← Back
BuildNYC
Four families
120 WILLOUGHBY AVENUE
BROOKLYN · Clinton Hill · BIN 3055043
💬 Discuss this project
1891Year Built
4Stories
C3Building Class
R6BZoning
3,300 sfGross Floor Area
4Units
Rent Stabilized15 Active Violations 14 unresolved · 1 paperwork only ▸FDNY Report ↗
Four families · Owner of record: Nanval BK 1 · 1,248 sf lot · 2.64 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 37p · 2 filings · 7 docs
Floor 218p · 3 filings · 20 docs
Floor 118p · 3 filings · 20 docs
Cellar8p · 2 filings · 7 docs
Basement7p · 2 filings · 20 docs
Sub-Basement11p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Nanvalbk12507/08/2026
Lex Investment1407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/17/2021$2.0M—LEX INVEST LLC → Nanval BK 1$606/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rohan Development610/29/2024
Jon Paul Design & Consulting105/25/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VRD Development1203/21/2026
Jon Paul Design & Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Redi-ConstructionGeneral Contractor1407/08/2026
Pal-Mar Plumbing & HeatingPlumbing407/08/2026
Testa ElectricElectrical103/22/2026
A&A Building ConsultantsGeneral Contractor107/08/2026
WaxtelGeneral Contractor103/21/2026
Element InteriorsGeneral Contractor106/08/2021
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ase Engineering5785105/25/2021
Building Lifecycle
05/06/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
11/18/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
06/11/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
06/07/2025
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B00502960-I1-GC
11/25/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
70 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedA&A Building Consultants06/07/2024
DOB NOWPlumbingSigned-offPal-Mar Plumbing & Heating05/14/2024
DOB NOWPlumbingSigned-offPal-Mar Plumbing & Heating11/29/2023
DOB NOWGeneral ConstructionPermit IssuedRedi-Construction11/22/2023
DOB NOWGeneral ConstructionPermit IssuedRedi-Construction07/07/2023
DOB NOWGeneral ConstructionPermit IssuedRedi-Construction04/19/2023
DOB NOWGeneral ConstructionPermit IssuedRedi-Construction11/21/2022
DOB NOWGeneral ConstructionPermit IssuedRedi-Construction06/23/2022
DOB NOWGeneral ConstructionPermit IssuedRedi-Construction05/27/2022
DOB NOWPlumbingSigned-offPal-Mar Plumbing & Heating04/06/2021
DOB NOWPlumbingSigned-offPal-Mar Plumbing & Heating03/04/2021
BISOTISSUEDElement Interiors06/08/2021
BISOTISSUEDWaxtel02/24/2021
BISOTISSUEDWaxtel10/20/2020
1 project · most recent 08/16/2022
General Wiring
FiledStatusContractorScope
08/16/2022Permit IssuedTesta ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
10/30/2024Energy Code ComplianceBRIAN ROHANprogress
10/30/2024HVAC-R and service water piping design and insulationBRIAN ROHANenergy_progress
10/21/2024HVAC-R and service water piping design and insulationBRIAN ROHANenergy_progress
10/21/2024Energy Code ComplianceBRIAN ROHANprogress
09/30/2024Energy Code ComplianceBRIAN ROHANprogress
09/30/2024HVAC-R and service water piping design and insulationBRIAN ROHANenergy_progress
09/19/2024Construction Utilizing CLT or SCL, Type IV—special
02/24/2024Structural Stability – Alterations of existing buildings—special
02/24/2024Final—progress
02/24/2024Wood – Seismic Resistance—special
02/24/2024Structural Steel - Details—special
02/24/2024Mechanical Systems—special
02/19/2024Energy Code ComplianceBRIAN ROHANprogress
02/19/2024HVAC-R and service water piping design and insulationBRIAN ROHANenergy_progress
73 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account