| Owner | Filings | Most Recent |
|---|---|---|
| IMH REAL ESTATE | 17 | 09/13/2026 |
| SDC CONSULTING | 2 | 08/29/2026 |
| AMHS REALTY | 4 | 03/22/2026 |
| OWNER OF 1209 OAK POINT A | 1 | 03/22/2026 |
| SMH18LLC | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ALSIEUX ARCHITECTURE, LLC. | 3 | 07/22/2026 |
| AG ENGINEERING PLLC | 2 | 06/10/2026 |
| JAHMAL SABAHA PE CONSULTING ENGR | 2 | 12/29/2025 |
| RS DESIGN ASSOCIATES, INC. | 1 | 12/19/2024 |
| GINO O. LONGO, ARCHITECT | 5 | 01/08/2024 |
| HUGH CHRYSLER ENGINEERING CO LLC | 2 | 02/19/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| KMS DRAFTING | 4 | 03/21/2026 |
| HUGH CHRYSLER ENGINEERING | 4 | 03/21/2026 |
| RS DESIGN ASSOCIATES | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| S. TIEGER PLBG. CO., INC | Plumbing | 5 | 07/08/2026 |
| FALCON CONSTRUCTION & DEVELOP | General Contractor | 2 | 03/21/2026 |
| RALPH RUSSO | Electrical | 1 | 03/21/2026 |
| SQUILLANTE, A | Electrical | 1 | 03/21/2026 |
| MERVIN TONEY | Electrical | 1 | 03/21/2026 |
| C JAMES PLBG & HTG INC | Plumbing | 1 | 07/04/2026 |
| PELHAM PLUMBING & HTG CORP | Plumbing | 1 | 07/08/2026 |
| MUALLIUMS, SULAYMAN | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| BUTTERFIELD & O'CONNOR | 4189 | 1 | 07/22/2026 |
| GINO O. LONGO ARCHITETCT | 331 | 3 | 01/08/2024 |
| HUGH CHRYSLER ENGINEERING | 4251 | 2 | 02/19/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | C JAMES PLBG & HTG INC | 07/02/2026 |
| DOB NOW | Plumbing | Signed-off | S. TIEGER PLBG. CO., INC | 08/28/2023 |
| DOB NOW | Plumbing | Signed-off | PELHAM PLUMBING & HTG COR | 09/19/2022 |
| DOB NOW | General Construction | Signed-off | FALCON CONSTRUCTION & DEV | 08/16/2022 |
| BIS | MH | ISSUED | HUGH CHRYSLER CONTRACTING | 09/11/2018 |
| BIS | PL | ISSUED | ROY B PLUMBING & HEATING | 09/11/2018 |
| BIS | OT | ISSUED | OLYMPIAN FUEL OIL CORP | 07/14/2014 |
| BIS | FB | ISSUED | OLYMPIAN FUEL OIL CORP | 07/03/2014 |
| BIS | EQ | ISSUED | J & G GENERAL CONTRACTING | 09/02/2009 |
| BIS | FP | ISSUED | MASTER FIRE SYSTEMS, INC | 08/30/2005 |
| BIS | OT | ISSUED | ALTEK CONSTRUCTION CORP. | 12/23/2004 |
| BIS | FP | ISSUED | ACTIVE FIRE EXTINGUISHER | 10/24/1991 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/22/2026 | — | — | Heating and Air Conditioning Systems, Others | Heat / Cool Gree LIVV SERIES 4L1V24HP230V1A0 24,000 BTU · Heat Pump Outdoor ×3 Mitsubishi Electric MUZ-FW06NAHZ 6,000 BTU · Heat Pump Outdoor ×1 Other Dayton 7YR30 3,320 CFM · Kitchen Exhaust ×1 |
| 06/10/2026 | — | — | Heating and Air Conditioning Systems | Heat / Cool Trane TRANE MODEL# YSK120 10 tons · Rooftop Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/19/2021 | — | — | Gas |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/23/2026 | Permit Issued | INTAKE ELECT CONT CORP | General Wiring |
| 02/09/2026 | Complete | JOSEPH WEINSTEIN ELECTRIC | 1 meters, 1 new_meters |
| 05/18/2023 | Complete | JOSEPH WEINSTEIN ELECTRIC | 2 meters, 1 new_meters |
| 09/15/2022 | Complete | ATMOS ELECTRIC SVCE CORP | General Wiring |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/08/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/25/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 07/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 03/26/2024 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 02/27/2024 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 02/08/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/08/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/14/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/19/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/28/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/09/2026 | Mechanical Systems | BRIAN T. O'CONNOR | special |
| 07/09/2026 | Final | Vicente Varela | progress |
| 04/25/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 04/25/2026 | Lighting controls | — | energy_progress |
| 04/25/2026 | Interior lighting power | — | energy_progress |
| 04/25/2026 | Metering | — | energy_progress |
| 04/25/2026 | Energy Code Compliance Inspections | — | progress |
| 12/15/2025 | HVAC-R and service water heating equipment | — | energy_progress |
| 12/15/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 12/15/2025 | Maintenance information | — | energy_progress |
| 12/15/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 12/15/2025 | Energy Code Compliance Inspections | — | progress |
| 12/15/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 11/21/2025 | Sprinkler Systems | — | special |
| 12/17/2024 | Fire-Resistant Penetrations and Joints | — | special |
| 12/17/2024 | Interior lighting power | ERROL CRAWFORD | energy_progress |
| 12/17/2024 | Lighting controls | ERROL CRAWFORD | energy_progress |
| 01/09/2024 | Structural Stability – Alterations of existing buildings | GINO LONGO | special |
| 01/09/2024 | Masonry | GINO LONGO | special |
| 01/09/2024 | Fire-Resistant Penetrations and Joints | GINO LONGO | special |
| 01/09/2024 | Energy Code Compliance Inspections | GINO LONGO | progress |
| 01/09/2024 | Fire-Resistance Rated Construction | GINO LONGO | progress |
| 01/09/2024 | Final | GINO LONGO | progress |
| 01/09/2024 | Exterior lighting power | GINO LONGO | energy_progress |
| 01/09/2024 | Lighting controls | GINO LONGO | energy_progress |