← Back
BuildNYC
Condo, cultural / medical / educational
Nyu Medical Center Condominium
1200 FDR DRIVE · BIN 1088433
💬 Discuss this project
1900Year Built
—Stories
RABuilding Class
R8Zoning
2,216,199 sfGross Floor Area
8Units
LL97 CoveredRent Stabilized26 Active Violations 23 unresolved · 3 paperwork only ▸
Condo, cultural / medical / educational · 362,642 sf lot · 6.11 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 21NYU Langone Health1p · 1 filing · 8 docs
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4NYU Langone Health8p · 2 filings · 16 docs
Floor 3
Floor 2
Floor 1
MezzanineNYU Langone Health19p · 5 filings · 20 docs
Site & exteriorSidewalk shed installation3p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYU School of Medicine203/21/2026
NYU Medical Center Condominium103/21/2026
VP Real Estate NYU SCH of Medice103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Montroy Architecture104/21/2023
Active Design Group Engineering104/21/2023
Wayne Siladi101/25/2023
Vanderweil Engineers210/05/2022
Paul Perdek, Prof. Engineering104/10/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants1003/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Fresh Meadow Mechanicalspecialty_contractor407/08/2026
Dynamic USGeneral Contractor307/08/2026
Langan Engineering EnvironmentalGeneral Contractor303/22/2026
Top Shelf ElectricElectrical103/21/2026
PJP InstallersScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates423404/21/2023
Building Lifecycle
All (97)Filed (6)Permit Issued (7)Signed Off (6)Violation (60)Special Inspection (18)
06/11/2024
Signed off — Alteration
ENERGY BUILDING - MECHANICAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00793455-I1
02/13/2024
Signed off — Alteration
M00862116-I1
02/13/2024
Signed off — Alteration
M00862093-I1
10/24/2023
Signed off — Alteration
Install a secondary deaerator along with ancillary equipment on the 4th floor mezzanine in the energy building for NYULMC. The secondary deaerator will serve as a backup to the primary deaerator when the primary deaerator is down or service is required.
M00673059-I1
10/24/2023
Signed off — Alteration
M00673083-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/17/2023
Permit issued — Structural
M00862116-I1-ST
05/17/2023
Permit issued — General Construction
M00862093-I1-GC
04/27/2023
Permit issued — Mechanical Systems
M00673059-I1-MS
04/21/2023
Filed — Alteration
M00862116-I1
04/21/2023
Filed — Alteration
M00862093-I1
04/19/2023
Special inspection requirement — Final
Young Suh
04/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
04/19/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Young Suh
04/19/2023
Special inspection requirement — Structural Steel - Welding
Young Suh
04/19/2023
Special inspection requirement — Final
Young Suh
04/19/2023
Special inspection requirement — Structural Steel - Details
Young Suh
02/02/2023
Permit issued — Structural
M00673083-I1-ST
01/25/2023
Filed — Alteration
M00673083-I1
12/06/2022
Permit issued — Mechanical Systems
M00793455-I1-MS
10/05/2022
Filed — Alteration
ENERGY BUILDING - MECHANICAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00793455-I1
08/15/2022
Special inspection requirement — Maintenance information
Young Suh
08/15/2022
Special inspection requirement — Mechanical Systems
Young Suh
08/15/2022
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
08/15/2022
Special inspection requirement — Final
Young Suh
08/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
08/15/2022
Special inspection requirement — Electrical motors and elevators
Young Suh
04/15/2022
Permit issued — Mechanical Systems
M00673059-I1-MS
04/06/2022
Filed — Alteration
Install a secondary deaerator along with ancillary equipment on the 4th floor mezzanine in the energy building for NYULMC. The secondary deaerator will serve as a backup to the primary deaerator when the primary deaerator is down or service is required.
M00673059-I1
02/02/2022
Special inspection requirement — Mechanical Systems
Young Suh
02/02/2022
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
02/02/2022
Special inspection requirement — Maintenance information
Young Suh
02/02/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
02/02/2022
Special inspection requirement — Electrical motors and elevators
Young Suh
02/02/2022
Special inspection requirement — Final
Young Suh
12/10/2020
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.
M00341276-I1
04/16/2020
Permit issued — Sidewalk Shed
M00341276-I1-SH
04/10/2020
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.
