsma Hashmispecial
08/17/2026Fire-Resistant Penetrations and JointsAsma Hashmispecial
05/22/2025Energy Code Compliance InspectionsRAYMOND PANCHARIprogress
05/22/2025Fire-Resistant Penetrations and JointsRAYMOND PANCHARIspecial
05/22/2025Structural Stability – Alterations of existing buildingsRAYMOND PANCHARIspecial
05/22/2025FinalRAYMOND PANCHARIprogress
05/22/2025Air barrier - visual inspectionRAYMOND PANCHARIenergy_progress
11/04/2024Post-installed AnchorsNoel Tolentinospecial
11/04/2024Fire-Resistant Penetrations and JointsNoel Tolentinospecial
10/31/2024Fire-Resistant Penetrations and JointsNoel Tolentinospecial
10/31/2024Post-installed AnchorsNoel Tolentinospecial
12/20/2023Fire-Resistant Penetrations and JointsNoel Tolentinospecial
12/19/2023Fire-Resistant Penetrations and JointsNoel Tolentinospecial
12/13/2023Post-installed AnchorsNoel Tolentinospecial
12/13/2023Fire-Resistant Penetrations and JointsNoel Tolentinospecial
03/31/2023Post-installed AnchorsMIKHAIL ZEYGMANspecial
03/31/2023Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
J.h.s. 143EducationFloor 3
Project X01437259 Alteration · Approved · 08/04/2026
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/13/2026X01446998-I1Request digital key ↗
08/23/2026X00777228-S1Request digital key ↗
08/23/2026X00777228-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/13/2026X01446998-I1Open ↗
08/23/2026X00777228-S1Open ↗
08/23/2026X00777228-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/27/2026X00777228-S1Open ↗
09/01/2026X00777228-P2Open ↗
09/01/2026X00777228-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026X01230168-I1Open ↗
08/27/2026X01230168-I1Open ↗
08/27/2026X01230168-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/23/2026X00777228-I1Open ↗
08/23/2026X00777228-P5Open ↗
08/23/2026X00777228-P4Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
09/13/2026X01446998-I1Open ↗
08/13/2026X00777228-P2Open ↗
08/13/2026X00777228-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)7
08/13/2026X00777228-P5Open ↗
08/13/2026X00777228-P2Open ↗
08/13/2026X00777228-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026X00777228-I1Open ↗
08/13/2026X00777228-S1Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/18/2026X01230168-I1Open ↗
▸Other Documents9
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal7
08/13/2026X00777228-P2Open ↗
08/13/2026X00777228-P5Open ↗
08/13/2026X00777228-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWNYCSCA Exhibit 22
08/13/2026X00777228-S1Open ↗
08/13/2026X00777228-I1Open ↗