← Back
BuildNYC
Church, synagogue, chapel
1200 ARDEN AVENUE
STATEN ISLAND · BIN 5145122
💬 Discuss this project
1968Year Built
1Stories
M1Building Class
R3-2Zoning
26,800 sfGross Floor Area
1Units
1 Active Violation 0 unresolved · 1 paperwork only ▸
Church, synagogue, chapel · Owner of record: Church of the Holy Child · 268,076 sf lot · 0.1 FAR built · Flood zone X
Locations of Work
Mechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHoly Child Church1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Holy Child Church209/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A Tech Engineering NYC107/13/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tristate Maintenance & SEGeneral Contractor107/16/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738107/13/2026
Building Lifecycle
All (5)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (2)
07/31/2026
Signed off — Alteration
Direct replacement of (4) rooftop HVAC package units on existing roof curbs.
S01420526-I1
07/15/2026
Permit issued — Mechanical Systems
S01420526-I1-MS
07/13/2026
Filed — Alteration
Direct replacement of (4) rooftop HVAC package units on existing roof curbs.
S01420526-I1
06/22/2026
Special inspection requirement — Mechanical Systems
anthony santoro
06/22/2026
Special inspection requirement — Final
anthony santoro
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTristate Maintenance & SE07/15/2026
1 project · most recent 07/13/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/13/2026Signed-offTristate Maintenance & SEHeating and Air Conditioning Systems
Heat / Cool
Luxaire KE060H12B2AAAAA1A1 57,000 BTU · Packaged Unit ×2
KE036H10B2AAAAA1A1 35,400 BTU · Packaged Unit ×1
KJ090N18R2AAAAA1A1 90,000 BTU · Packaged Unit ×1
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
06/22/2026Mechanical Systemsanthony santorospecial
06/22/2026Finalanthony santoroprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Holy Child ChurchReligiousRoof
Project S01420526 Alteration · LOC Issued · 07/13/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 2 on file (BIS + DOB NOW)
▸Seals & Professional Certifications2
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026S01420526-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026S01420526-I1Open ↗