Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Harsen House Condominium
120 WEST 72ND STREET · BIN 1087731
💬 Discuss this project
2007Year Built
10Stories
RMBuilding Class
C4-6AZoning
48,248 sfGross Floor Area
19Units
LL97 CoveredRent Stabilized3 Active Violations ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 5,109 sf lot · 9.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHarsen House Condominium17p · 2 filings · 16 docs
BulkheadVito Mangini1p · 1 filing · 6 docs
PenthouseUnit PH6p · 1 filing · 10 docs
Floor 1616p · 1 filing · 10 docs
Floor 1516p · 1 filing · 10 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Sprinkler work1 filing · 3 docs
Site & exteriorOrangetheory Fitness11p · 3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
120 West 72nd Street3803/21/2026
120 West 72 St1203/21/2026
Jobar Holding803/21/2026
The Harsen House Condominium703/21/2026
112 Central Park South203/21/2026
Anbau203/21/2026
Empire Portfolio Group103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KZ Engineering104/18/2024
Enthink Engineers110/14/2023
Wla Engineering108/01/2023
James P. Stroke, PE205/22/2023
Engineered Design Group107/12/2022
Salvator A. Caradonna JR108/12/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Wla Engineering P C203/21/2026
Bridge Expediting203/21/2026
Organisation Architecture203/21/2026
Synergy Building Consultants103/21/2026
All in Permit Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Andamio ScaffoldingScaffold303/21/2026
Borowide Elect'l ContractorsElectrical103/21/2026
PM Electrical MaintenanceElectrical103/21/2026
PM Electrical MaintenanceElectrical103/22/2026
Awr GroupGeneral Contractor107/08/2026
Metropolitan MechanicalGeneral Contractor107/08/2026
Empire Electric NYCElectrical103/22/2026
Neptune Signs & AwningsSign hanger107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ Engineering4665104/18/2024
Socotec Engineering4983108/01/2023
Wla Engineering1531108/01/2023
Vincent J. Liotta P. E1974205/22/2023
Crosscheck Inspection Services544107/12/2022
Building Lifecycle
All (97)Filed (7)Permit Issued (5)Signed Off (4)Facade (FISP) (6)Violation (60)Objection (2)Special Inspection (13)
07/17/2024
Signed off — Alteration
Exterior repairs. No change in use, occupancy or egress.
M00863517-I1
05/13/2024
Permit issued — Suspended Scaffold
M01024482-I1-SC
05/10/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00947838-I1
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/01/2024
Objection resolved — Addressed
04/30/2024
Objection raised — Scope
04/18/2024
Filed — Alteration
Installation of suspended scaffold during facade inspection/ Repair .
M01024482-I1
04/18/2024
Cycle 9 facade report signed — SWARMP
03/22/2024
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
03/22/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
02/12/2024
Cycle 9 facade report submitted
02/01/2024
Cycle 9 facade inspection completed
11/09/2023
Permit issued — General Construction
M00863517-I1-GC
10/16/2023
Permit issued — Sidewalk Shed
M00947838-I1-SH
10/14/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00947838-I1
10/13/2023
Signed off — Alteration
Installation of New HVAC System in Penthouse Apartment and Roof. No change in use Egress, or Occupancy.
M00692548-I1
08/01/2023
Filed — Alteration
Exterior repairs. No change in use, occupancy or egress.
M00863517-I1
05/22/2023
Filed — Alteration
Installation of New HVAC System in Penthouse Apartment and Roof. No change in use Egress, or Occupancy.
M00692548-P1
05/02/2023
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
04/21/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Lau
04/21/2023
Special inspection requirement — Final
William Lau
03/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
03/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vincent Liotta
03/14/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
03/14/2023
Special inspection requirement — Mechanical Systems
Vincent Liotta
03/14/2023
Special inspection requirement — Energy Code Compliance Inspections
Vincent Liotta
03/14/2023
Special inspection requirement — Final
JAMES STROKE
03/14/2023
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
11/04/2022
Permit issued — Mechanical Systems
M00692548-I1-MS
11/02/2022
Violation issued (HPD, closed)
I
10/07/2022
Filed — Alteration
Installation of New HVAC System in Penthouse Apartment and Roof. No change in use Egress, or Occupancy.
M00692548-I1
07/12/2022
Filed — Alteration
application filed for sprinkler work as per plans
M00770670-I1
07/07/2022
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
12/05/2019
Signed off — Alteration
ERECT NON-ILLUMINATED WALL SIGN AND NON-ILLUMINATED D/F BLADE SIGN. SIGNS ARE ACCESSORY TO ORANGETHEORY FITNESS. NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHAGNE IN USE, EGRESS OR OCCUPANCY.
