← Back
BuildNYC
Public elementary, junior or senior high
The Marie Curie High School for Medicine, Nursing, and Health Professions
120 WEST 231ST STREET · BIN 2015547
💬 Discuss this project
1957Year Built
3Stories
W1Building Class
R6Zoning
157,584 sfGross Floor Area
1Units
LL97 Covered8 Active Violations 0 unresolved · 8 paperwork only 3 likely answered ▸
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 95,778 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAmeresco6p · 1 filing · 9 docs
Floor 3J.H.S. 143 Eleanor Roosevelt2 filings · 2 docs
Floor 2I.S. 2448p · 1 filing · 20 docs
Floor 1
CellarAmeresco5p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority8704/09/2026
NYC Department of Education403/22/2026
New York City Public School109/13/2026
Department of Design103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Eme Group/Salas O'Brien208/27/2026
Homerun Solar108/01/2025
DMR Architects710/31/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Do Rite MechanicalPlumbing207/08/2026
Charan Electrical Enterp'sElectrical203/21/2026
MNBC ElectricalElectrical103/21/2026
Charan Electrical Enterp'sElectrical103/22/2026
Everest ElectricElectrical103/22/2026
Anco Electl ContctngElectrical103/22/2026
Tru-Val ElectricElectrical103/21/2026
Shaheen ConstructionGeneral Contractor104/09/2026
Sunrise Electrical SRVspecialty_contractor104/09/2026
Sunrise Electrical ServicesElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC Logistics Dba JPCL EN351208/27/2026
Homerun Solar8772108/01/2025
Future Tech Consultants O589610/31/2024
Twin Peaks317104/01/2023
Building Lifecycle
All (115)Filed (10)Permit Issued (4)Signed Off (3)Violation (60)Inspection (2)Objection (6)Special Inspection (30)
09/14/2026
Objection raised — Other
09/14/2026
Objection raised — Other
08/27/2026
Filed — Alteration
THE SCOPE OF WORK INCLUDES ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO COMPLETE INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEM IN THE THIRD FLOOR SERVING LINE AREA AND KITCHEN.
X01446998-I1
08/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
08/17/2026
Special inspection requirement — Mechanical Systems
Asma Hashmi
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
08/17/2026
Special inspection requirement — Post-installed Anchors
Asma Hashmi
08/17/2026
Special inspection requirement — Final
Asma Hashmi
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
08/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
08/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
08/17/2026
Special inspection requirement — Maintenance information
Asma Hashmi
08/13/2026
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON ROOF INCLUDING ALL RELATED STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01230168-I1
08/04/2026
Filed — Alteration
THE SCOPE OF WORK INCLUDES ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO COMPLETE INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEM IN THE THIRD FLOOR SERVING LINE AREA AND KITCHEN.
X01437259-I1
07/28/2026
Special inspection requirement — Mechanical Systems
Asma Hashmi
07/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
07/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
07/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
07/28/2026
Special inspection requirement — Maintenance information
Asma Hashmi
07/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
07/28/2026
Special inspection requirement — Final
Asma Hashmi
07/28/2026
Special inspection requirement — Post-installed Anchors
Asma Hashmi
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
12/02/2025
Signed off — Alteration
REPLACE AUDITORIUM SEATING AND FLOOR FINISH. Remove and replace existing drinking fountain with new ADA compliant Drinking Fountain and repair related wall repair.
X00777228-S1
12/02/2025
Signed off — Alteration
REPLACE AUDITORIUM SEATING AND FLOOR FINISH. Remove and replace existing drinking fountain with new ADA compliant Drinking Fountain and repair related wall repair.
X00777228-I1
11/28/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/24/2025
Violation issued (ECB, open)
Elevators
08/05/2025
Permit issued — Solar
X01230168-I1-SL
08/01/2025
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON ROOF INCLUDING ALL RELATED STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01230168-I1
05/22/2025
Special inspection requirement — Air barrier - visual inspection
RAYMOND PANCHARI
05/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAYMOND PANCHARI
05/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
RAYMOND PANCHARI
05/22/2025
Special inspection requirement — Energy Code Compliance Inspections
RAYMOND PANCHARI
05/22/2025
Special inspection requirement — Final
RAYMOND PANCHARI
04/02/2025
Violation issued (ECB, closed)
Construction
04/02/2025
Violation issued (ECB, open)
Construction
04/02/2025
Violation issued (ECB, open)
Construction
04/02/2025
Violation issued (ECB, closed)
Construction
03/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/23/2024
Permit issued — Plumbing
X00777228-S1-PL
11/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
11/04/2024
Special inspection requirement — Post-installed Anchors
Noel Tolentino
10/31/2024
Filed — Alteration
REPLACE AUDITORIUM SEATING AND FLOOR FINISH. Remove and replace existing drinking fountain with new ADA compliant Drinking Fountain and repair related wall repair.