M00341276-I1
03/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/22/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/22/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/12/2014
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
11/12/2014
Violation issued (ECB, closed)
Construction
10/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/06/2013
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
06/19/2012
Violation issued (ECB, closed)
Construction
06/19/2012
Violation issued (ECB, closed)
Construction
05/03/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/23/2007
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
01/23/2007
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
10/10/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/10/2006
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
10/10/2006
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
10/10/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/10/2006
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
07/12/2006
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offFresh Meadow Mechanical05/17/2023
DOB NOWGeneral ConstructionSigned-offFresh Meadow Mechanical05/17/2023
DOB NOWMechanical SystemsSigned-offDynamic US04/27/2023
DOB NOWStructuralSigned-offDynamic US02/02/2023
DOB NOWMechanical SystemsSigned-offFresh Meadow Mechanical12/06/2022
DOB NOWMechanical SystemsSigned-offDynamic US04/15/2022
DOB NOWSidewalk ShedSigned-offPJP Installers04/16/2020
BISMHISSUEDFresh Meadow Mechanical04/15/2019
BISMHISSUEDFresh Meadow Mechanical07/18/2016
BISSPISSUEDWDF02/25/2016
BISFPISSUEDSirina Fire Protection12/03/2015
BIS—ISSUEDTurner Construction Company11/19/2015
BISMHISSUEDTurner Construction Company10/30/2015
BISFPISSUEDSirina Fire Protection10/28/2015
BISFPISSUEDUnited Fire Protection09/10/2015
BISPLISSUEDFresh Meadow Mechanical Plumbing08/27/2015
BISPLISSUEDFresh Meadow Mechanical Plumbing08/27/2015
BISMHISSUEDFresh Meadow Mechanical07/14/2015
BISEQISSUEDSafway Atlantic04/09/2015
BISSDISSUEDWDF02/20/2015
BISSDISSUEDWDF02/20/2015
BISSDISSUEDWDF02/20/2015
BISSDISSUEDWDF02/20/2015
BISSPISSUEDWDF02/20/2015
BISMHISSUEDTurner Construction Company12/09/2014
BISPLISSUEDFresh Meadow Mechanical Plumbing12/09/2014
BISPLISSUEDFresh Meadow Mechanical Plumbing12/09/2014
BISOTISSUEDTurner Construction Company12/09/2014
BISOTISSUEDSkanska USA Building11/21/2014
BIS—ISSUEDTurner Construction Company11/21/2014
BISOTISSUEDSkanska USA Building11/21/2014
BISEQISSUEDTurner Construction Company11/20/2014
BISOTISSUEDTurner Construction Company10/29/2014
BISSPISSUEDWDF, Inc Dba WDF Federate10/06/2014
BISSDISSUEDWDF, Inc Dba WDF Federate10/06/2014
BISBLISSUEDPeter Agliardo Contractor09/23/2014
BISPLISSUEDCardoza Plumbing08/28/2014
BISPLISSUEDFresh Meadow Mechanical Plumbing08/15/2014
BISPLISSUEDFresh Meadow Mechanical Plumbing08/15/2014
BISMHISSUEDFresh Meadow Mechanical08/01/2014
+ 17 more permits on file
1 project · most recent 04/07/2020
FiledStatusContractorScope
04/07/2020CompleteTop Shelf Electric—
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
04/19/2023FinalYoung Suhprogress
04/19/2023Structural Stability – Alterations of existing buildingsYoung Suhspecial
04/19/2023Structural Steel - High Strength BoltingYoung Suhspecial
04/19/2023Structural Steel - WeldingYoung Suhspecial
04/19/2023FinalYoung Suhprogress
04/19/2023Structural Steel - DetailsYoung Suhspecial
08/15/2022Maintenance informationYoung Suhenergy_progress
08/15/2022Mechanical SystemsYoung Suhspecial
08/15/2022Energy Code Compliance InspectionsYoung Suhprogress
08/15/2022FinalYoung Suhprogress
08/15/2022HVAC-R and service water piping design and insulationYoung Suhenergy_progress
08/15/2022Electrical motors and elevatorsYoung Suhenergy_progress
02/02/2022Mechanical SystemsYoung Suhspecial
02/02/2022Energy Code Compliance InspectionsYoung Suhprogress
02/02/2022Maintenance informationYoung Suhenergy_progress
02/02/2022HVAC-R and service water piping design and insulationYoung Suhenergy_progress
02/02/2022Electrical motors and elevatorsYoung Suhenergy_progress
02/02/2022FinalYoung Suhprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NYU Langone HealthMedical / HealthcareFloor 4, Mezzanine
Project M00862093 Alteration · LOC Issued · 04/21/2023
Project M00862116 Alteration · LOC Issued · 04/21/2023
Project M00673083 Alteration · LOC Issued · 01/25/2023
Project M00793455 Alteration · LOC Issued · 10/05/2022
Project M00673059 Alteration · LOC Issued · 04/06/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 894 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
09/02/2026M00673059-I1Request digital key ↗
09/01/2026M00793455-I1Request digital key ↗
09/01/2026M00673083-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00341276-I1Request digital key ↗
▸Applications & Permits184
▸BISWORK PERMIT APPLICATION96