M00182039-I1
11/04/2019
Violation issued (HPD, closed)
I
09/24/2019
Permit issued — Sign
M00182039-I1-SG
08/12/2019
Filed — Alteration
ERECT NON-ILLUMINATED WALL SIGN AND NON-ILLUMINATED D/F BLADE SIGN. SIGNS ARE ACCESSORY TO ORANGETHEORY FITNESS. NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHAGNE IN USE, EGRESS OR OCCUPANCY.
M00182039-I1
02/11/2019
Cycle 8 facade report submitted
02/03/2019
Cycle 8 facade report signed — SWARMP
01/28/2019
Cycle 8 facade inspection completed
10/26/2018
Violation issued (HPD, closed)
I
05/22/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/15/2018
Violation issued (ECB, closed)
Unknown
04/26/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/26/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/18/2013
Violation issued (ECB, closed)
Construction
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/16/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/16/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/24/2010
Violation issued (HPD, open)
A
09/24/2010
Violation issued (HPD, open)
A
09/24/2010
Violation issued (HPD, open)
A
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/15/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/15/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedAwr Group05/13/2024
DOB NOWGeneral ConstructionSigned-offAwr Group11/09/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding10/16/2023
DOB NOWMechanical SystemsSigned-offMetropolitan Mechanical11/04/2022
DOB NOWSignSigned-offNeptune Signs & Awnings09/24/2019
BISOTISSUEDHRBDX New York04/28/2021
BISMHISSUEDHRBDX New York04/28/2021
BISEQISSUEDCeprine Construction09/27/2018
BISPLISSUEDPilato Brothers Plumbing & Heating Co09/17/2018
BISMHISSUEDLuthy & Sons09/05/2018
BISOTISSUEDLuthy & Sons09/05/2018
BISEQISSUEDCeprine Construction09/26/2017
BISOTISSUEDSkyline Restoration06/18/2013
BISOTISSUEDSkyline Restoration01/18/2013
BISEQISSUEDSpring Scaffolding01/16/2013
BISEQISSUEDSpring Scaffolding11/19/2012
BISPLISSUEDZ.W. Plumbing & Heating08/01/2012
BISOTISSUEDInwood Interiors07/03/2012
BISEQISSUEDDL Restoration & Builders07/03/2012
BISSPISSUEDNew York Standard Mechanical Co01/10/2012
BISSPISSUEDSJ Vision & Son P & H06/14/2011
BISMHISSUEDBenco Interiors12/08/2010
BISOTISSUEDBenco Interiors12/08/2010
BISPLISSUEDJada Plumbing & Heating06/29/2010
BISOTISSUEDBenco Interiors06/23/2010
BISEQISSUEDPerimeter Bridge & Scaffo08/21/2009
BISSPISSUEDCma Plumbing & Heating06/22/2009
BISSDISSUEDCma Plumbing & Heating06/22/2009
BISPLISSUEDCopper Plumbing & Heating06/22/2009
BISPLISSUEDCopper Plumbing & Heating01/23/2009
BISOTISSUEDMerto Construction Enterprises08/25/2008
BISPLISSUEDPractical Plumbing & Heating07/25/2008
BISOTISSUEDFanuka07/22/2008
BISEQISSUEDPerimeter Bridge & Scaffold04/10/2008
BISSPISSUEDCma Plumbing & Heating03/06/2008
BISSDISSUEDCma Plumbing & Heating03/06/2008
BISEQISSUEDPermeter Bridge & Scaffold01/02/2008
BIS—ISSUEDMetro Construction Enterprises12/24/2007
BISPLISSUEDCopper Plumbing & Heating12/21/2007
BISPLISSUEDCopper Plumbing & Heating07/11/2007
+ 15 more permits on file
4 projects · most recent 10/18/2023
General Wiring
FiledStatusContractorScope
10/18/2023CompleteBorowide Elect'l Contractors—
02/02/2023CompletePM Electrical MaintenanceGeneral Wiring
11/12/2019CompleteEmpire Electric NYCGeneral Wiring
08/13/2019CompleteApollo ElectricGeneral Wiring
1 project · most recent 04/18/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
04/18/2024Permit IssuedAwr GroupSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
03/22/2024Post-installed AnchorsKarol Zdancewiczspecial
03/22/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
05/02/2023Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
04/21/2023Structural Stability – Alterations of existing buildingsWilliam Lauspecial
04/21/2023FinalWilliam Lauprogress
03/14/2023HVAC-R and service water heating equipmentVincent Liottaenergy_progress
03/14/2023Fire-Resistant Penetrations and JointsVincent Liottaspecial
03/14/2023HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
03/14/2023Mechanical SystemsVincent Liottaspecial
03/14/2023Energy Code Compliance InspectionsVincent Liottaprogress
03/14/2023FinalJAMES STROKEprogress
03/14/2023HVAC-R and service water heating system controlsVincent Liottaenergy_progress
07/07/2022Sprinkler SystemsEUGENE BIFULCOspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Orangetheory FitnessFitness / RecreationFloor 1
Project M00182039 Alteration · LOC Issued · 08/12/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 238 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
09/02/2026M00770670-I1Request digital key ↗
08/31/2026M00692548-I1Request digital key ↗
08/31/2026M00692548-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00182039-I1Request digital key ↗