X00777228-P5
10/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
10/31/2024
Special inspection requirement — Post-installed Anchors
Noel Tolentino
10/21/2024
Filed — Alteration
REPLACE AUDITORIUM SEATING AND FLOOR FINISH. Remove and replace existing drinking fountain with new ADA compliant Drinking Fountain and repair related wall repair.
X00777228-P4
07/29/2024
Violation issued (ECB, open)
Elevators
04/08/2024
Violation issued (ECB, open)
Construction
04/08/2024
Violation issued (ECB, closed)
Construction
04/08/2024
Violation issued (ECB, closed)
Construction
04/08/2024
Violation issued (ECB, closed)
Construction
04/08/2024
Violation issued (ECB, open)
Construction
12/27/2023
Permit issued — Plumbing
X00777228-S1-PL
12/20/2023
Permit issued — General Construction
X00777228-I1-GC
12/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
12/19/2023
Filed — Alteration
REPLACE AUDITORIUM SEATING AND FLOOR FINISH. Remove and replace existing drinking fountain with new ADA compliant Drinking Fountain and repair related wall repair.
X00777228-P3
12/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
Latest 60 of 115 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrise Electrical SRV08/05/2025
DOB NOWPlumbingSigned-offDo Rite Mechanical12/23/2024
DOB NOWPlumbingSigned-offDo Rite Mechanical12/27/2023
DOB NOWGeneral ConstructionSigned-offShaheen Construction12/20/2023
BISPLISSUEDRocon06/09/2022
BISMHISSUEDRocon03/21/2022
BISMHISSUEDRocon03/21/2022
BISOTISSUEDRocon03/21/2022
BISOTISSUEDRocon03/21/2022
BISOTISSUEDRocon03/21/2022
BISEQISSUEDRocon04/20/2021
BISOTISSUEDRocon03/25/2021
BISOTISSUEDRocon03/24/2021
BISMHISSUEDRocon03/24/2021
BISOTISSUEDRocon03/24/2021
BISBLISSUEDRocon03/24/2021
BISOTISSUEDRocon03/24/2021
BISEQISSUEDRocon10/22/2020
BISPLISSUEDRocon05/18/2020
BISEQISSUEDRocon04/22/2020
BISOTISSUEDRocon03/19/2020
BISBLISSUEDRocon03/19/2020
BISOTISSUEDRocon03/19/2020
BISMHISSUEDRocon03/18/2020
BISOTISSUEDRocon03/18/2020
BISOTISSUEDRocon03/18/2020
BISEQISSUEDRocon10/31/2019
BISPLISSUEDRocon06/03/2019
BISOTISSUEDRocon03/18/2019
BISOTISSUEDRocon03/18/2019
BISMHRE-ISSUEDRocon03/18/2019
BISOTISSUEDRocon03/18/2019
BISOTISSUEDRocon03/18/2019
BISEQISSUEDRocon10/24/2018
BISEQISSUEDRocon10/24/2018
BISOTISSUEDKoko Contracting05/18/2018
BISOTISSUEDRocon04/25/2018
BISOTISSUEDRocon04/25/2018
BISOTISSUEDRocon04/25/2018
BISMHISSUEDRocon04/25/2018
+ 14 more permits on file
2 projects · most recent 08/27/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/27/2026——Air Conditioning Systems
Cooling
Lg LG ZRNU363SRAA 35,000 BTU · Fan Coil Indoor ×4
LG ZRUM060GSS0 60,000 BTU · Condensing Unit ×2
LG ZRNU243SKSA 35,000 BTU · Vrf Indoor ×1
LG ZRUN024GSS0 24,000 BTU · Vrf Outdoor ×1
08/04/2026——Air Conditioning Systems
Cooling
Lg LG ZRNU363SRAA 35,000 BTU · Fan Coil Indoor ×4
LG ZRUM060GSS0 60,000 BTU · Condensing Unit ×2
LG ZRNU243SKSA 35,000 BTU · Vrf Indoor ×1
LG ZRUN024GSS0 24,000 BTU · Vrf Outdoor ×1
21 projects · most recent 02/11/2026
General Wiring
FiledStatusContractorScope
02/11/2026CompleteCharan Electrical Enterp'sGeneral Wiring
09/11/2025Permit IssuedArcadia Elect'l CoGeneral Wiring
07/30/2025CompleteSunrise Electrical Services—
07/14/2025CompleteEverest ElectricGeneral Wiring
01/15/2025CompleteAnco Electl Contctng—
12/02/2024CompleteEverest Electric—
01/24/2024CompletePrecision Electrical ContGeneral Wiring
11/16/2023CompleteAnco Electl Contctng—
10/16/2023CompleteCharan Electrical Enterp'sGeneral Wiring
10/05/2023CompleteMNBC ElectricalGeneral Wiring
08/07/2023CompleteAnco Electl Contctng—
10/18/2021CompleteCharan Electrical Enterp's—
06/28/2021CompleteCharan Electrical Enterp's—
09/16/2020CompleteCharan Electrical Enterp's—