04/15/2019123674238Open ↗
08/01/2016140200967Open ↗
03/18/2016121182139Open ↗
Showing 3 of 96 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION86
02/15/2019123674238Open ↗
09/13/2016140200967Open ↗
08/23/2016140240727Open ↗
Showing 3 of 86 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records5
▸BISZRD1-Zoning Resolution Determination3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
04/13/2018120448293Open ↗
▸Seals & Professional Certifications147
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION114
07/05/2019123674238Open ↗
07/05/2019123674238Open ↗
07/05/2019123674238Open ↗
Showing 3 of 114 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026M00793455-I1Open ↗
09/01/2026M00673083-I1Open ↗
08/31/2026M00862093-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/29/2026M00862116-I1Open ↗
09/01/2026M00793455-I1Open ↗
09/01/2026M00793455-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/29/2026M00862116-I1Open ↗
09/01/2026M00793455-I1Open ↗
08/26/2026M00673059-I1Open ↗
▸Trade Schedules & Equipment98
▸BISSELF-CERT PLUMBING NOTICE38
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 38 on file for this type
▸BISSCHEDULE B - PLUMBING32
08/23/2016140240727Open ↗
Showing 1 of 32 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA20
10/03/2016121701417Open ↗
08/03/2016121701417Open ↗
03/15/2016122159699Open ↗
Showing 3 of 20 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-841
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection2
▸BISStreet Trees- Receipt of Street Trees Site Plan2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos30
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWOER: Notice to Proceed6
08/13/2026M00673083-I1Open ↗
08/13/2026M00862116-I1Open ↗
08/13/2026M00673059-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/13/2026M00673059-I1Open ↗
08/13/2026M00341276-I1Open ↗
08/13/2026M00673083-I1Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION5
09/14/2016121182139Open ↗
01/19/2016121331683Open ↗
Showing 2 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED4
03/22/2019123674238Open ↗
01/26/2017122085965Open ↗
Showing 2 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance40
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
07/05/2019123674238Open ↗
02/15/2019123674238Open ↗
02/15/2019123674238Open ↗
Showing 3 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
07/05/2019123674238Open ↗
05/22/2017121325262Open ↗
05/22/2017121325422Open ↗
Showing 3 of 12 on file for this type
▸BISTR8: Energy Code Progress Inspections10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00673059-I1Open ↗
▸Inspections & Test Reports23
▸BISTECHNICAL REPORT: RESPONSIBILITY8
03/02/2016140428464Open ↗
Showing 1 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE-TEST CYLINDER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS3
03/02/2016140428464Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs144
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST80
07/05/2019123674238Open ↗
11/19/2018120448293Open ↗
11/08/2018120448293Open ↗
Showing 3 of 80 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION33
02/05/2021123906773Open ↗
02/05/2021123906773Open ↗
01/25/2021123906773Open ↗
Showing 3 of 33 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
09/01/2026M00673083-I1Open ↗
08/13/2026M00862116-I1Open ↗
08/13/2026M00862093-I1Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS2
10/03/2018120448293Open ↗
10/03/2018120448293Open ↗
▸BISTRANSIT AUTHORITY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLANDMARKS APPROVAL1
01/05/2017121450269Open ↗
▸BISBSA/CPC APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership71
▸BISCOST AFFIDAVIT65
07/05/2019123674238Open ↗
02/15/2019123674238Open ↗
05/22/2017140240727Open ↗
Showing 3 of 65 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Filing & Intake Forms95
▸BISADDITIONAL INFORMATION44
02/05/2021123906773Open ↗
04/08/2019123674238Open ↗
06/01/2018121841588Open ↗
Showing 3 of 44 on file for this type
▸BISEFILING COVER SHEET28
01/25/2021123906773Open ↗
02/15/2019123674238Open ↗
Showing 2 of 28 on file for this type
▸BISBOROUGH INTAKE FORM12
01/25/2021123906773Open ↗
07/05/2019123674238Open ↗
11/19/2018120448293Open ↗
Showing 3 of 12 on file for this type
▸BISeFiling Job Application Cover Sheet11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸Other Documents34
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION24
02/15/2019123674238Open ↗
02/13/2018120448293Open ↗
02/13/2018120448293Open ↗
Showing 3 of 24 on file for this type
▸BISSupporting Document: Fee Exempt3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLOT DIAGRAM2
10/03/2018120448293Open ↗
Showing 1 of 2 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/05/2021123906773Open ↗
▸BISBPP-DOT: RELOCATE STREET LIGHT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type