▸Applications & Permits57
▸BISPLAN / WORK APPROVAL APPLICATION28
07/02/2022123655400Open ↗
07/02/2022123655400Open ↗
04/21/2021123547466Open ↗
Showing 3 of 28 on file for this type
▸BISWORK PERMIT APPLICATION25
04/30/2021123547466Open ↗
04/30/2021123547466Open ↗
10/03/2019140698920Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWLPC Approval/Permit3
08/13/2026M00863517-I1Open ↗
08/13/2026M00692548-P1Open ↗
08/13/2026M00692548-I1Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
02/11/2014140039562Open ↗
▸Seals & Professional Certifications58
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
01/15/2019123655400Open ↗
01/14/2019123655400Open ↗
09/06/2018123547466Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/02/2026M00770670-I1Open ↗
08/29/2026M00863517-I1Open ↗
08/29/2026M00947838-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
09/06/2018123547466Open ↗
09/06/2018123547466Open ↗
06/19/2012121115998Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/27/2026M00863517-I1Open ↗
08/27/2026M00863517-I1Open ↗
08/26/2026M01024482-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
09/06/2018123547466Open ↗
09/06/2018123547466Open ↗
09/25/2017140698920Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
06/19/2012121115998Open ↗
06/19/2012121115444Open ↗
08/21/2009120136600Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026M00863517-I1Open ↗
08/23/2026M00692548-P1Open ↗
08/23/2026M00692548-P1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/25/2017140698920Open ↗
11/28/2012140039786Open ↗
11/19/2012140039562Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
09/25/2017140698920Open ↗
11/28/2012140039786Open ↗
11/19/2012140039562Open ↗
▸Trade Schedules & Equipment17
▸BISSELF-CERT PLUMBING NOTICE7
03/12/2012120367780Open ↗
02/15/2012120367780Open ↗
09/22/2011120367780Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING6
06/19/2012121115444Open ↗
09/09/2011120367780Open ↗
07/19/2011120367780Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
01/15/2019123655400Open ↗
09/06/2018123547466Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
03/12/2012120367780Open ↗
02/15/2012120367780Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST4
01/15/2019123655400Open ↗
10/10/2018123480198Open ↗
06/19/2012121115998Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes3
01/14/2019123655400Open ↗
10/10/2018123480198Open ↗
09/25/2017140698920Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
08/21/2009120136600Open ↗
07/21/2008110225989Open ↗
Showing 2 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/02/2010120367780Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
01/15/2019123655400Open ↗
01/14/2019123655400Open ↗
09/06/2018123547466Open ↗
Showing 3 of 10 on file for this type
▸BISEN2 - As Built Energy Analysis2
07/31/2013121115998Open ↗
07/31/2013121115444Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
09/25/2017140698920Open ↗
11/19/2012140039562Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/28/2012140039786Open ↗
▸Approvals, Objections & Sign-offs33
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
07/14/2014140039786Open ↗
02/11/2014140039562Open ↗
07/31/2013121115998Open ↗
Showing 3 of 11 on file for this type
▸BISLANDMARKS APPROVAL6
09/06/2018123547466Open ↗
09/25/2017140698920Open ↗
07/14/2014140039786Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
06/19/2012121115998Open ↗
06/19/2012121115444Open ↗
06/03/2010120367780Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
07/02/2022123655400Open ↗
06/10/2020123655400Open ↗
01/14/2019123655400Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER3
10/03/2019140698920Open ↗
09/28/2018140698920Open ↗
01/17/2013140039562Open ↗
▸BISCCD1-Construction Code Determination2
01/18/2013140039786Open ↗
01/11/2013140039786Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/12/2012120367780Open ↗
12/18/2009120136600Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
01/14/2019123655400Open ↗
09/06/2018123547466Open ↗
07/14/2014140039786Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms19
▸BISEFILING COVER SHEET11
01/15/2019123655400Open ↗
01/14/2019123655400Open ↗
10/10/2018123480198Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION5
04/21/2021123547466Open ↗
11/19/2012140039562Open ↗
08/09/2012121115444Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
09/25/2017140698920Open ↗
11/28/2012140039786Open ↗
11/19/2012140039562Open ↗
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
07/31/2013121115444Open ↗
01/11/2013140039786Open ↗
01/11/2013140039786Open ↗
Showing 3 of 4 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
07/05/2012121115444Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01024482-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01024482-I1Open ↗