01/31/2020CompleteCharan Electrical Enterp's—
1 project · most recent 08/01/2025
FiledStatusContractorScope
08/01/2025Signed-offSunrise Electrical SRV473 panels, 274.34 kw, 11,825 roof_area_sqft
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/28/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
08/17/2026HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
08/17/2026Mechanical SystemsAsma Hashmispecial
08/17/2026Fire-Resistant Penetrations and JointsAsma Hashmispecial
08/17/2026Post-installed AnchorsAsma Hashmispecial
08/17/2026FinalAsma Hashmiprogress
08/17/2026Energy Code Compliance InspectionsAsma Hashmiprogress
08/17/2026HVAC-R and service water heating system controlsAsma Hashmienergy_progress
08/17/2026HVAC-R and service water heating equipmentAsma Hashmienergy_progress
08/17/2026Maintenance informationAsma Hashmienergy_progress
07/28/2026Mechanical SystemsAsma Hashmispecial
07/28/2026HVAC-R and service water heating system controlsAsma Hashmienergy_progress
07/28/2026HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
07/28/2026HVAC-R and service water heating equipmentAsma Hashmienergy_progress
07/28/2026Maintenance informationAsma Hashmienergy_progress
07/28/2026Energy Code Compliance InspectionsAsma Hashmiprogress
07/28/2026FinalAsma Hashmiprogress
07/28/2026Post-installed AnchorsAsma Hashmispecial
07/28/2026Fire-Resistant Penetrations and JointsAsma Hashmispecial
05/22/2025Air barrier - visual inspectionRAYMOND PANCHARIenergy_progress
05/22/2025Fire-Resistant Penetrations and JointsRAYMOND PANCHARIspecial
05/22/2025Structural Stability – Alterations of existing buildingsRAYMOND PANCHARIspecial
05/22/2025Energy Code Compliance InspectionsRAYMOND PANCHARIprogress
05/22/2025FinalRAYMOND PANCHARIprogress
11/04/2024Fire-Resistant Penetrations and JointsNoel Tolentinospecial
11/04/2024Post-installed AnchorsNoel Tolentinospecial
Latest 25 of 33.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
J.H.S. 143 Eleanor RooseveltEducationFloor 3
Project X01446998 Alteration · Approved · 08/27/2026
Project X01437259 Alteration · Approved · 08/04/2026
AmerescoOfficeCellar, Roof
Project X01230168 Alteration · LOC Issued · 08/01/2025
I.S. 244EducationFloor 2
Project X00777228 Alteration · LOC Issued · 07/19/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/13/2026X01446998-I1Request digital key ↗
08/23/2026X00777228-S1Request digital key ↗
08/23/2026X00777228-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/13/2026X01446998-I1Open ↗
08/23/2026X00777228-S1Open ↗
08/23/2026X00777228-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/27/2026X00777228-S1Open ↗
09/01/2026X00777228-P2Open ↗
09/01/2026X00777228-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026X01230168-I1Open ↗
08/27/2026X01230168-I1Open ↗
08/27/2026X01230168-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/23/2026X00777228-I1Open ↗
08/23/2026X00777228-P5Open ↗
08/23/2026X00777228-P4Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
09/13/2026X01446998-I1Open ↗
08/13/2026X00777228-P2Open ↗
08/13/2026X00777228-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)7
08/13/2026X00777228-P5Open ↗
08/13/2026X00777228-P2Open ↗
08/13/2026X00777228-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026X00777228-I1Open ↗
08/13/2026X00777228-S1Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/18/2026X01230168-I1Open ↗
▸Other Documents9
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal7
08/13/2026X00777228-P2Open ↗
08/13/2026X00777228-P5Open ↗
08/13/2026X00777228-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWNYCSCA Exhibit 22
08/13/2026X00777228-S1Open ↗
08/13/2026X00777228-I1Open ↗